My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - 1201 Western Ave. Sidewalk Vault Repair Proj No. 120-019 - John Boettcher Sewer & Excavating
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - 1201 Western Ave. Sidewalk Vault Repair Proj No. 120-019 - John Boettcher Sewer & Excavating
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:42:56 AM
Creation date
9/10/2020 9:01:23 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY��U�� ��� ������ ������ �����U��� <br />_. ___~.. ~~~~.-_, ...~_.~~.~.. <br />PROJECT NAME: 1201 Western Ave. Sidewalk Vault Repair <br />PROJECT NO. 120-019 <br />QUOTES DUE _ftg" aplember-a,-20ZO- <br />(MuStbecompleted for all quotes. Please type Qrprint) <br />Date: September 8, 2020Fimn: John Boettcher Sewer & Excavating Contractor <br />Address: 3305 N Home Street <br />City/State/Zip: Mishawaka, IN 46545 Telephone Number: <br />Agent o/Bidder (if App|uube): <br />Pursuant to notices given, the undersigned uffe,o to furnish labor and/or material necessary to complete the <br />public works project of: <br />1201 Western Ave. Sidewalk Vault Repair <br />the City ofSouth Bend. |nd|ono, in accordance with plans and specifications prepared by: <br />_AftM�nt of Public Works <br />and dated September 8 2020 for the sum of (enter the Total Quote as shown on the Proposal) <br />Ninety One Thousand Five Hundred Ninety Four & 04/100 $ 91,594.04 <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits m proposal for each in accordance with the notice, Any <br />addendurns attached will be specifically referenced at the applicable page. <br />|fadditional units ofmaterial included inthe contract are needed, the cost cfunits must bethe same aathat shown <br />in the original contract |faccepted by the City ofSouth Bend. |fthe quote is to be awarded on a unit hasia, the <br />itemization ofthe units shall bashown onoseparate attachment. <br />111 <br />The above quote isaccepted this day of <br />Subject tothe following conditions: <br />BOARD OF PUBLIC WORKS <br />G—a—ry A. Gilot, President <br />Elizabeth A. radik, Member <br />Joseph R.Molnar, Member <br />(Printed Name of Person Signing) <br />Therese J. Dorau, Member <br />Jordan V.Gathers, Member <br />Attest: Linda W1. Martin, Clerk <br />WE <br />Version 2/14/2020 Page - 7 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.