Laserfiche WebLink
<br />CITY OF SOUTH BEND <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: <br />Linda M. Martin, Clerk <br />Board of Public Works <br />THROUGH:Scott Kreeger,Project Engineer <br />FROM:Kara M. Boyles, PE, City Engineer <br />SUBJECT:Self-Performance of 2020City Paving Projects <br />DATE: <br />April 22, 2020 <br />I am presenting the 2020Internal Paving Schedule for work to be self- <br />internal work forces. The attached document provides details on 26 separate paving projects <br />anticipated to be completed by the end of 2020as part of the annual paving program. The <br />document indicates which streets will be milled and paved, estimated material costs, estimated <br />equipment costs, and estimated cost of labor for an overall estimated project cost. The estimated <br />project costs range from approximately $4,000to $116,700. <br />According to IC 36-1-12-3, the City is not required to bid public works projects that it can self- <br />perform if the estimated cost is less than $250,000 including the cost of materials. However, if the <br />cost of a project is greater than $100,000, the Board of Public Works must provide notice of the <br />intent to self- <br />perform this work. Additionally, the City must already have the human resources on staff and <br />capability to perform the work. <br />Two(2) of the 26 projects schedule for 2020paving has an estimated cost of more than $100,000. <br />Angela Boulevard from Lafayette Boulevard to Northshore Driveis estimated to be $113,559.83. <br />Prast Street from Ardmore Trail to Bendix Driveis estimated to be $116,749.00. <br />Materials for these projects have already been acquired under IC 5-22 (public purchasing). <br />workforce to perform the above-mentioned paving project, each estimated to cost more than <br />$100,000, but not exceed $250,000. <br /> <br />