My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C (2)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
09-13-12 Packet
>
6C (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 7:09:32 PM
Creation date
9/10/2012 1:22:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�� C (L) <br />me SpU7H 6 <br />morand u m <br />Comm nity & Economic Development s �':`E'z <br />1865 - <br />1200 County -Cit <br />To: <br />From: <br />Subject: <br />Date: <br />Over the <br />located a <br />the site a <br />managen <br />The origii <br />the projei <br />$10,152 i <br />extensior <br />required <br />would be <br />Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 <br />Redevelopment Commission"- <br />Bill Schallio <br />VA Clinic Project ite — Property development close -out costs <br />September 9, 2012 <br />last several months, staff has been working to close -out the Veterans Center project <br />333 West Western Avenue. There are a variety of items that need to be addressed on <br />id staff is requesting a budget adjustment to the project budget to allow for some property <br />ent and maintenance issues. <br />al project budget for the project as presented to the Commission was for $481,000. As <br />t was closed out with the Board of Public Works, the project ended up with an additional <br />1 expenses related to some drainage repair issues and some walkway /sidewalk <br />that allowed for better site and mobility access. Additionally, some additional work was <br />be done with AEP related to the relocation of a power line through the site. The project <br />able to be closed out with the approval of the $10,512. <br />Additionally, staff is requesting an additional $2,200 for professional design services that were <br />needed to aid in site layout for the construction on the site. Wightman Petrie provided some <br />specializ d survey and design work related to the reconfiguration of the drainage and sidewalk <br />issues. <br />Staff regl <br />sts a total budget amount of $12,712 to close out the VA project. <br />What We Do Today Makes A Difference! <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.