My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5B2 Budget Request (Ewing Trail Design) - Signed
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2026
>
06.25.2026
>
Signed Items
>
5B2 Budget Request (Ewing Trail Design) - Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2026 2:23:41 PM
Creation date
6/25/2026 2:23:39 PM
Metadata
Fields
Template:
Dept of Community Investment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09 South Bend <br />y Redevelopment Commission <br />p <br />215 S. Dr. Martin Luther King, Jr. Blvd., Room 301, South Bend, Indiana <br />Redevelopment Commission Agenda Item <br />DATE: June 18, 2026 <br />FROM: Nifemi Oluwatomini <br />Senior Engineer <br />SUBJECT: Budget Request- Ewing trail design <br />Pres/V-Pres <br />ATTEST: Secretary <br />Date: Z 2S 1 2 ' <br />CVAPPROVED ❑ Not Approved <br />SOUTH BEND REDEVELOPMENT COMMISSION <br />Funding Source' (circle) River West; River East; 6outh Side; �)ouglas Road; West Washington; RDC General; Riv. East Res. <br />* Funds are subject to the City Controller's determination ability: if funds are unavailable, as solely determined by the City Controller, <br />then the authorization of the expenditure of such funds shall be void and of no effect. <br />PURPOSE OF REQUEST: <br />This budget request is for $200,000 for the design of Ewing trail located on the south side of Ewing Ave <br />from Gertrude to Olive <br />SPECIFICS: <br />The budget request represents the first funding request toward the design of the New Ewing Trail, a <br />proposed 10-foot separated multi -use path that will connect the existing trail south of E. Ewing Avenue to <br />Olive Street. <br />The initial request is for $200,000, which will cover design services through Stage 1 Review, equivalent to <br />30% design plans. In addition to the trail design, the funding will support an engineering assessment of the <br />Ewing Avenue/Prairie Avenue intersection to help guide the City's selection of an appropriate intersection <br />improvement. <br />The project is INDOT funded, with 80% of the costs being reimbursed. <br />It is requested that the Redevelopment commission approves $200,000 from South Side TIF to cover the <br />design until the stage 1 review (30%). <br />
The URL can be used to link to this page
Your browser does not support the video tag.