Laserfiche WebLink
Jones Petrie Rafinski, Corp. <br />325 S. Lafayette Blvd. <br />South Bend, IN 46601 <br />CITY OF SOUTH BEND <br />CONTRACTOR BED TABULATION <br />118-075 - MICHIGAN STREET RECONSTRUCTION <br />May 16,2019 <br />Western Avenue to Colfax Avenue <br />ENGINEERS ESTIMATE <br />RIETH-RILEY BID <br />WALSH & KELLY BID <br />No. <br />Description <br />Quantify <br />Unit <br />Unit Price <br />Amount <br />Unit Price <br />Amount <br />Unit Price <br />Amount <br />1 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LS <br />$86,050.00 <br />$86,050.00 <br />$234,306.55 <br />$234,306.55 <br />$161,000.00 <br />$161,000.00 <br />2 <br />MAINTAINING TRAFFIC <br />1 <br />LS <br />$50,000.00 <br />$50,000.00 <br />$50,000.00 <br />$50,000.00 <br />$47,773.61 <br />$47,773.61 <br />3 <br />CONSTRUCTION ENGINEERING <br />1 <br />LS <br />$20,000.00 <br />$20,000.00 <br />$40,000.00 <br />$40,000.00 <br />$43,200.00 <br />$43,200.00 <br />4 <br />CPM SCHEDULE <br />1 <br />LS <br />$4,000.00 <br />$4,000.00 <br />1 $2,000.00 <br />$2,000.00 <br />$12,500.00 <br />$12,500.00 <br />5 <br />CPM SCHEDULE, MONTHLY UPDATE <br />4 <br />EACH <br />$250.00 <br />$1,000.00 <br />$25.00 <br />$100.00 <br />$500.00 <br />$2,000.00 <br />6 <br />VIDEO RECORD <br />1 <br />LS <br />$2,000.00 <br />$2,000.00 <br />$7,500.00 <br />$7,500.00 <br />$1,800.00 <br />$1,800.00 <br />7 <br />CLEARING RIGHT-OF-WAY <br />1 <br />LS <br />$3,000.00 <br />$3,000.00 <br />$5,000.00 <br />$5,000.00 <br />$131,000.00 <br />$131,000.00 <br />8 <br />COMMON EXCAVATION, UNDISTRIBUTED <br />200 <br />CYS <br />$16.00 <br />$3,200.00 <br />$50.00 <br />$10,000.00 <br />$39.00 <br />$7,800.00 <br />9 <br />SURFACE MILLING, ASPHALT, 1 1/2IN+ <br />600 <br />SYS <br />$15.00 <br />$9,000.00 <br />$11.00 <br />$6,600.00 <br />$11.00 <br />$6,600.00 <br />10 <br />PAVEMENT REMOVE <br />7115 <br />SYS <br />$15.00 <br />$106,725.00 <br />$6.90 <br />$49,093.50 <br />$12.00 <br />$85,380.00 <br />11 <br />SIDEWALK, CONCRETE, REMOVE <br />2060 <br />SYS <br />$8.00 <br />$16,480.00 <br />$15.00 <br />$30,900.00 <br />$11.00 <br />$22,660.00 <br />12 <br />CURB RAMP, CONCRETE, REMOVE <br />93 <br />SYS <br />$8.00 <br />$744.00 <br />$47.30 <br />$4,398.90 <br />1 $25.00 <br />$2,325.00 <br />13 <br />CURB & GUTTER, CONCRETE, REMOVE <br />615 <br />LET <br />$5.00 <br />$3,075.00 <br />$13.06 <br />$8,031.90 <br />$12.00 <br />$7,380.00 <br />14 <br />CONCRETE HEADER, REMOVE <br />1235 <br />LET <br />$10.00 <br />$12,350.00 <br />$12.63 <br />$15,598.05 <br />$6.00 <br />$7,410.00 <br />15 <br />PLANTER WALL REMOVAL <br />115 <br />LET <br />$10.00 <br />$1,150.00 <br />$12.00 <br />$1,380.00 <br />$41.00 <br />$4,715.00 <br />16 <br />REMOVE EXIST PAVEMENT STRIPING <br />3580 <br />LET <br />$0.50 <br />$1,790.00 <br />$0.75 <br />$2,685.00 <br />$0.95 <br />$3,401.00 <br />17 <br />TREE REMOVE <br />15 <br />EACH <br />$300.00 <br />$4,500.00 <br />$240.00 <br />$3,600.00 <br />$590.00 <br />$8,850.00 <br />18 <br />TEMPORARY EROSION CONTROL <br />1 <br />LS <br />$2,000.00 <br />$2,000.00 <br />$10,000.00 <br />$10,000.00 <br />$4,200.00 <br />$4,200.00 <br />19 <br />TEMPORARY INLET PROTECTION <br />41 <br />EACH <br />$150.00 <br />$6,150.00 <br />$165.00 <br />$6,765.00 <br />$105.00 <br />$4,305.00 <br />20 <br />TEMPORARY SLOT DRAIN PROTECTION <br />1495 <br />LET <br />$25.00 <br />$37,375.00 <br />$6.50 <br />$9,717.50 <br />$6.10 <br />$9,119.50 <br />21 <br />HANDHOLE, ADJUST TO GRADE <br />46 <br />EACH <br />$600.00 <br />$27,600.00 <br />$150.00 <br />$6,900.00 <br />$350.00 <br />$16,100.00 <br />22 <br />MANHOLE LID REPLACEMENT <br />2 <br />EACH <br />$1,200.00 <br />$2,400.00 <br />$1,800.00 <br />$3,600.00 <br />$1,200.00 <br />$2,400.00 <br />23 <br />STORM CASTING REPLACEMENT <br />2 <br />EACH <br />$1,800.00 <br />$3,600.00 <br />$1,800.00 <br />$3,600.00 <br />$1,200.00 <br />$2,400.00 <br />24 <br />PVC STORM PIPE, 12 IN <br />90 <br />LET <br />$40.00 <br />$3,600.00 <br />$95.00 <br />$8,550.00 <br />$58.00 <br />$5,220.00 <br />25 <br />TRENCH DRAIN, REMOVE AND REPLACE <br />22 <br />LET <br />$150.00 <br />$3,300.00 <br />$350.00 <br />$7,700.00 <br />$514.00 <br />$11,308.00 <br />26 <br />DI WATER MAIN, 6IN <br />31 <br />LET <br />$50.00 <br />$1,550.00 <br />$150.00 <br />$4,650.00 <br />$375.00 <br />$11,625.00 <br />27 <br />REMOVE AND RESET FIRE HYDRANT <br />1 <br />EACH <br />$2,000.00 <br />$2,000.00 <br />$5,000.00 <br />$5,000.00 <br />$5,300.00 <br />$5,300.00 <br />28 <br />PARTIAL DEPTH CONCRETE GUTTER SURFACE <br />REPLACEMENT <br />400 <br />LET <br />$40.00 <br />$16,000.00 <br />$112.00 <br />$44,800.00 <br />$57.00 <br />$22,800.00 <br />29 <br />HMA PATCHING, TYPE B, UNDISTRIBUTED <br />80 <br />TON <br />$75.00 <br />$6,000.00 <br />$225.00 <br />$18,000.00 <br />$175.00 <br />$14,000.00 <br />30 <br />COMPACTED AGGREGATE, NO. 53 <br />2560 <br />TON <br />$30.00 <br />$76,800.00 <br />$28.45 <br />$72,832.00 <br />$26.00 <br />$66,560.00 <br />31 <br />LIMA BASE, TYPE <br />36 <br />TON <br />$60.00 <br />$2,160.00 <br />$210.00 <br />$7,560.00 <br />$138.00 <br />$4,968.00 <br />32 <br />LIMA INTERMEDIATE, TYPE B <br />12 <br />TON <br />$65.00 <br />$780.00 <br />$300.00 <br />$3,600.00 <br />$164.00 <br />$1,968.00 <br />33 <br />LIMA SURFACE, TYPE B <br />52 <br />TON <br />$120.00 <br />$6,240.00 <br />$250.00 <br />$13,000.00 <br />$171.00 <br />$8,892.00 <br />34 <br />PCCP FOR APPROACHES, 9 IN REINFORCED, <br />HIGH -EARLY <br />68 <br />SYS <br />$105.00 <br />$7,140.00 <br />$230.00 <br />$15,640.00 <br />$119.00 <br />$8,092.00 <br />35 <br />PCCP, REINFORCED, PLAIN, 10 IN <br />6150 <br />SYS <br />$80.00 <br />$492,000.00 <br />$78.00 <br />$479,700.00 <br />$69.00 <br />$424,350.00 <br />36 <br />PCCP, REINFORCED, HIGH -EARLY, 10 IN <br />215 <br />SYS <br />$105.00 <br />$22,575.00 <br />$110.00 <br />$23,650.00 <br />$92.60 <br />$19,909.00 <br />37 <br />PCCP, REINFORCED, COLORED, 10 IN <br />850 <br />SYS <br />$90.00 <br />$76,500.00 <br />$107.00 <br />$90,950.00 <br />$118.50 <br />$100,725.00 <br />38 <br />CURB & GUTTER, CONCRETE <br />605 <br />LET <br />$28.00 <br />$16,940.00 <br />$100.00 <br />$60,500.00 <br />$54.00 <br />$32,670.00 <br />39 <br />SIDEWALK, CONCRETE, S IN <br />1865 <br />SYS <br />$55.00 <br />$102,575.00 <br />$58.00 <br />$108,170.00 <br />$47.00 <br />$87,655.00 <br />40 <br />PCCP, HEADER, 10 IN <br />1135 <br />LET <br />$75.00 <br />$85,125.00 <br />$48.00 <br />$54,480.00 <br />$28.00 <br />$31,780.00 <br />41 <br />CURB RAMP, CONCRETE <br />128 <br />SYS <br />$110.00 <br />$14,080.00 <br />$200.00 <br />$25,600.00 <br />$154.00 <br />$19,712.00 <br />42 <br />SIDEWALK JOINTS, CLEAN & RESEAL <br />1 <br />LS <br />$2,500.00 <br />$2,500.00 <br />$5,565.00 <br />$5,565.00 <br />$6,400.00 <br />1 $6,400.00 <br />43 <br />THERMOPLASTIC STOP LINE, WHITE, 24IN. <br />215 <br />LET <br />$6.00 <br />$1,290.00 <br />$5.95 <br />$1,279.25 <br />$6.50 <br />$1,397.50 <br />44 <br />THERMOPLASTIC LINE, SOLID, WHITE, 4IN. <br />280 <br />LET <br />$1.50 <br />$420.00 <br />$2.25 <br />$630.00 <br />$1.19 <br />$333.20 <br />45 <br />THERMOPLASTIC LINE, SOLID, YELLOW, 4IN. <br />256 <br />LET <br />$1.50 <br />$3SLO <br />$2.25 <br />$576.00 <br />$1.19 <br />$304.64 <br />46 <br />PAVEMENT MESSAGE MARKING, THERMOPLASTIC <br />4 <br />1 EACH <br />$200.00 <br />$800.00 <br />$120.00 <br />$480.00 <br />1 $225.00 <br />$900.00 <br />H:\2018 Projects\2018-0337\Cost Estimate\2019-05-16 Bid Tab.I tion\118-075_2019-05-16_Bid Tabulation..h. <br />