Laserfiche WebLink
McGormU Engineering, LLC. <br />234 N. Ironwood Dr. <br />South Bend, IN 46615 <br />MEL Protect No. 01673 <br />Tabulation of Bids <br />City of South Bend Board of Public Works <br />Miami Basin Drainage Improvements Project <br />City Project No. 116-082C <br />Bids Open Date: July 24, 2018 <br />HRP Construction, Inc. <br />Reith Riley Construction Co„ <br />Engineer's Estimate <br />Item <br />No. <br />Description <br />Unit <br />Quantity <br />Unit Price Total Amount <br />Unit Price Total Amount <br />Unit Price Total Amount <br />1 <br />- - -i - - <br />Mobilization and Demobilization <br />-9- ----------- - - - ----- - ------ <br />-'�f <br />LS <br />1 <br />$ 24,723,56 <br />$ 24�723.56 <br />$ 166,125.00 <br />$166,125.00 <br />$ 20,400 <br />----------------- <br />$ 20,400.00 <br />Clear �' W�-; <br />Right <br />Tg- <br />1 <br />$ 7,000.00 <br />$ 7d000-00 <br />$ 81006-00 <br />$ 81006-00 <br />--$ ----- - -- 5200-0 <br />1 5,000.00 <br />----- <br />-------- --- -------- <br />EACH <br />7 <br />-- ---------- -- <br />$ 400,00 <br />$ 2,800.00 <br />$ 867.00 <br />$ 6,069.00 <br />$ 300 <br />$ 2,100,00 <br />4 <br />---- <br />Gate, Remove <br />--- - - - ----- - ------ <br />EACH -- <br />------ - ----- -2 <br />$ 750.00 <br />$ 1,500,00 <br />$ 255.00 <br />$ 510,00 <br />$ 50 0 <br />$ 1,000.00 <br />6-Concrete-Dri've, <br />Remove <br />EACH <br />2 <br />$ 1,000.00 <br />$ 2,000.00 <br />$ 1,733.00 <br />$ 3,466.00 <br />-- ----- - ---- - <br />$ 1,000 <br />--------------- <br />- <br />$ 2.000.00 <br />- rr r . .— <br />Remove <br />SYS <br />95 <br />$ 15.00 <br />$ 1,425.00 <br />$ 16.00 <br />$ 1,520.00 <br />$ 30 <br />$ 2,850.00 <br />7 <br />Curb, Remove <br />20.00 <br />$ 3'660-00 <br />2,013.00 <br />$ 35 <br />$ 6,405.00 <br />8 <br />Excavation, Common <br />------------- <br />CYS <br />-- <br />280 <br />$ 70.W <br />$ 19,600.66 <br />$ 49-001 <br />$ 13,720.00 <br />------------- <br />$ 40 <br />$ 11,200.00 <br />9 <br />Borrow <br />CYS <br />710 <br />40.00 <br />$ 28,400.00 <br />$ 51.0�O <br />$ 36.210�00 <br />$ 60 <br />$ 42,600.00 <br />_ _ <br />- <br />6-3-0, <br />-- ------- <br />$ 76.00 <br />$ 47,880.00 <br />$ 125.00 <br />- - <br />$ 78,750.00 <br />-------------- --- <br />$ 75 <br />$ 47,260.00 <br />1 1 <br />Water Quality Structure Mainte.nan cc <br />.. ..... . .. .... <br />EACH <br />3 <br />$ 1,200.00 <br />$ 3,600.00 <br />$ 1,020.00 <br />$ 3,066.0or, <br />---j ------ -- 5,000 <br />$ 15,000,00 <br />12 <br />Topsoil <br />--------------------------------------- <br />CYS <br />--- <br />242 <br />$ 45,00 <br />$ 10,890.00 <br />$ 54.00 <br />$ 13,068,00 <br />$ 50 <br />$ 12.100.00 <br />13 <br />No.2--S--t-o--n-e <br />T <br />$ 65.001 <br />$ 9,100o0 <br />$ 18.00 <br />$ 2,520.00 <br />$ 40 <br />$ 5,600.o0 <br />14 <br />Temporary Seeding <br />SYS <br />7,260 <br />$ 0.901 <br />$ 6,5X00 <br />$ 0.33 <br />$ 2,395.80 <br />0.4 <br />$ 2,904.00 <br />15 <br />Temporary Silt Fence <br />46 <br />2,50 <br />$ 1 " 350,00 <br />$ 2.00 <br />$ 1,080,00 <br />$ 2 <br />$ 1.080.00 <br />$ 2.50 <br />$ 3'300.00 <br />$ 6.00 <br />$ 7,920.00 <br />$ 2 <br />$ 2.640.00 <br />17 <br />Compacted Aggregate, No 53 <br />----------- <br />TON <br />360 <br />$ 50.00 <br />$ 18'000�00 <br />$ 41.00 <br />$ 14,760.00 <br />— <br />$ 45 <br />------------------ <br />$ 16,200.00 <br />18 <br />HMA Patching, Type A <br />f6N1*1 <br />250.06 <br />4.260.00 <br />$ 326,00 <br />$ 5,542.00 <br />250 <br />$ 4,250.00 <br />19 <br />------- <br />PCCP Pavement, 9 in. <br />- <br />SYS <br />380 <br />$ 76,00 <br />$ 28,880.00 <br />$ 91.00 <br />$ 34,580.00 <br />$ 80 <br />$ 30,400,00 <br />FWnce5ate, Calevered, 24- <br />-------- -------------nti------------------------------ <br />- EACH <br />2 <br />$ 2,100.00 <br />$ 4,200.00 <br />$ 766.00 <br />r-jr - --r-r- r r rr r - " r <br />$ 1,530.00 <br />- -Irrr- r I -I -I <br />$ 6,000 <br />I -- - ----- - ---- <br />$ 12,000.00 <br />21 <br />Sidewalk, Concrete <br />SYS <br />66 <br />$ 64.00 <br />. 6-1 <br />4,326- <br />$ o <br />82.00 <br />$ 6,660.00 <br />$ 150 <br />$ 12,000,00 <br />22 <br />Curb and Gutter, Concrete, Type B <br />LFT <br />110 <br />$ :36,00 <br />$ 3,960,00 <br />$ 55.00 <br />$ 6,050m <br />$ 60 <br />$ 6,600.00 <br />23 <br />Curb, Integral, Concrete <br />---- - - - ------------ <br />LFT <br />117 <br />$ 34.00 <br />$ 3,978.00 <br />$ 52,00 <br />$ 6,0K00 <br />$ 60 <br />$ 7,020.00 <br />24 <br />Riprap, Class I <br />TON <br />366 <br />$ 135.00 <br />$ 49,410.00 <br />$ 103.00 <br />$ 37,698.00 <br />75 <br />$ 27,450,00 <br />25 <br />Riprap, Revetment <br />-- - ----- - - - ------------- <br />TON <br />100 <br />$ 100.00 <br />$ 10,000.00 <br />$ 104,00 <br />$ 10,400.00 <br />$ 60 <br />$ 13,000.00 <br />--- <br />1,817 <br />$ 1.50 <br />$ 2,725,50 <br />TOO <br />$ -- 1,817.00 - " - - <br />$ ----- - ------- 1 <br />$ 1,817.00 <br />27 <br />- ----- <br />ing <br />---------- ----------- ------------------------ <br />SYS <br />357 <br />$ 13A2 <br />$ 4,790.94 <br />$ 13.00 <br />$ 4,641.00 <br />22 <br />$ 7,854�00 <br />28 <br />Erosion Control Blanket <br />SYS <br />1,111 <br />$ 2.80 <br />$ 3,110.130 <br />$ 4.00 <br />$ 4,444,00 <br />$ 6 <br />$ 6,666.00 <br />29 <br />Turf Reinforcement Mat <br />----------------- ---------------- <br />SYS <br />706 <br />$ 58,70 <br />$ 41�442.20 <br />$ 65.00 <br />$ 45�890,00 <br />----------------- <br />$ 35 <br />— <br />$ 24.7%00 <br />30 <br />Plant, Deciduous Tree, Over 2 IN. to <br />EACH <br />4 <br />$ 576,00 <br />$ 2,300.00 <br />$ 612.00 <br />$ 2,448.00 <br />------- - --------- <br />$ 500 <br />- � - r - .- <br />$ 2,000.00 <br />2,5 IN. <br />31 <br />---- ------------- ---------- ----- <br />Plant, Coniferous Evergreen, 72 K to <br />-------- <br />EACH <br />-------------- <br />3 <br />-------- <br />$ 650,00 <br />$ 1,950,0�0 <br />$ 586,00 <br />$ 1,758.00 <br />$ 375 <br />$ 1,125.00 <br />96 IN. <br />. <br />--------- <br />32 <br />- - - ----- <br />Casting, Manhole, Adjust to Grade <br />EACH <br />------------ - -- <br />3 <br />$ 400.00 <br />$ 1,200.00 <br />$ 1,643,00 <br />$ 4,929.00 <br />........ . ..... . .. <br />$ 750i <br />--- <br />$ 2,250.00 <br />....... <br />... .__._2ent <br />$ 182.15 <br />$127,505,00 <br />$ 325.00 <br />$227,500.00 <br />$ 100 <br />$ 70,000.00 <br />34 <br />Maintenance of Traffic <br />L S <br />i <br />$ 6,500m <br />$ 6,500.00 <br />$ 4,482.00 <br />$ 4,482.00 <br />---------------- --- <br />$ 10X0 <br />— <br />$ 10,000,00 <br />35 <br />Detinealor Post, Flexible, Type I <br />EACH <br />1-il <br />$ 55.00 <br />i5.00 <br />715.00 <br />$ 56.00 <br />$ 728.00 <br />$ 50 <br />$ 650.00 <br />1 ITOTAL <br />77g- <br />"i <br />$493,000.00 <br />$7 68,273.80 <br />,1/0" <br />- 171 nn <br />$429 <br />I hereby certify that this is a true representation of the Unit Prices associated with the &ds received on July 24, 2018 <br />for the Miami Basin Drainage Improvements, <br />eo <br />19800330 <br />STATE OF <br />PO, <br />0��, lAml All*, <br />ONAL <br />David, L McCormick, PE, DWRE <br />Indiana Professional Engineer No. 19800330 <br />Date: 712612018 <br />