My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6D 10
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
06-14-11 Packet
>
6D 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:25:11 PM
Creation date
6/10/2011 12:59:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
& 13 C/o) <br />memo r an cl u rn „�► <br />,V1,ilr;r, o <br />Community & Economic Development <br />1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 <br />To: Redevelopment Commission, Board of Public Works <br />From: Bill Schalliol, Economic Development Planner <br />Subject: Resolution 2893 and Addendum To Master Agency Agreement <br />Mayflower /Hutsfield Square Infrastructure Project <br />Date: June 8, 2011 <br />Attached to this memorandum is Resolution 2893 and Addendum To Master Agency Agreement for <br />the Mayflower /Hutsfield Square Infrastructure Project. Attached to the Addendum is a copy of the <br />professional services proposal from Abonmarche to provide project oversight and inspection related <br />to both the sewer and roadway construction projects. <br />The Mayflower /Hutsfield Square Infrastructure Project consists of two projects. The first is the <br />Mayflower Boulevard Construction with a contract amount of $2,499,736.21. This work will include <br />the construction of a new roadway, all related drainage and utility work, street lights and pedestrian <br />trail. The work will also include a new traffic signal at Mayflower Boulevard and Cleveland Road. <br />The second project is the Mayflower Sewer Construction with a contract amount of $1,868,743.50. <br />This work will include the construction of a new sewer force line that will intercept sewage at the <br />intersection of Mayflower and Brick and force the material to the Blackthorn Lift Station located on <br />Nimtz Parkway. There will be additional sewer network configuration that will be part of this project <br />that will free up capacity in the existing network on the northwest side of town. <br />There is also a contract from Abonmarche to provide Project Oversight/Inspection in the amount of <br />$86,740.00. The City will assign an inspector to this project but Abonmarche will serve as an <br />additional inspector and be in the field to deal with project construction issues. <br />Staff requests approval of Resolution 2893 and the Addendum To Master Agency Agreement for the <br />Mayflower /Hutsfield Square Infrastructure Project. <br />What We Do Today Makes A Difference! <br />
The URL can be used to link to this page
Your browser does not support the video tag.