My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6A(02)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2013
>
08-15-13
>
6A(02)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2014 12:10:29 PM
Creation date
8/13/2013 9:07:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�SpU Ty e�� <br />Department of <br />Community <br />1865 <br />Memorandum <br />August 12, 2013 <br />Investment <br />TO: Redevelopment Commission <br />FROM: Chris Dressel, Staff <br />SUBJECT: Resolution No. 3154 & Addendum to the Master Agency Agreement - <br />Hill & Colfax Drainage Improvements <br />Staff approached the commission in June to present plans for development of the <br />commission owned property on the northwest corner of Hill Street and Colfax Avenue <br />as a mixed use building planned by Colfax Hill Partners, LLC. Prior to development, <br />there's a need to address site drainage. <br />The proposed project consists of eliminating an existing detention basin and drywell <br />system due to planned new construction on the site and providing a new detention <br />storage facility, while maintaining the current outlet rate to the City drainage system. It <br />is likely that the drywell structures in the adjacent parking lot are also connected to this <br />detention basin. Per the written proposal provided by Abonmarche, the project scope of <br />services should include the following: <br />• performing a field survey /conducting utility locates <br />• preliminary engineering including providing storage location and method options <br />• preparing construction documents and complete bid package <br />• providing bid period services including recommendation for contract award <br />The proposed work plan calls for: completion of services above within 5 weeks; start of <br />the City of South Bend bid process in mid - September; and project construction <br />commencing by mid - October. <br />Staff requests approval of Resolution No. 3145 and Addendum to the Master Agency <br />Agreement, in a not -to- exceed amount of $8,200. <br />227 W. JEFFERSON BLVD. SOUTH BEND, IN 46601 1 P: 574 - 235 -9371 1 FAX: 574 - 235 -9021 1 SOUTHBENDIN.GOV <br />
The URL can be used to link to this page
Your browser does not support the video tag.