My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 Claims
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2013
>
01-24-13
>
3 Claims
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2014 11:43:16 AM
Creation date
1/24/2013 8:18:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
430 FUND SOUTH SIDE DEVELOPMENT TIF AREA #1 <br />Lawson - Fishier Associates, P.C. 119,849.31 South Main St. to Lafayette Blvd Connector <br />$ 526,053.01 2,62235 <br />$ 528,680.42 <br />APPROVED" <br />w. <br />k ♦r 1. �i s... ..� <br />Items added <br />Claims <br />Explanation of Project <br />after Agenda <br />REDEVELOPMENT COMMISSION <br />submitted <br />Distributed <br />Redevelopment Commission Claims submitted January 24, 2013 for approval <br />324 AIRPORT AEDA <br />Faegre Baker Daniels <br />20,636.62 <br />Legal Services <br />Stanley &Kyna Doaks <br />395.00 <br />Reimbursement of Costs of Purchase Agreement <br />EpIxii <br />31,327.40 <br />F -Cubed <br />Hull& Associates, Inc. <br />5,482.59 <br />MV & SVP - Installation and RAP Preparation: Ignition Pk. <br />Meridian Title Corporation <br />400.00 <br />Title Seachers <br />Fisher Scientific <br />6,172.42 <br />F -Cubed <br />Accel Instruments <br />1,728.00 <br />F -Cubed <br />Code of America <br />110,000.00 <br />Al location of Ai rport TI F Fu nds <br />Hull& Associates, l nc. <br />5,540.00 <br />Extended General Consulting Contract <br />John Boettcher Sewer & Excavating <br />131,98233 <br />Olive Road Basin <br />420 FUND TIF DISTRICT -SBCDA GENERAL <br />Arri System Parking <br />1,460.84 <br />St. Joseph Surface Ga rage /255 Me in Street <br />Edwa rd J. White, Inc. <br />761.06 <br />Furnished& Installed a 40 gallon Electric Water Hea ter <br />CB Richard Ellis <br />827.66 <br />Management & Maintenance Fee <br />1,227.35 <br />Schindler <br />168.93 <br />Elevator Maintenace Service <br />Shakespeare Lighting Design <br />1,]53.0] <br />River to Lighting <br />Meridian Title Corporation <br />250.00 <br />Title Seachers <br />1,400.00 <br />Carl Walker Inc <br />1, 266.00 <br />Examine Recommend Repairs of Failure of Wayne St Parking <br />422 TIF DISTRICT WEST WASHINGTON <br />South Bend Heritage Founddation ,Inc. <br />83,116.46 <br />Disbursement Agreement W /Historic Rushton <br />429 TIF FUND NORTHEAST DISTRICT <br />Christophers B. Burke Engineering <br />2,385.00 <br />So. Bend 5 Points Utility Study <br />430 FUND SOUTH SIDE DEVELOPMENT TIF AREA #1 <br />Lawson - Fishier Associates, P.C. 119,849.31 South Main St. to Lafayette Blvd Connector <br />$ 526,053.01 2,62235 <br />$ 528,680.42 <br />APPROVED" <br />w. <br />k ♦r 1. �i s... ..� <br />
The URL can be used to link to this page
Your browser does not support the video tag.