Laserfiche WebLink
m <br />Project Name: IMain & Doffalt Parking Structure Repairs 2019 <br />Project Number: 115-143a <br />Date: December 11„ 2018 <br />RAM Construction Services <br />D.C. Byers Co./ Detroit, Inc. of MI <br />Work Estimated <br />am No Work Item Unit Quantity I Unit Price Bid Price I Unit Price Bid Price <br />la <br />Contractor Mobilization <br />LS <br />1 <br />N/A <br />$ 30,000.00 <br />N/A <br />$ 96,500,00 <br />2a <br />Contractor General Requirements <br />LS <br />1 <br />N/A <br />$ 6,000,00 <br />N/A <br />$ 96,500,00 <br />3a <br />Slab -on -Grade Repair <br />SF <br />300 <br />$ <br />30.00 <br />$ 9.000,00 <br />'... $ <br />26,00 <br />$ 7,800,00 <br />4a <br />Floor Spall Repair <br />SF <br />400 <br />$ <br />40,00 <br />$ 16,000,00 <br />$ <br />34..00 <br />$ 13,600..00 <br />5a <br />Full Depth Slab Repair <br />SF <br />2,600 <br />$ <br />90,00 <br />$ 234,000,00 <br />$ <br />71.00 <br />$ 184,600.00 <br />6a <br />Ceiling Repair <br />SF <br />'.. 2,200 <br />$ <br />60,00 <br />$ 132,000,00 <br />$ <br />7200. <br />$ 158,400,00 <br />7a <br />Wall Repair <br />SF <br />200 <br />$ <br />50.00 <br />$ 10,000,00 <br />$ <br />79.00 <br />$ 15,800,00 <br />Be <br />Exterior Wall Repair <br />SF <br />100 <br />$ <br />100.00 <br />$ 10,000„00 <br />$ <br />122.00 <br />$ 12,200,00 <br />9a <br />Beam Repair <br />SF <br />80 <br />$ <br />300,00 <br />$ 24.000,00 <br />$ <br />94,00 <br />$ 7,52000 <br />10a <br />Curb Repair <br />SF <br />50 <br />$ <br />60,00 <br />$ 3,000.00 <br />$ <br />48.00 <br />$ 2,400,00 <br />11a <br />Stair Tread Repair <br />SF <br />200 <br />$ <br />90,00 <br />$ 18,000,00 <br />$' <br />90,00 <br />: $ 18,000.00 <br />12a <br />Stair Landing Repair <br />LF <br />100 <br />$ <br />50,00 <br />$ 5,000,00 <br />S <br />42,00 <br />'... $ 4,200,00 <br />13a <br />Stair Ceiling Repair <br />SF <br />50 <br />$ <br />200.00 <br />$ 10,000.:00 <br />$ <br />94.,00 <br />$ 4,70000 <br />14a <br />Temperature PostTensioning Repair - Type 1 <br />EA <br />10 <br />$ <br />1,100,00 <br />$ 11,000.00 <br />$ <br />2,448.00 <br />$ 24,480.00 <br />15a <br />Temperature PostTensioning Repair - Type 2 <br />EA <br />10 <br />$ <br />1,100.,00 <br />$ 11,000,00 <br />$ <br />2,000,00 <br />$ 20,000,00 <br />16a <br />Remove & Replace Control Joint Sealants <br />LF <br />350 <br />$ <br />6,00 <br />$ 2,100,00 <br />$ <br />5.00 <br />$ 1.750,00 <br />17a <br />Remove and Replace Cove Joint Sealant <br />LF <br />700 <br />$ <br />6,00 <br />$ 4.200.,00 <br />$ <br />5..00 <br />: $ 3,500..00 <br />18a <br />Coating @ Exterior Walls <br />SF <br />200 <br />$ <br />20.,00 <br />$ 4,000,00 <br />$ <br />8.40 <br />$ 1,680.00 <br />19a <br />Repair Storm Drain System <br />Allowance <br />1 <br />N/A <br />$ 3.000.00 <br />N/A <br />$ 3,000.00 <br />20a <br />''..Clean & Flush Floor Drain System <br />LS <br />1 <br />N/A <br />$ 100,000,00 <br />N/A <br />$ 6,500,00 <br />21a <br />'.Install Dehumidifier <br />EA <br />2 <br />$ <br />6,000.00 <br />$ 12,000.00 <br />$ <br />4.600.00 <br />$ 9,200.00 <br />'Base Bid Part 1 Total <br />I <br />I <br />$ 654,300..00 <br />$ 692,330,00 <br />1b <br />Contractor Mobilization <br />LS <br />1 <br />'.N/A <br />$ 20,000.,00 <br />N/A <br />$ 10,000.,00 <br />21b <br />Contractor General Requirements <br />LS <br />1 <br />N/A <br />$ 7,000..00 <br />N/A <br />$ 10,000..00 <br />31b <br />Center Curb, Concrete Remove <br />SYS <br />27 <br />':. $ <br />200,00 <br />$ 5,40000 <br />S <br />146,00 <br />$ 3,942,00 <br />4b <br />Sidewalk Concrete, Remove <br />SYS <br />9 <br />$ <br />300,00 <br />$ 2,700.00 <br />$ <br />126,00 <br />$ 1,134.00 <br />5b <br />Trench Drain, Remove <br />LF <br />31 <br />'... $ <br />5000 <br />$ 1,550,.00 <br />$ <br />164,00 <br />$ 5.084,00 <br />6b <br />Smooth Surface at Sidewalk Removal <br />SYS <br />25 <br />$ <br />200.00 <br />$ 5,000.00 <br />$ <br />145.00 <br />$ 3.625.00 <br />7b <br />Sidewalk Concrete <br />'.. SYS <br />9 <br />'... $ <br />300.00 <br />$ 2,700.00 <br />$ <br />201.00 <br />$ 1,809,.00 <br />8b <br />Curb Island, Concrete 6 Inch <br />SYS <br />24 <br />$ <br />300,00 <br />$ 7,200.00 <br />$ <br />299,00 <br />$ 7,176.00 <br />91b <br />Clean and Paint <br />LS <br />1 <br />$ <br />7,000,00 <br />$ 7,000,00 <br />N/A <br />$ 3.623.00 <br />10b <br />Pipe, Storm, Circular, 8 Inch <br />LF <br />5 <br />$ <br />100,00 <br />$ 500.,00 <br />$ <br />4.200,00 <br />$ 21,000,00 <br />11b <br />Trench Drain, Retrofit <br />LF <br />37 <br />$ <br />100..00 <br />$ 3,700.00 <br />$ <br />76500 <br />$ 28.305..00 <br />12b <br />Inlet, Type R with Casting <br />EA <br />1 <br />$ <br />200.00 <br />$ 20000 <br />$ <br />3,400.00 <br />$ 3,400,00 <br />13b <br />Bollard, Relocate <br />EA <br />12 <br />$ <br />200,00 <br />$ 2,400.00 <br />$ <br />626,00 <br />$ 7,512.00 <br />14b <br />Sign, Sheet, Remove <br />EA <br />24 <br />$ <br />100,00 <br />$ 2,400.00 <br />$ <br />136„00 <br />$ 3,264,00 <br />151b <br />Sign, Sheet, Relocate <br />EA <br />83 <br />$ <br />200.00 <br />$ 16,600,00 <br />$ <br />253.00 <br />$ 20.999-00 <br />16b <br />Sign, Sheet, with Legend, 0.080 Inch <br />SF <br />36 <br />$ <br />100.00 <br />$ 3,600,00 <br />$ <br />323.00 <br />$ 11,628.00 <br />17b <br />Parking Exit Equipment, Remove & Salvage <br />EA <br />1 <br />$ <br />5,000.00 <br />$ 5.000,00 <br />$ <br />11,200.00 <br />$ 11.200,.00 <br />181b <br />,Parking Exit Equipment, Relocate <br />EA <br />1 <br />$ <br />15.000.,00 <br />$ 15,000,00 <br />$ <br />11,625,00 <br />$ 11,625,00 <br />19b <br />'..Parking Entry Equipment, Relocate <br />EA <br />1 <br />$ <br />15,000,.00 <br />$ 15,000..00 <br />$ <br />11,625.00 <br />$ 11.625.00 <br />20b <br />'Illuminated Sign <br />EA <br />4 <br />$ <br />2,000.00 <br />$ 8.000.:00 <br />$ <br />7.100..00 <br />$ 28.400,00 <br />21b <br />Pavement Message Marking, Remove <br />SYS <br />29 <br />$ <br />100,00 <br />$ 2,900,00 <br />$ <br />62.00 <br />$ 1,798.00 <br />22b <br />Line, Paint, Yellow, 8 Inch <br />LF <br />180 <br />$ <br />2,.00 <br />$ 360.00 <br />$ <br />5.45 <br />$ 981,00 <br />23b <br />Line, Paint, Yellow, 4 Inch <br />LF <br />21,320 <br />$ <br />0,.50 <br />'... $ 10,660,00 <br />$ <br />0.30 <br />$ 6,396,00 <br />241b <br />Line, Remove <br />LF <br />21.500 <br />$ <br />2.00 <br />'... $ 43.000..00 <br />$ <br />0.60 <br />$ 12.900.00 <br />25b <br />Pavement Marking, Paint, Handicap Symbol <br />EA <br />8 <br />$ <br />100,00 <br />'... $ 800,00 <br />$ <br />293.00 <br />$ 2,344,00 <br />261b <br />Bollard <br />EA <br />2 <br />$ <br />700,00 <br />$ 1„400.00 <br />$ <br />939.00 <br />$ 1,878.00 <br />Base Bid Part 2 Total <br />$ 190,070.00 <br />$ 231,648,00 <br />Base Bid <br />Totals <br />$844 <br />370.00 <br />$923,97800 <br />Altemates <br />No 1 <br />Remove & Replace Doors and Frames <br />L,S <br />1 <br />N/A <br />$ 6.000.00 <br />N/A <br />$ 10,300,,00 <br />No, 2 <br />Install Electric Heaters <br />EA <br />4 <br />$ 4,000.00 <br />$ 16,000,00 <br />$ 4.800.00 <br />$ 19,200.00 <br />No. 3 <br />Remove Ceiling Coating <br />SF <br />'': 100,000 <br />$ 300 <br />$ 300,00000 <br />$ 1.68 <br />$ 168,000,,00 <br />No, 4 <br />Prep & Paint Ceiling Over Existing Coating <br />SF <br />100,000 <br />$ 2.00 <br />$ 200,000,00 <br />$ 2..08 <br />$ 208,000,.00 <br />No.. 5 <br />Top of Slab Repair- Partial <br />SF <br />500 <br />$ 40,00 <br />$ 20,000..00 <br />$ 34,00 <br />'$ 17,000,00 <br />No, 6 <br />Top of Slab Repair - Full Depth <br />SF <br />500 <br />$ 90,00 <br />$ 45,000,00 <br />$ 71,,00 <br />$ 35,500.00 <br />Alternates Total <br />I <br />I$ <br />5B7,000.00 <br />$ 458.0 00,.00 <br />ase t eCr1a a Ci , .. �._. <br />Note: D.C.. Byers Co,/Detroit Inc., corrected Base Bid Part 1 Total to $654,300,00, Base Bid Totals to $844.370,00 and Base Bid + Alternates to <br />$1,341,370..00 by Roger T,. Nawrot, City of South Bend Assistant City Engineer <br />I hereby comil.I the bids are correct as shown: <br />Rogeramot, PE & PLS <br />City of South Bend Assistant City Engineer <br />December 17, 2018 <br />