My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Traffic Control Device - New Installation 2 Hour Parking Electric Vehicles Only
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Traffic Control Devices
>
Traffic Control Device - New Installation 2 Hour Parking Electric Vehicles Only
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 7:55:26 AM
Creation date
8/28/2019 11:15:37 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BOARD OF PUBLIC WORKS <br />Request t for Approval of <br />".' <br />Traffic Control Devices) <br />Date: August 19,2019 Date of BPW Meeting: August. 2,7, 2019 Traffic Request Number: N/A <br />I hereby submit the following installation or change of traffic control devices for review: <br />. .......... __ __�....................�.......................� e �. <br />® New Installation F1 Removal F1 Revision <br />❑ Stop Sign ❑ Stop Sign Stop Sign <br />❑ Yield Sign ❑Yield Sign Yield Sign <br />❑ Speed Limit, _mph ❑ Speed Limit, mph Speed Limit, _mph <br />® Other, List ❑ Other, List Other, List <br />2-Hr Parking — Electric Vehicles Only <br />with arrow (2) <br />EV Sign Assembly (1) <br />Location(s): 2 eastern -most parking spaces at the SW corner of the intersection of Jefferson Blvd. and St. Louis Blvd. (see <br />attached drawine for more details) <br />This has been submitted: <br />❑ In response to request by a citizen/ neighbor/ passerby: <br />❑ In response to contracted reconstruction or improvements <br />❑ In response to developer -provided reconstruction or improvement <br />® In response to an internally -generated concern from Therese Dorau, Director of Sustainability <br />Remarks: As part of the Howard Park Redevelopment Project, the Sustainability Office requests the Board of Public Works <br />designate twos ecific arallel on -street arkin s aces for "2 Hr Parkin Electric Vehicles Onl " <br />.. f p. l? ....g - ._� .. _ .... <br />Submitted & Proposed by: <br />' tee cs E. Harrison, PE, ENV SP <br />Traffic Engineer <br />Date: August 19, 2019 <br />Recommend t�rov� <br />enial: <br />City <br />Date: <br />APPROVED: SOUTH BEND BOARD OF PUBLIC <br />WORKS <br />Gary A Piiait, Preside t <br />�.�.�F�ai�xal�et�l� A. Ma�..-: .�. �:..� �....._...................................._�. � � �A�� . M aradik, Member <br />_ _........__ �.�...................... ________...................... <br />erese J. orau, Membellh�r <br />Laura L. O'Sullivan, Member <br />Genevieve E. Miller, Member <br />Distribution: <br />Bureau of Traffic and Lighting <br />South Bend Police Department Traffic Division <br />Boyles, Pl <br />i eer <br />a M. Martm lerl <br />�.................. 3 7..� /_y........... <br />Date <br />Roger T. Nawrot, P.E., P.L.S. - Assistant City Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.