Laserfiche WebLink
09 South Bend <br />y Redevelopment Commission <br />p <br />215 S. Dr. Martin Luther King, Jr. Blvd., Room 301, South Bend, Indiana <br />Redevelopment Commission Agenda Item <br />DATE: June 18, 2026 <br />FROM: Nifemi Oluwatomini <br />Senior Engineer <br />SUBJECT: Budget Request- Ewing trail design <br />Pres/V-Pres <br />ATTEST: Secretary <br />Date: Z 2S 1 2 ' <br />CVAPPROVED ❑ Not Approved <br />SOUTH BEND REDEVELOPMENT COMMISSION <br />Funding Source' (circle) River West; River East; 6outh Side; �)ouglas Road; West Washington; RDC General; Riv. East Res. <br />* Funds are subject to the City Controller's determination ability: if funds are unavailable, as solely determined by the City Controller, <br />then the authorization of the expenditure of such funds shall be void and of no effect. <br />PURPOSE OF REQUEST: <br />This budget request is for $200,000 for the design of Ewing trail located on the south side of Ewing Ave <br />from Gertrude to Olive <br />SPECIFICS: <br />The budget request represents the first funding request toward the design of the New Ewing Trail, a <br />proposed 10-foot separated multi -use path that will connect the existing trail south of E. Ewing Avenue to <br />Olive Street. <br />The initial request is for $200,000, which will cover design services through Stage 1 Review, equivalent to <br />30% design plans. In addition to the trail design, the funding will support an engineering assessment of the <br />Ewing Avenue/Prairie Avenue intersection to help guide the City's selection of an appropriate intersection <br />improvement. <br />The project is INDOT funded, with 80% of the costs being reimbursed. <br />It is requested that the Redevelopment commission approves $200,000 from South Side TIF to cover the <br />design until the stage 1 review (30%). <br />