My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C (4)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
06-28-11 Packet
>
6C (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2011 10:18:13 AM
Creation date
6/24/2011 12:05:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
race <br />• r a n •ulc „ o <br />Community & Economic Development <br />1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 fax 574/235 -9021 <br />To: Redevelopment Commission, Board of Public Works <br />From: Bill Schalliol, Economic Development Planner <br />Subject: Resolution 2910 and Addendum To Master Agency Agreement <br />Nimtz Parkway Multi -Use Path - Engineering Project <br />Date: June 23, 2011 <br />Attached to this memorandum is Resolution 2910 and Addendum To Master Agency Agreement for <br />the Nimtz Parkway Multi -Use Path — Engineering Project. The Addendum also includes a <br />professional services proposal from Abonmarche to complete the design and engineering plans <br />related to this project. <br />By way of project history, when Blackthorn was designed in the 1990's, it was always intentioned <br />that a sidewalk would be created throughout the corporate park as development occurred. The <br />decision was made that a sidewalk would be installed in the park when a critical mass of <br />development was reached, and it would be the requirement of each site owner to allow for the <br />installation of a sidewalk at the appropriate time. <br />Over the next several weeks, as part of the Mayflower sewer construction project, the City will be <br />disturbing a large section of right -of -way that is delineated on the attached map. As a way to protect <br />the sewer investment and to allow future access to the sewer corridor, and also as a means to <br />provide a safe walking path from Moreau Court to the entrance of the Blackthorn Golf Course, this is <br />a very opportune time to construct a 8' wide multi -use path on the south side of Nimtz Parkway. <br />Abonmarche, the designers of the sewer project, have most of the site information necessary for the <br />project design and will engineer a trail through this Phase 1 corridor. Construction of the walk could <br />be done this fall as part of the restoration work of the construction path. The professional service <br />proposal is in the amount of $38,800.00 and a detailed engineering estimate will be created as part <br />of the project design. <br />Staff requests approval of Resolution 2910 and the Addendum To Master Agency Agreement for the <br />Nimtz Parkway Multi -Use Path — Engineering Project. <br />What We Do Today Makes A Difference! <br />
The URL can be used to link to this page
Your browser does not support the video tag.