My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6H (2)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
10-25-11 Packet
>
6H (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 12:29:42 PM
Creation date
10/21/2011 12:30:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� NCB <br />apUTN B <br />Community & Economic Development <br />227 West Jefferson, Suite 1200, South Bend, Indiana 46601 -1830 ❑ Phone 574/235 -9371 - Fax 574/235 -9021 <br />To: South Bend Redevelopment Commission <br />From: Jitin Kain, Senior CED Specialist <br />Subject: Study of Eddy Street Corridor <br />Date: October 19, 2011 <br />The Northeast Neighborhood Revitalization Organization (NNRO) would like to engage the services of DLZ <br />Indiana, LLC to conduct a conceptual streetscape study of the Eddy Street corridor from Campeau Street <br />south to Colfax Ave. The study will look at streetscape improvements to Eddy St. within and beyond the <br />public right -of -way (R/W) outside of the street pavement and include: <br />• Replacement of curb, sidewalk and ADA compliant sidewalk ramps <br />• Replacement of streetlights to match the SR23 project <br />• Introduction of a tree lawn along the East and West sides of the street <br />• Replacement of street signs to match Eddy St. Commons <br />In order to accomplish the above, DLZ will study the existing R/W and determine if additional properties need <br />to be acquired for the project. They will also suggest project phasing to ensure prudent use of available TIF <br />funding. A detailed proposal from DLZ is attached for these services. <br />The total fee proposed by DLZ to conduct the study is $28,500. NNRO is proposing a 25/75 split of the fee <br />between them and the Redevelopment Commission. This would equate to $21,375 from the NNDA TIF and <br />$7,125 from the NNRO budget. <br />Staff requests Commission approval to allocate $21,375 from the NNDA TIF towards this study. <br />What We Do Today Makes A Difference 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.