Laserfiche WebLink
BIDTABUTATION <br />SBFO Classroom Building <br />1,.jeR No: 11]-12] <br />For Bids Due: November 27, 2018 <br />CUst Estimate from <br />Brown a Brown General <br />Use Did <br />EpoCH Architecture a Planning <br />Contractors,lnr. <br />2lolkowski Cansttucr.ii, Inc. <br />The Robert Henry Corporation <br />Item NO. <br />Description YY _ <br />Total Amount <br />Total Amount <br />TO[al Amount <br />Total Amount <br />BASE BID covers construction fthe Classroom Addition a nd two vehicle -,—A bay <br />1 <br />according to the l ntent of the Plansand Specifications <br />$595,S14.W <br />$579,S78,W <br />$]6],6]O.W <br />5810,683.Ed <br />Base Bid Total <br />$595,51A.W <br />$S]9,SJ8.00 <br />$767,61 <br />$810,6B3.00 <br />Item W. <br />_ <br />Description <br />Total Amount <br />Total Amount <br />Thal Attie— <br />Total Amount <br />1 <br />Provitle costs for removal of existing none and installation of curt in area designated on Site <br />Demolition Plan theSite Grading/Utility Plan. <br />$2,990.00 <br />$8,185.00 <br />$7,000.00 <br />... <br />$4,319.00 <br />Alternate#1 Total <br />$2,990.00 <br />$8,181 <br />$J,OW.W <br />$3,319.W <br />.1. 112 foam <br />Item No. <br />Description <br />TotalAmount <br />TotalAmaunt <br />TDtal Amount <br />Total Amount <br />—Did. metal roof panels in Eeu of asphalt shingles. <br />_ <br />Include addition of 30# synthetic roohng underlayment and Y." exterior roofing <br />shear hirvg, in lieu of sheathing and underlayment shown. <br />2 <br />Include snow guard rails at all roofoverhangs. <br />$191000 <br />$32,609,W <br />$45,80000 <br />$a6,—ee <br />Alternate#2 Total. <br />- <br />$15,WD.W <br />$45,483.W <br />Item No. <br />Deunption <br />To[al lUnOUM <br />TotelAmOunt <br />Total AmOYnt <br />TMBIAmOUM <br />Provide ground face CMU wainscot and cast stone sill shown, base bid to inclutle metal rsnel <br />3 <br />edging and associated furring andtrimstothe base&the wall. <br />— _. <br />$2,9W <br />$13,135.W <br />$18,685.W <br />$6242, 00 <br />Alternate #3 Total <br />$13,135.W <br />;18,68s.0D <br />- <br />;s,z9z.W <br />Alt. ed FADDY <br />ttem No. <br />orxcriptinn _ <br />Total Amount <br />TotalAmouM <br />Total AmOUM <br />T1t1IAdO <br />Provide movable partition between Classroom A and B.. <br />"- <br />4 <br />Includez 1beam, wBu and footingsshown a long with the framing fthe opening <br />for the partition track. Soffit between classrooms to be gar, of the base bid. <br />$14,000 <br />$3],]50.00 <br />$36,42R.00 <br />33D <br />Alternate #4 Total <br />$19,OW.W <br />$3],]SO.W <br />$36,400.00 <br />— <br />$33,916.W <br />AB. A5 dams) <br />Item No. <br />_ Description <br />Thal mount A <br />Total AmOYOY <br />TOW_I_AmOun[ <br />Total AmounC <br />5 <br />Pro . lO floor Oudet boxes and associa tl conduit, devicesand wiring. <br />to <br />__ <br />mm <br />$3,89tl.he <br />Alternate #5 Total <br />$u,WD.Do <br />$8.291 <br />$3,325.OD <br />$3,894.W <br />Item No. <br />_ Oessriptlon <br />Total Amount <br />Total Amount <br />TotalAmo_unt <br />TotalAmount <br />Provide Classroom wo ca rk,(tall storage csbinets. base cabIhd. and counter tops along with <br />_ <br />6 <br />miscellaneous fillers and tnm. <br />$4,050 <br />$3,963.OD <br />$6,]5000 <br />$8],0]5.00 <br />Alternate #6 Total <br />$a,asa.W <br />$31963.W <br />$6,750.00 <br />$87,075.00 <br />Item A. <br />DescnipI <br />Total Amount <br />Total Amoont <br />Total Amount <br />Total Amount <br />Provide AV Projectors and sound system and Telecommunication head end and cabling in <br />] <br />Classrooms Aand B. <br />$36,]]5.00 <br />5gl,g9p,00 <br />$yl ggq,p0 <br />Alternate #7 Total <br />$aB,W0.a0 <br />_ <br />$36,nsm <br />$41,a8D.00 <br />$3;BW.W <br />Item No. <br />Descrption <br />TMei Amount <br />TOCaI Amount <br />Total Amount <br />Total Amount <br />Provide proximity card readers at four (4) exterior doors antl associated security system, <br />g _ <br />keYPad and wirin6' _ <br />$8,3W <br />$16,911.W _ <br />¢I.,fiSfe.Od <br />$9g3.W <br />Alternate #8 Total <br />$8,3W.W <br />$36,911.W <br />µ53,690.W <br />$9#3.W <br />Item NO. <br />Description <br />Total Amount <br />Total Amount <br />TO[al Amouni <br />Total gmatn[ <br />Provide arou C.1 panels attached he the gypsum board ceiling as shown on the drawings. <br />__ <br />9 <br />_ <br />_ $3,500 <br />$SO,IOIAO <br />511,2bd.PJq <br />35,650.00 <br />Alternate #9 Total' <br />$3,500.00 <br />$10,101.00 <br />$12,201 <br />$5,650.W <br />'Total Amount (Base Bid &Alt. 1, 2, 3, 4, 5, 5, 7, 8 8a 9) 5na,zsa.W I <br />_ ;]a],3D6.W $9a1,aW.W $S,o30,Ws.Do <br />edg ement of RWIPI ed Atldendum t <br />N/A <br />Yesuslon <br />ARatlavi[N/A <br />ff <br />Ves <br />Yes <br />N/A <br />Yes <br />Yes <br />Yes <br />ble Bidder Qualification <br />NIA <br />Pm -Qualified <br />Pre-Q-1iied <br />Pre -qualified <br />I hereby certify that the <br />move B,Iy antl separately Ndembems bid, received for IN, project on November 27, 2018Atli- <br />Alicia Caameckl, Project Engineer <br />ser rea.izaszclassroom 11i1111—CiDINDIN—M AND awaanurv-,vserD cun,eem A,A e,eras <br />