Laserfiche WebLink
Tuesday January 16th., 1923. -- <br />Beard met in regulhr session at 9:00 A.M. All members present, <br />Councilman Sid Thornton appeared before the Bearer and <br />requested permission to have St. Peter Street and Notre Dame Avenue <br />at La Salle <br />Avenue closed during the coasting period. This natter referred <br />to the Safety Board <br />Upon raquest of the Building Commissioner <br />the Ap-keep of <br />Edmund La Fortune ' s Auto used for inspeetion work was iAxttrad <br />o $2.00 per day <br />instrad of $50.00 per, months <br />Bids were received, opened and read on the <br />following, - <br />TRUNK SEWER IN ALLEY EAST OF HIGH STREET, <br />FAIRVIEW AVENUE, <br />IRVINGTON AVENUE, ECKMAN STREET, OAKSIDE STREET AND WOODSIDE STREET AND HIGH <br />IN WEI&ER'S ADDITION. Under Improvment Resolution No. 1074. <br />_STREET <br />.Bid of Geo. A. Harrop, <br />24 inch pipe sewer per 1in, ft. <br />$4.50 <br />20-inch " "" per lin ft. <br />4.00 <br />18 inch " nn per lin ft. <br />3.75 <br />15 inch ." "" per lin ft. <br />3.25 <br />12 inches " "« per lin ft. <br />3.00 <br />10 inch « "« per 1-in ft., <br />2.00 <br />8 inch " n« .per lin ft. <br />-70 <br />6 inches " "" per lin ft,. <br />1.10 <br />.:Manholes per ft. <br />7.00 <br />Manholes, curbs and eovers, each <br />18.00 <br />Storrs water inlets, each . <br />10.00 <br />Check 9088.00 <br />Prices based on street being excavated to <br />established grade, <br />Bid efStsples & Ackerman <br />- 24 inch pipe peer lin ft, <br />$4.80 <br />22 inch pipe per lin ft. <br />4.60 <br />20 inch pipe per lin ft-* <br />g.f <br />18 inch pipe per lin ft. <br />4.00 <br />15 inch pipe per tin ft: <br />3.80 <br />12 inch pipe per lin ft. <br />3,00 <br />10 inch pipe per lin ft, <br />2,60 <br />8 inch pipe per lin ft. <br />.60 <br />6 inch pipe per lin ft. <br />1.00 <br />Maholes per ft. - <br />7.00 <br />Manholes, curbs and covers, each <br />14.00 <br />Storm water inlets, each <br />10.00 <br />{ Certified check $821.00 <br />e <br />Bid of Angelo Mareinni <br />24 inch sewer per lin ft. <br />5.50 <br />22 inch sewer per lin ft. <br />5.00 <br />18 inch sewer per lin ft. <br />3.98 <br />15 inch sewer per tin ft. <br />2.50 <br />12 inch sewer per lin ft. <br />2.50 <br />10 inch sewer per lin ft. <br />2.33 <br />8 inch sewer per lin ft: <br />1.00 <br />6 inch sewer per lin ft. <br />1.00 <br />Manholes per lin ft. <br />10.00 <br />Manholes curbs and covers, each.... �' <br />17.00 <br />Storm water inlets, each' <br />16.00 <br />' I proposes to begin said work in Aprill923, <br />Certified check $1000.00 <br />