My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B2
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2013
>
12-12-13
>
6B2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2014 12:22:53 PM
Creation date
12/10/2013 9:55:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
%/S Cz) <br />Department of <br />Community Investment <br />Memorandum <br />Monday, December 9, 2013 <br />TO: Redevelopment Commission <br />FROM: Michael Divita fw <br />SUBJECT: Ignition Park Infrastructure Phase 1B Construction Documents <br />Attached to this memorandum is Resolution 3190 and Amendment to the Addendum to the Master <br />Agency Agreement (Ignition Park Phase 1B Infrastructure - Supplement #1) for Ignition Park <br />Infrastructure Phase 1B construction documents. The Amendment authorizes the Board of Public <br />Works to act as the Commission's agent, and it sets a total budget of $287,400 for BSA <br />LifeStructures to complete plans and bid specifications. <br />On October 11, 2011, the Redevelopment Commission approved a $335,000 proposal from BSA to <br />begin developing the design for the second portion of the Ignition Park infrastructure (Phase 113). <br />Since that time, as part of that contract, BSA has completed design of rough grading of the site and <br />developed a revised conceptual design for the infrastructure. The new infrastructure system is much <br />leaner than initially envisioned and reflects feedback received from developers about maximizing <br />development sites. About 30% of the budget for the preliminary design remains unspent; these <br />remaining funds are to be returned to the Airport Economic Development Area TIF reserve to be used <br />for future projects. <br />The current proposal from BSA, which reflects the revised concept, includes the development of <br />construction documents (plans and bid specifications) for the following elements: <br />North -south street and sidewalks connecting Sample Street to the circle at the center of the <br />Park, <br />• Street lighting and landscaping, <br />• Utilities (water, sewer, electric, gas, communications), <br />• Drainage and stormwater management, and <br />Final site grading. <br />Staff requests approval of Resolution 3190 and Amendment to the Addendum to the Master Agency <br />Agreement (Ignition Park Phase 1B Infrastructure - Supplement #1), including the $287,400 budget <br />from the Airport Economic Development Area TIF. <br />227 W. JEFFERSON BLVD. SOUTH BEND, IN 46601 1 P: 574 - 235 -9371 1 FAX: 574 - 235 -9021 1 SOUTHBENDIN.GOV <br />
The URL can be used to link to this page
Your browser does not support the video tag.