My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - River Crossing 1&2 Stair - HRP Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Award Quotations & Proposals
>
Award Quote - River Crossing 1&2 Stair - HRP Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2025 2:31:25 PM
Creation date
11/14/2023 2:14:48 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C►ONSTRUCTION1 <br />EXCAVATING•SEWERS•WATERMAINS <br />`�' VV02f2CYLQ JU �i IJ�JE4CTCeG,� <br />August 24, 2023 <br />Mr. Richard Radcliff, CSO Operations Mgr. <br />City of South Bend Wastewater <br />3113 Riverside Drive <br />South Bend, IN 46608 <br />Re: River Crossing 1 & 2 — 304 Stainless Steel Ladder Extensions <br />Dear Mr. Radcliff, <br />HRP Construction is providing the material, labor, and equipment quote to provide and <br />install the listed (304) stainless steel ladder extensions as outlined below. Please <br />review attached ladder extension drawings for approval at each location and provide as <br />much lead time as possible. The ladder builds will take up to 4 weeks to build upon <br />notice to proceed and contract. HRP will schedule the work as soon as possible. <br />River Crossing #1 — 304 SS (See attached ladder extension drawingsl <br /># 1 -Ladder Extension — 3'- 6" Ladder Extension <br /># 2 -Ladder Extension — 6'- 6" Ladder Extension <br />River Crossing #2 — 304 SS (See attached ladder extension drawings) <br /># 1 - Ladder Extension —13' -9" Ladder Extension <br /># 2 — Ladder Extension — 5' - 6" Ladder Extension <br />Our total price for this work is $ 26,000.00 <br />Quote: Valid for 15 days from date of quote. <br />Please let me know if you have any questions about this proposal or need anything <br />else. <br />Sincerely, <br />J . Wells <br />Estimator/Project Manager <br />CITY OF SOUTH BEND, INDIANA <br />BOARD OF PUBLIC WORKS <br />tV�a <br />Elizabeth A. Maradik, President <br />lb <br />Gary A. Gilot, Member <br />pe-, L <br />Murray L. Miller, Member <br />Joseph R. Molnar, Vice President <br />Alexandra Dolz-Lane, Member <br />Attest: Theresa M. Heffner, Clerk <br />Date: November 14, 2023 <br />1!F9ua[(10 15 so¢Eur1ty Enzplotfc¢ <br />Shipping: 5777 Cleveland Road South Bend, IN 46628-9418 Phone 574-271-7800 <br />Mailing: P.O. Box 266 South Bend, IN 46624-0266 FAX 574-271-0524 <br />
The URL can be used to link to this page
Your browser does not support the video tag.