My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Olive St. Pavement Reconstruction, Phase II Proj No. 114-064 - USI Consultants, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Proposals - Olive St. Pavement Reconstruction, Phase II Proj No. 114-064 - USI Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 2:54:50 PM
Creation date
9/14/2021 2:54:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 City of South Bend| Inspection of Olive Street Phase 2 Road Improvements at RR Xing | R-43125 | Des. #1920178 <br />USI MAIN OFFICE <br />8415 East 56th St. <br />Indianapolis, IN <br />317.544.4996 <br />Dear City of South Bend, <br />USI Consultants, Inc. (USI) is pleased to submit our letter <br />of interest and offer professional construction inspection <br />services to the City of South Bend for Contract R-43125 – <br />Olive Street Phase II Road Improvements at RR Xing (Des. <br />#1920178) in the LaPorte District. <br />OUR TEAM IS ALL IN <br />USI’s Construction Project Supervisor, Justin Sherman, will <br />lead the charge! Justin has 13 years of experience working <br />with the INDOT LaPorte District and federal aid projects, as <br />well as many other locally funded projects within the City <br />of South Bend. <br />Mark Whitten will accompany Justin, acting as lead <br />inspector. Both Justin and Mark’s history with Phase <br />I of this project will be invaluable in the construction <br />of Phase II. Since they have witnessed the utility and <br />constructability concerns in Phase I, they can help to <br />resolve these issues early on, which will reduce added <br />costs, keeping the project on time. Their combined history <br />of successful projects in the City of South Bend and INDOT <br />district is irreplaceable. However, should a situation call <br />for additional resources, USI has other experienced team <br />members ready and available at our nearby LaPorte office. <br />COMMUNICATION <br />USI promises to reply to you within 24 hours to ensure a <br />rapid response to any of your questions or concerns. Justin <br />has a vast range of experience when dealing with property <br />owners and concerned citizens who are not always on- <br />board with the project. He will always remain professional <br />and represent the interests of the City of South Bend. <br />Justin will stay in direct contact with you by providing <br />weekly updates on the projects progress. Please know, the <br />USI team will respond quickly and efficiently to whatever <br />variables come our way. <br />SIMILAR PROJECT EXPERIENCE <br />We have been the construction management and <br />inspection consultant for countless road improvement <br />projects. Whether a large or small project, we are <br />always 100% committed to ensuring each project success! <br />UTILITY RELOCATION EXPERIENCE <br />Most federally funded projects in Indiana involve extensive <br />utility challenges, which Justin and Mark had to face with <br />Olive Street Phase I and are fully equipped to handle in <br />Phase II. Their experience with the Norfolk Southern <br />Railroad and the staff members of the utilities will benefit <br />the City and allow them to deliver a quality project on <br />time. If additional support is needed, our lead Utility/ <br />RR Coordinator, Natalie Parks, PE, is available to assist. <br />Together, they can work with the City of South Bend to <br />make sure any utility obstacles are addressed before they <br />become an issue. USI has no doubt that coordination with <br />Norfolk Southern will be critical in keeping the project <br />on-schedule. <br />City of South Bend… the USI team has your back. <br />We pledge to provide you with a genuinely talented, <br />committed, forthright group of individuals – eager to serve, <br />honored to assist, and fully prepared to work with the <br />City as your very own construction management team. <br />Please take a moment to review this proposal and call any <br />one of us if you have questions regarding our proposed <br />construction services. <br />Sincerely, <br />Philip D. Beer II, PE, PS, FACEC <br />President <br />Scott Dick <br />Project Manager <br />Scott Dicksdick@usiconsultants.com <br />Project Manager <br />Justin Shermanjsherman@usiconsultants.com <br />Project Supervisor <br />Mark Whitten mwhitten@usiconsultants.com <br />Lead Inspector <br />Tracy McCormick, PEtracy@mccormickeng.com <br />McCormick - Inspector <br />City of South Bend <br />USI LAPORTE OFFICE <br />824 Lincolnway <br />LaPorte, IN <br />219.369.6545 <br />MCCORMICK OFFICE <br />234 N. Ironwood Dr. <br />South Bend, IN <br />574.232.6800 <br />Each member of our team has <br />passed all six areas of the Certified <br />Technician Program (CTP). <br />TEAM INFORMATION <br />USI Consultants | 90% <br />13.1 <br />McCormick Engineering | DBE | 10% <br />13.1, Materials Testing
The URL can be used to link to this page
Your browser does not support the video tag.