My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6D (2)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
05-08-12 Packet
>
6D (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 10:18:47 AM
Creation date
5/4/2012 10:30:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
me rn or ure <br />Community & Economic Development <br />its <br />1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 <br />To: Redevelopment Commission <br />From: David Relos, Economic Development Planner )/ <br />Subject: South Bend Animal Care & Control <br />Additional funding for project completion <br />Date: May 08, 2012 <br />On February 19, 2010, the Commission approved funding of $1.5 million for a new South <br />Bend Animal Care & Control Shelter at 521 Eclipse Place. When bids were received, the <br />project came in much above that amount, and it was apparent additional funding was <br />required. <br />On August 9, 2011, the Commission approved $400,000 in additional funding, which <br />allowed the project to be awarded to the low bidder. This funding allowed the project to <br />move forward, but left no budget contingency. <br />As construction progressed, five items were discovered that need to be addressed. They <br />are: <br />• contaminated soils were found (removal cost $10,000) <br />• skim coat original wood floor to make it level ($12,000) <br />• fiber optic line to the building ($11,000) <br />• design modification requires a new water heater ($1,800) <br />• night drop off area cages ($2,240) <br />To address these items and complete the project, $43,000 in additional funding is needed. <br />This allows approximately $6,000 in additional funds in case another item is discovered. <br />Staff requests Commission approval of an additional $43,000, to complete this important <br />project for the care and control of the animal population in South Bend. <br />What We Do Today Makes A Difference! <br />
The URL can be used to link to this page
Your browser does not support the video tag.