My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DPW Report to the IPC Board_September_2022
sbend
>
Public
>
Inclusive Procurement and Contracting Board (MBE/WBE)
>
Agendas & Packets
>
2022
>
10-04-2022
>
DPW Report to the IPC Board_September_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2022 2:19:18 PM
Creation date
9/29/2022 2:17:53 PM
Metadata
Fields
Template:
City Council - City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
September 2022 <br />Detailed Report <br />BPW Updates to IPC Board: <br /> Bid/Quotes with MWBE Goals for the period beginning Jan 1, 2021 to September 27, 2022 <br /> <br />1. Lincolnway West and Olive Streetscape <br />a. Awarded 5/11/2021 to Rieth-Riley <br />b. Contract Goals: <br />i. MBE 2.43% <br />• Bid with V&R Trucking (2.58%) <br />ii. WBE 4.94% <br />• Bid with Hawk Inc. (31.73%) <br />c. Contract Amount: <br />i. Awarded: $1,740,871.20 <br />ii. Current: $1,802,048.78 <br />d. PM: Finn Cavanaugh, Inspector: Dan Jones <br />e. Contract Completion Date: 10/22/2021 <br />f. Status: Complete, closeout documents in process <br />g. PCA estimated for October 2022 <br /> <br />2. 2021 Road Rehab <br />a. Awarded on 6/22/2021 to Rieth Riley <br />b. Contract Goals: <br />i. MBE: 3.2% <br />• Met with V&R Trucking (3.2%) <br />ii. WBE: 5.6% <br />• Met with V&R Trucking (3.3%), State Barricading, (0.8%), CE Hughes <br />(1.5%) <br />c. Contract Amount: $1,997,416.06 Awarded (Final: $2,106,346.88) <br />d. PM: Leslie Biek <br />e. Project Duration: 5/1/2022 <br />f. PCA TBD <br /> <br />3. Mayflower and Sample Intersection Improvements (120 -052R) <br />a. Awarded on 7/13/2021 to Milestone Contractors N <br />b. Contract Goals: <br />i. MBE 2.3% <br />• Met with V&R Trucking (1.15%) and C. Lee Construction (1.15%) <br />ii. WBE 4.9% <br />• Met with Traffic Control Specialists (7.32%)
The URL can be used to link to this page
Your browser does not support the video tag.