My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C(2) Amendment to Proposal
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2009
>
06/05/09 Meeting
>
6C(2) Amendment to Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2009 9:42:43 AM
Creation date
6/3/2009 9:42:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • SOUTH B <br />i0~ ,Ali IBC;/i ~~O <br />Community & Economic Development ~~~a <br />- 1865 . <br />1200 County-City Building, 227 West Jefferson, South Bend, Indiana 46601-1 830 Phone 574/235-9371 Fax 574/235-9021 <br />To: Redevelopment Commission <br />From: Bill Schalliol, Economic Development Planner <br />Subject: Voorde Drive Improvement Project <br />Date: June 1, 2009 <br />In 2004, the city staff identified a need to improve infrastructure and traffic circulation within <br />the Airport Industrial Park, Phase 1 and 2 parks southeast of the airport. As part of the <br />work, the city identified a need to upgrade and extend Voorde Drive from Sheridan Drive <br />west to the airport drive network, improve and upgrade the intersection at Voorde and <br />Bendix to better accommodate truck traffic and to make improvements on Sherdian and <br />Commerce Drive. <br />As a result of the reinvestment into the park, many businesses have moved in to the park or <br />expanded their operations like Hoosier Tank, Fortis Plastics, Enzyme Research, Danch <br />Harner & Associates, and Stanz Foodservice. The extension of Voorde Drive into the <br />airport has also been beneficial as it provides an access point from the east to gain access <br />into the airport. <br />As part of the work being completed this spring at the intersection of Bendix and Voorde, <br />staff has explored and requested a proposal of the contractor doing the project at the <br />intersection to provide a proposal for resurfacing of the entire surface of Voorde Drive from <br />the intersection of Sheridan to the project limits of the Bendix project. There is currently a <br />2200 LF section that was not going to be paved, but the purpose of this request is to ask <br />Commission approval to increase the project budget by $90,000.00 to pave this section of <br />roadway. By paving the roadway now, it will have a lifespan equal to that of the intersection <br />at Bendix that is waiting for a final coat of surface. This section of roadway has seen <br />increased traffic and the current condition of the roadway requires a resurfacing in the near <br />future. <br />Staff requests your approval of the addition of $90,000 to the current project budget of <br />$222,000 to properly address the infrastructure needs of this revitalizing and growing older <br />industrial park area. <br />What We Do Today Makes A Difference! <br />
The URL can be used to link to this page
Your browser does not support the video tag.