<br />Project Name: IMain & Doffalt Parking Structure Repairs 2019
<br />Project Number: 115-143a
<br />Date: December 11„ 2018
<br />RAM Construction Services
<br />D.C. Byers Co./ Detroit, Inc. of MI
<br />Work Estimated
<br />am No Work Item Unit Quantity I Unit Price Bid Price I Unit Price Bid Price
<br />la
<br />Contractor Mobilization
<br />LS
<br />1
<br />N/A
<br />$ 30,000.00
<br />N/A
<br />$ 96,500,00
<br />2a
<br />Contractor General Requirements
<br />LS
<br />1
<br />N/A
<br />$ 6,000,00
<br />N/A
<br />$ 96,500,00
<br />3a
<br />Slab -on -Grade Repair
<br />SF
<br />300
<br />$
<br />30.00
<br />$ 9.000,00
<br />'... $
<br />26,00
<br />$ 7,800,00
<br />4a
<br />Floor Spall Repair
<br />SF
<br />400
<br />$
<br />40,00
<br />$ 16,000,00
<br />$
<br />34..00
<br />$ 13,600..00
<br />5a
<br />Full Depth Slab Repair
<br />SF
<br />2,600
<br />$
<br />90,00
<br />$ 234,000,00
<br />$
<br />71.00
<br />$ 184,600.00
<br />6a
<br />Ceiling Repair
<br />SF
<br />'.. 2,200
<br />$
<br />60,00
<br />$ 132,000,00
<br />$
<br />7200.
<br />$ 158,400,00
<br />7a
<br />Wall Repair
<br />SF
<br />200
<br />$
<br />50.00
<br />$ 10,000,00
<br />$
<br />79.00
<br />$ 15,800,00
<br />Be
<br />Exterior Wall Repair
<br />SF
<br />100
<br />$
<br />100.00
<br />$ 10,000„00
<br />$
<br />122.00
<br />$ 12,200,00
<br />9a
<br />Beam Repair
<br />SF
<br />80
<br />$
<br />300,00
<br />$ 24.000,00
<br />$
<br />94,00
<br />$ 7,52000
<br />10a
<br />Curb Repair
<br />SF
<br />50
<br />$
<br />60,00
<br />$ 3,000.00
<br />$
<br />48.00
<br />$ 2,400,00
<br />11a
<br />Stair Tread Repair
<br />SF
<br />200
<br />$
<br />90,00
<br />$ 18,000,00
<br />$'
<br />90,00
<br />: $ 18,000.00
<br />12a
<br />Stair Landing Repair
<br />LF
<br />100
<br />$
<br />50,00
<br />$ 5,000,00
<br />S
<br />42,00
<br />'... $ 4,200,00
<br />13a
<br />Stair Ceiling Repair
<br />SF
<br />50
<br />$
<br />200.00
<br />$ 10,000.:00
<br />$
<br />94.,00
<br />$ 4,70000
<br />14a
<br />Temperature PostTensioning Repair - Type 1
<br />EA
<br />10
<br />$
<br />1,100,00
<br />$ 11,000.00
<br />$
<br />2,448.00
<br />$ 24,480.00
<br />15a
<br />Temperature PostTensioning Repair - Type 2
<br />EA
<br />10
<br />$
<br />1,100.,00
<br />$ 11,000,00
<br />$
<br />2,000,00
<br />$ 20,000,00
<br />16a
<br />Remove & Replace Control Joint Sealants
<br />LF
<br />350
<br />$
<br />6,00
<br />$ 2,100,00
<br />$
<br />5.00
<br />$ 1.750,00
<br />17a
<br />Remove and Replace Cove Joint Sealant
<br />LF
<br />700
<br />$
<br />6,00
<br />$ 4.200.,00
<br />$
<br />5..00
<br />: $ 3,500..00
<br />18a
<br />Coating @ Exterior Walls
<br />SF
<br />200
<br />$
<br />20.,00
<br />$ 4,000,00
<br />$
<br />8.40
<br />$ 1,680.00
<br />19a
<br />Repair Storm Drain System
<br />Allowance
<br />1
<br />N/A
<br />$ 3.000.00
<br />N/A
<br />$ 3,000.00
<br />20a
<br />''..Clean & Flush Floor Drain System
<br />LS
<br />1
<br />N/A
<br />$ 100,000,00
<br />N/A
<br />$ 6,500,00
<br />21a
<br />'.Install Dehumidifier
<br />EA
<br />2
<br />$
<br />6,000.00
<br />$ 12,000.00
<br />$
<br />4.600.00
<br />$ 9,200.00
<br />'Base Bid Part 1 Total
<br />I
<br />I
<br />$ 654,300..00
<br />$ 692,330,00
<br />1b
<br />Contractor Mobilization
<br />LS
<br />1
<br />'.N/A
<br />$ 20,000.,00
<br />N/A
<br />$ 10,000.,00
<br />21b
<br />Contractor General Requirements
<br />LS
<br />1
<br />N/A
<br />$ 7,000..00
<br />N/A
<br />$ 10,000..00
<br />31b
<br />Center Curb, Concrete Remove
<br />SYS
<br />27
<br />':. $
<br />200,00
<br />$ 5,40000
<br />S
<br />146,00
<br />$ 3,942,00
<br />4b
<br />Sidewalk Concrete, Remove
<br />SYS
<br />9
<br />$
<br />300,00
<br />$ 2,700.00
<br />$
<br />126,00
<br />$ 1,134.00
<br />5b
<br />Trench Drain, Remove
<br />LF
<br />31
<br />'... $
<br />5000
<br />$ 1,550,.00
<br />$
<br />164,00
<br />$ 5.084,00
<br />6b
<br />Smooth Surface at Sidewalk Removal
<br />SYS
<br />25
<br />$
<br />200.00
<br />$ 5,000.00
<br />$
<br />145.00
<br />$ 3.625.00
<br />7b
<br />Sidewalk Concrete
<br />'.. SYS
<br />9
<br />'... $
<br />300.00
<br />$ 2,700.00
<br />$
<br />201.00
<br />$ 1,809,.00
<br />8b
<br />Curb Island, Concrete 6 Inch
<br />SYS
<br />24
<br />$
<br />300,00
<br />$ 7,200.00
<br />$
<br />299,00
<br />$ 7,176.00
<br />91b
<br />Clean and Paint
<br />LS
<br />1
<br />$
<br />7,000,00
<br />$ 7,000,00
<br />N/A
<br />$ 3.623.00
<br />10b
<br />Pipe, Storm, Circular, 8 Inch
<br />LF
<br />5
<br />$
<br />100,00
<br />$ 500.,00
<br />$
<br />4.200,00
<br />$ 21,000,00
<br />11b
<br />Trench Drain, Retrofit
<br />LF
<br />37
<br />$
<br />100..00
<br />$ 3,700.00
<br />$
<br />76500
<br />$ 28.305..00
<br />12b
<br />Inlet, Type R with Casting
<br />EA
<br />1
<br />$
<br />200.00
<br />$ 20000
<br />$
<br />3,400.00
<br />$ 3,400,00
<br />13b
<br />Bollard, Relocate
<br />EA
<br />12
<br />$
<br />200,00
<br />$ 2,400.00
<br />$
<br />626,00
<br />$ 7,512.00
<br />14b
<br />Sign, Sheet, Remove
<br />EA
<br />24
<br />$
<br />100,00
<br />$ 2,400.00
<br />$
<br />136„00
<br />$ 3,264,00
<br />151b
<br />Sign, Sheet, Relocate
<br />EA
<br />83
<br />$
<br />200.00
<br />$ 16,600,00
<br />$
<br />253.00
<br />$ 20.999-00
<br />16b
<br />Sign, Sheet, with Legend, 0.080 Inch
<br />SF
<br />36
<br />$
<br />100.00
<br />$ 3,600,00
<br />$
<br />323.00
<br />$ 11,628.00
<br />17b
<br />Parking Exit Equipment, Remove & Salvage
<br />EA
<br />1
<br />$
<br />5,000.00
<br />$ 5.000,00
<br />$
<br />11,200.00
<br />$ 11.200,.00
<br />181b
<br />,Parking Exit Equipment, Relocate
<br />EA
<br />1
<br />$
<br />15.000.,00
<br />$ 15,000,00
<br />$
<br />11,625,00
<br />$ 11,625,00
<br />19b
<br />'..Parking Entry Equipment, Relocate
<br />EA
<br />1
<br />$
<br />15,000,.00
<br />$ 15,000..00
<br />$
<br />11,625.00
<br />$ 11.625.00
<br />20b
<br />'Illuminated Sign
<br />EA
<br />4
<br />$
<br />2,000.00
<br />$ 8.000.:00
<br />$
<br />7.100..00
<br />$ 28.400,00
<br />21b
<br />Pavement Message Marking, Remove
<br />SYS
<br />29
<br />$
<br />100,00
<br />$ 2,900,00
<br />$
<br />62.00
<br />$ 1,798.00
<br />22b
<br />Line, Paint, Yellow, 8 Inch
<br />LF
<br />180
<br />$
<br />2,.00
<br />$ 360.00
<br />$
<br />5.45
<br />$ 981,00
<br />23b
<br />Line, Paint, Yellow, 4 Inch
<br />LF
<br />21,320
<br />$
<br />0,.50
<br />'... $ 10,660,00
<br />$
<br />0.30
<br />$ 6,396,00
<br />241b
<br />Line, Remove
<br />LF
<br />21.500
<br />$
<br />2.00
<br />'... $ 43.000..00
<br />$
<br />0.60
<br />$ 12.900.00
<br />25b
<br />Pavement Marking, Paint, Handicap Symbol
<br />EA
<br />8
<br />$
<br />100,00
<br />'... $ 800,00
<br />$
<br />293.00
<br />$ 2,344,00
<br />261b
<br />Bollard
<br />EA
<br />2
<br />$
<br />700,00
<br />$ 1„400.00
<br />$
<br />939.00
<br />$ 1,878.00
<br />Base Bid Part 2 Total
<br />$ 190,070.00
<br />$ 231,648,00
<br />Base Bid
<br />Totals
<br />$844
<br />370.00
<br />$923,97800
<br />Altemates
<br />No 1
<br />Remove & Replace Doors and Frames
<br />L,S
<br />1
<br />N/A
<br />$ 6.000.00
<br />N/A
<br />$ 10,300,,00
<br />No, 2
<br />Install Electric Heaters
<br />EA
<br />4
<br />$ 4,000.00
<br />$ 16,000,00
<br />$ 4.800.00
<br />$ 19,200.00
<br />No. 3
<br />Remove Ceiling Coating
<br />SF
<br />'': 100,000
<br />$ 300
<br />$ 300,00000
<br />$ 1.68
<br />$ 168,000,,00
<br />No, 4
<br />Prep & Paint Ceiling Over Existing Coating
<br />SF
<br />100,000
<br />$ 2.00
<br />$ 200,000,00
<br />$ 2..08
<br />$ 208,000,.00
<br />No.. 5
<br />Top of Slab Repair- Partial
<br />SF
<br />500
<br />$ 40,00
<br />$ 20,000..00
<br />$ 34,00
<br />'$ 17,000,00
<br />No, 6
<br />Top of Slab Repair - Full Depth
<br />SF
<br />500
<br />$ 90,00
<br />$ 45,000,00
<br />$ 71,,00
<br />$ 35,500.00
<br />Alternates Total
<br />I
<br />I$
<br />5B7,000.00
<br />$ 458.0 00,.00
<br />ase t eCr1a a Ci , .. �._.
<br />Note: D.C.. Byers Co,/Detroit Inc., corrected Base Bid Part 1 Total to $654,300,00, Base Bid Totals to $844.370,00 and Base Bid + Alternates to
<br />$1,341,370..00 by Roger T,. Nawrot, City of South Bend Assistant City Engineer
<br />I hereby comil.I the bids are correct as shown:
<br />Rogeramot, PE & PLS
<br />City of South Bend Assistant City Engineer
<br />December 17, 2018