Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: 2019 Curb and Sidewalk Construction <br />Project Number: 119-004 <br />For Bids Due: May 14, 2019 at 9:30am Local Time <br />Contractor Name: Rieth-Riley Construction Co., Inc. <br />)IVISION <br />Al <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />364 <br />SYS <br />SNM10 <br />920.0 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />364 <br />SYS <br />00 <br />21 U <br />3 <br />CONCRETE CURB, REMOVE <br />603 <br />LFT <br />514.00 <br />58,442.00 <br />4 <br />CONCRETE CURB, MODIFIED <br />603 <br />LFT <br />5 0 <br />21 1 5. <br />5 <br />CONCRETE APPROACH, REMOVE <br />50 <br />SYS <br />24.00 <br />51.200.0Q <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />50 <br />SYS <br />107.0 <br />5 35 . <br />7 <br />TOPSOIL AND SEEDING <br />454 <br />SYS <br />14,32 <br />f 501.28 <br />11 <br />TREE, REMOVE, 30 IN <br />2 <br />EA <br />$1,30Q.QQ <br />$2&00.00 <br />13 <br />STUMP, REMOVE <br />1 <br />EA <br />S55Q,QQ <br />$559-pp- <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE <br />$650.00 <br />$1,950.00 <br />STEM 2-IN TO 2.5 IN <br />3 <br />EA <br />15 <br />CURB RAMP, REMOVE <br />40 <br />SYS <br />soug <br />$2.440.00 <br />16 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />8 <br />SYS <br />2201 <br />1 7f0. <br />17 <br />PAIRED PERPENDICULAR CURB RAMP <br />16.0 <br />SYS <br />$165.00 <br />$2,640.00 <br />18 <br />DEPRESSED CORNER CURB RAMP <br />16.0 <br />SYS <br />$137.00 <br />$2,192.00 <br />DIVISION Al TOTAL 188,762.28 <br />)IVISION <br />B1 <br />Item <br />No. <br />Description Quantity Unit Unit Price Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />179 <br />SY <br />32.00 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />179 <br />SY <br />S61QQ10 <br />91 <br />3 <br />CONCRETE CURB, REMOVE <br />242 <br />LF <br />816.00 <br />S3.872,00 <br />4 <br />CONCRETE CURB, MODIFIED <br />242 <br />LF <br />34.00 <br />8 2.28 0 <br />5 <br />CONCRETE APPROACH, REMOVE <br />20 <br />SY <br />50m00 <br />$1.200.00 <br />6 <br />PCCP FOR APPROACHES 6-IN <br />20 <br />SY <br />69.00 <br />81380.0Q <br />7 <br />TOPSOIL AND SEEDING <br />242 <br />SY <br />519,24 <br />84,656.0 <br />DIVISION 131 TOTAL $35,983.08 <br />DIVISION C1 <br />Item <br />No.. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />320 <br />SYS <br />35.00 <br />$112QQ,00 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />320 <br />SYS <br />$56.00 <br />$17,92Q,00 <br />3 <br />CONCRETE CURB, REMOVE <br />631 <br />LFT <br />$14.50 <br />$9,149.50 <br />4 <br />CONCRETE CURB, MODIFIED <br />631 <br />LFT <br />$18,930.00 <br />5 <br />CONCRETE APPROACH, REMOVE <br />162 <br />SYS <br />, 22 <br />3 64T00 <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />162 <br />SYS <br />5129,QQ <br />S2 898 0 <br />7 <br />TOPSOIL AND SEEDING <br />631 <br />SYS <br />S12.78 <br />.1. <br />11 <br />TREE, REMOVE, 30 IN <br />1 <br />EA <br />1 0.00 <br />. <br />t$1,400.00 <br />13 <br />STUMP, REMOVE <br />1 <br />EA <br />550.00 <br />0 <br />PLANT, DECIDUOUS TREE, SINGLE <br />$700.00 <br />14 <br />STEM, 2-IN TO 2.5 IN <br />2 <br />EA <br />15 <br />CURB RAMP, REMOVE <br />32 <br />SYS <br />34,00 <br />1,088,00 <br />17 <br />PAIRED PERPENDICULAR CURB RAMP <br />32 <br />SYS <br />166.005,312,00 <br />DIVISION C1 TOTAL - $997.68 <br />Version 10/17/2017 Contractor's Bid for Public Works -1 <br />