BIDTABUTATION
<br />SBFO Classroom Building
<br />1,.jeR No: 11]-12]
<br />For Bids Due: November 27, 2018
<br />CUst Estimate from
<br />Brown a Brown General
<br />Use Did
<br />EpoCH Architecture a Planning
<br />Contractors,lnr.
<br />2lolkowski Cansttucr.ii, Inc.
<br />The Robert Henry Corporation
<br />Item NO.
<br />Description YY _
<br />Total Amount
<br />Total Amount
<br />TO[al Amount
<br />Total Amount
<br />BASE BID covers construction fthe Classroom Addition a nd two vehicle -,—A bay
<br />1
<br />according to the l ntent of the Plansand Specifications
<br />$595,S14.W
<br />$579,S78,W
<br />$]6],6]O.W
<br />5810,683.Ed
<br />Base Bid Total
<br />$595,51A.W
<br />$S]9,SJ8.00
<br />$767,61
<br />$810,6B3.00
<br />Item W.
<br />_
<br />Description
<br />Total Amount
<br />Total Amount
<br />Thal Attie—
<br />Total Amount
<br />1
<br />Provitle costs for removal of existing none and installation of curt in area designated on Site
<br />Demolition Plan theSite Grading/Utility Plan.
<br />$2,990.00
<br />$8,185.00
<br />$7,000.00
<br />...
<br />$4,319.00
<br />Alternate#1 Total
<br />$2,990.00
<br />$8,181
<br />$J,OW.W
<br />$3,319.W
<br />.1. 112 foam
<br />Item No.
<br />Description
<br />TotalAmount
<br />TotalAmaunt
<br />TDtal Amount
<br />Total Amount
<br />—Did. metal roof panels in Eeu of asphalt shingles.
<br />_
<br />Include addition of 30# synthetic roohng underlayment and Y." exterior roofing
<br />shear hirvg, in lieu of sheathing and underlayment shown.
<br />2
<br />Include snow guard rails at all roofoverhangs.
<br />$191000
<br />$32,609,W
<br />$45,80000
<br />$a6,—ee
<br />Alternate#2 Total.
<br />-
<br />$15,WD.W
<br />$45,483.W
<br />Item No.
<br />Deunption
<br />To[al lUnOUM
<br />TotelAmOunt
<br />Total AmOYnt
<br />TMBIAmOUM
<br />Provide ground face CMU wainscot and cast stone sill shown, base bid to inclutle metal rsnel
<br />3
<br />edging and associated furring andtrimstothe base&the wall.
<br />— _.
<br />$2,9W
<br />$13,135.W
<br />$18,685.W
<br />$6242, 00
<br />Alternate #3 Total
<br />$13,135.W
<br />;18,68s.0D
<br />-
<br />;s,z9z.W
<br />Alt. ed FADDY
<br />ttem No.
<br />orxcriptinn _
<br />Total Amount
<br />TotalAmouM
<br />Total AmOUM
<br />T1t1IAdO
<br />Provide movable partition between Classroom A and B..
<br />"-
<br />4
<br />Includez 1beam, wBu and footingsshown a long with the framing fthe opening
<br />for the partition track. Soffit between classrooms to be gar, of the base bid.
<br />$14,000
<br />$3],]50.00
<br />$36,42R.00
<br />33D
<br />Alternate #4 Total
<br />$19,OW.W
<br />$3],]SO.W
<br />$36,400.00
<br />—
<br />$33,916.W
<br />AB. A5 dams)
<br />Item No.
<br />_ Description
<br />Thal mount A
<br />Total AmOYOY
<br />TOW_I_AmOun[
<br />Total AmounC
<br />5
<br />Pro . lO floor Oudet boxes and associa tl conduit, devicesand wiring.
<br />to
<br />__
<br />mm
<br />$3,89tl.he
<br />Alternate #5 Total
<br />$u,WD.Do
<br />$8.291
<br />$3,325.OD
<br />$3,894.W
<br />Item No.
<br />_ Oessriptlon
<br />Total Amount
<br />Total Amount
<br />TotalAmo_unt
<br />TotalAmount
<br />Provide Classroom wo ca rk,(tall storage csbinets. base cabIhd. and counter tops along with
<br />_
<br />6
<br />miscellaneous fillers and tnm.
<br />$4,050
<br />$3,963.OD
<br />$6,]5000
<br />$8],0]5.00
<br />Alternate #6 Total
<br />$a,asa.W
<br />$31963.W
<br />$6,750.00
<br />$87,075.00
<br />Item A.
<br />DescnipI
<br />Total Amount
<br />Total Amoont
<br />Total Amount
<br />Total Amount
<br />Provide AV Projectors and sound system and Telecommunication head end and cabling in
<br />]
<br />Classrooms Aand B.
<br />$36,]]5.00
<br />5gl,g9p,00
<br />$yl ggq,p0
<br />Alternate #7 Total
<br />$aB,W0.a0
<br />_
<br />$36,nsm
<br />$41,a8D.00
<br />$3;BW.W
<br />Item No.
<br />Descrption
<br />TMei Amount
<br />TOCaI Amount
<br />Total Amount
<br />Total Amount
<br />Provide proximity card readers at four (4) exterior doors antl associated security system,
<br />g _
<br />keYPad and wirin6' _
<br />$8,3W
<br />$16,911.W _
<br />¢I.,fiSfe.Od
<br />$9g3.W
<br />Alternate #8 Total
<br />$8,3W.W
<br />$36,911.W
<br />µ53,690.W
<br />$9#3.W
<br />Item NO.
<br />Description
<br />Total Amount
<br />Total Amount
<br />TO[al Amouni
<br />Total gmatn[
<br />Provide arou C.1 panels attached he the gypsum board ceiling as shown on the drawings.
<br />__
<br />9
<br />_
<br />_ $3,500
<br />$SO,IOIAO
<br />511,2bd.PJq
<br />35,650.00
<br />Alternate #9 Total'
<br />$3,500.00
<br />$10,101.00
<br />$12,201
<br />$5,650.W
<br />'Total Amount (Base Bid &Alt. 1, 2, 3, 4, 5, 5, 7, 8 8a 9) 5na,zsa.W I
<br />_ ;]a],3D6.W $9a1,aW.W $S,o30,Ws.Do
<br />edg ement of RWIPI ed Atldendum t
<br />N/A
<br />Yesuslon
<br />ARatlavi[N/A
<br />ff
<br />Ves
<br />Yes
<br />N/A
<br />Yes
<br />Yes
<br />Yes
<br />ble Bidder Qualification
<br />NIA
<br />Pm -Qualified
<br />Pre-Q-1iied
<br />Pre -qualified
<br />I hereby certify that the
<br />move B,Iy antl separately Ndembems bid, received for IN, project on November 27, 2018Atli-
<br />Alicia Caameckl, Project Engineer
<br />ser rea.izaszclassroom 11i1111—CiDINDIN—M AND awaanurv-,vserD cun,eem A,A e,eras
<br />
|