McGormU Engineering, LLC.
<br />234 N. Ironwood Dr.
<br />South Bend, IN 46615
<br />MEL Protect No. 01673
<br />Tabulation of Bids
<br />City of South Bend Board of Public Works
<br />Miami Basin Drainage Improvements Project
<br />City Project No. 116-082C
<br />Bids Open Date: July 24, 2018
<br />HRP Construction, Inc.
<br />Reith Riley Construction Co„
<br />Engineer's Estimate
<br />Item
<br />No.
<br />Description
<br />Unit
<br />Quantity
<br />Unit Price Total Amount
<br />Unit Price Total Amount
<br />Unit Price Total Amount
<br />1
<br />- - -i - -
<br />Mobilization and Demobilization
<br />-9- ----------- - - - ----- - ------
<br />-'�f
<br />LS
<br />1
<br />$ 24,723,56
<br />$ 24�723.56
<br />$ 166,125.00
<br />$166,125.00
<br />$ 20,400
<br />-----------------
<br />$ 20,400.00
<br />Clear �' W�-;
<br />Right
<br />Tg-
<br />1
<br />$ 7,000.00
<br />$ 7d000-00
<br />$ 81006-00
<br />$ 81006-00
<br />--$ ----- - -- 5200-0
<br />1 5,000.00
<br />-----
<br />-------- --- --------
<br />EACH
<br />7
<br />-- ---------- --
<br />$ 400,00
<br />$ 2,800.00
<br />$ 867.00
<br />$ 6,069.00
<br />$ 300
<br />$ 2,100,00
<br />4
<br />----
<br />Gate, Remove
<br />--- - - - ----- - ------
<br />EACH --
<br />------ - ----- -2
<br />$ 750.00
<br />$ 1,500,00
<br />$ 255.00
<br />$ 510,00
<br />$ 50 0
<br />$ 1,000.00
<br />6-Concrete-Dri've,
<br />Remove
<br />EACH
<br />2
<br />$ 1,000.00
<br />$ 2,000.00
<br />$ 1,733.00
<br />$ 3,466.00
<br />-- ----- - ---- -
<br />$ 1,000
<br />---------------
<br />-
<br />$ 2.000.00
<br />- rr r . .—
<br />Remove
<br />SYS
<br />95
<br />$ 15.00
<br />$ 1,425.00
<br />$ 16.00
<br />$ 1,520.00
<br />$ 30
<br />$ 2,850.00
<br />7
<br />Curb, Remove
<br />20.00
<br />$ 3'660-00
<br />2,013.00
<br />$ 35
<br />$ 6,405.00
<br />8
<br />Excavation, Common
<br />-------------
<br />CYS
<br />--
<br />280
<br />$ 70.W
<br />$ 19,600.66
<br />$ 49-001
<br />$ 13,720.00
<br />-------------
<br />$ 40
<br />$ 11,200.00
<br />9
<br />Borrow
<br />CYS
<br />710
<br />40.00
<br />$ 28,400.00
<br />$ 51.0�O
<br />$ 36.210�00
<br />$ 60
<br />$ 42,600.00
<br />_ _
<br />-
<br />6-3-0,
<br />-- -------
<br />$ 76.00
<br />$ 47,880.00
<br />$ 125.00
<br />- -
<br />$ 78,750.00
<br />-------------- ---
<br />$ 75
<br />$ 47,260.00
<br />1 1
<br />Water Quality Structure Mainte.nan cc
<br />.. ..... . .. ....
<br />EACH
<br />3
<br />$ 1,200.00
<br />$ 3,600.00
<br />$ 1,020.00
<br />$ 3,066.0or,
<br />---j ------ -- 5,000
<br />$ 15,000,00
<br />12
<br />Topsoil
<br />---------------------------------------
<br />CYS
<br />---
<br />242
<br />$ 45,00
<br />$ 10,890.00
<br />$ 54.00
<br />$ 13,068,00
<br />$ 50
<br />$ 12.100.00
<br />13
<br />No.2--S--t-o--n-e
<br />T
<br />$ 65.001
<br />$ 9,100o0
<br />$ 18.00
<br />$ 2,520.00
<br />$ 40
<br />$ 5,600.o0
<br />14
<br />Temporary Seeding
<br />SYS
<br />7,260
<br />$ 0.901
<br />$ 6,5X00
<br />$ 0.33
<br />$ 2,395.80
<br />0.4
<br />$ 2,904.00
<br />15
<br />Temporary Silt Fence
<br />46
<br />2,50
<br />$ 1 " 350,00
<br />$ 2.00
<br />$ 1,080,00
<br />$ 2
<br />$ 1.080.00
<br />$ 2.50
<br />$ 3'300.00
<br />$ 6.00
<br />$ 7,920.00
<br />$ 2
<br />$ 2.640.00
<br />17
<br />Compacted Aggregate, No 53
<br />-----------
<br />TON
<br />360
<br />$ 50.00
<br />$ 18'000�00
<br />$ 41.00
<br />$ 14,760.00
<br />—
<br />$ 45
<br />------------------
<br />$ 16,200.00
<br />18
<br />HMA Patching, Type A
<br />f6N1*1
<br />250.06
<br />4.260.00
<br />$ 326,00
<br />$ 5,542.00
<br />250
<br />$ 4,250.00
<br />19
<br />-------
<br />PCCP Pavement, 9 in.
<br />-
<br />SYS
<br />380
<br />$ 76,00
<br />$ 28,880.00
<br />$ 91.00
<br />$ 34,580.00
<br />$ 80
<br />$ 30,400,00
<br />FWnce5ate, Calevered, 24-
<br />-------- -------------nti------------------------------
<br />- EACH
<br />2
<br />$ 2,100.00
<br />$ 4,200.00
<br />$ 766.00
<br />r-jr - --r-r- r r rr r - " r
<br />$ 1,530.00
<br />- -Irrr- r I -I -I
<br />$ 6,000
<br />I -- - ----- - ----
<br />$ 12,000.00
<br />21
<br />Sidewalk, Concrete
<br />SYS
<br />66
<br />$ 64.00
<br />. 6-1
<br />4,326-
<br />$ o
<br />82.00
<br />$ 6,660.00
<br />$ 150
<br />$ 12,000,00
<br />22
<br />Curb and Gutter, Concrete, Type B
<br />LFT
<br />110
<br />$ :36,00
<br />$ 3,960,00
<br />$ 55.00
<br />$ 6,050m
<br />$ 60
<br />$ 6,600.00
<br />23
<br />Curb, Integral, Concrete
<br />---- - - - ------------
<br />LFT
<br />117
<br />$ 34.00
<br />$ 3,978.00
<br />$ 52,00
<br />$ 6,0K00
<br />$ 60
<br />$ 7,020.00
<br />24
<br />Riprap, Class I
<br />TON
<br />366
<br />$ 135.00
<br />$ 49,410.00
<br />$ 103.00
<br />$ 37,698.00
<br />75
<br />$ 27,450,00
<br />25
<br />Riprap, Revetment
<br />-- - ----- - - - -------------
<br />TON
<br />100
<br />$ 100.00
<br />$ 10,000.00
<br />$ 104,00
<br />$ 10,400.00
<br />$ 60
<br />$ 13,000.00
<br />---
<br />1,817
<br />$ 1.50
<br />$ 2,725,50
<br />TOO
<br />$ -- 1,817.00 - " - -
<br />$ ----- - ------- 1
<br />$ 1,817.00
<br />27
<br />- -----
<br />ing
<br />---------- ----------- ------------------------
<br />SYS
<br />357
<br />$ 13A2
<br />$ 4,790.94
<br />$ 13.00
<br />$ 4,641.00
<br />22
<br />$ 7,854�00
<br />28
<br />Erosion Control Blanket
<br />SYS
<br />1,111
<br />$ 2.80
<br />$ 3,110.130
<br />$ 4.00
<br />$ 4,444,00
<br />$ 6
<br />$ 6,666.00
<br />29
<br />Turf Reinforcement Mat
<br />----------------- ----------------
<br />SYS
<br />706
<br />$ 58,70
<br />$ 41�442.20
<br />$ 65.00
<br />$ 45�890,00
<br />-----------------
<br />$ 35
<br />—
<br />$ 24.7%00
<br />30
<br />Plant, Deciduous Tree, Over 2 IN. to
<br />EACH
<br />4
<br />$ 576,00
<br />$ 2,300.00
<br />$ 612.00
<br />$ 2,448.00
<br />------- - ---------
<br />$ 500
<br />- � - r - .-
<br />$ 2,000.00
<br />2,5 IN.
<br />31
<br />---- ------------- ---------- -----
<br />Plant, Coniferous Evergreen, 72 K to
<br />--------
<br />EACH
<br />--------------
<br />3
<br />--------
<br />$ 650,00
<br />$ 1,950,0�0
<br />$ 586,00
<br />$ 1,758.00
<br />$ 375
<br />$ 1,125.00
<br />96 IN.
<br />.
<br />---------
<br />32
<br />- - - -----
<br />Casting, Manhole, Adjust to Grade
<br />EACH
<br />------------ - --
<br />3
<br />$ 400.00
<br />$ 1,200.00
<br />$ 1,643,00
<br />$ 4,929.00
<br />........ . ..... . ..
<br />$ 750i
<br />---
<br />$ 2,250.00
<br />.......
<br />... .__._2ent
<br />$ 182.15
<br />$127,505,00
<br />$ 325.00
<br />$227,500.00
<br />$ 100
<br />$ 70,000.00
<br />34
<br />Maintenance of Traffic
<br />L S
<br />i
<br />$ 6,500m
<br />$ 6,500.00
<br />$ 4,482.00
<br />$ 4,482.00
<br />---------------- ---
<br />$ 10X0
<br />—
<br />$ 10,000,00
<br />35
<br />Detinealor Post, Flexible, Type I
<br />EACH
<br />1-il
<br />$ 55.00
<br />i5.00
<br />715.00
<br />$ 56.00
<br />$ 728.00
<br />$ 50
<br />$ 650.00
<br />1 ITOTAL
<br />77g-
<br />"i
<br />$493,000.00
<br />$7 68,273.80
<br />,1/0"
<br />- 171 nn
<br />$429
<br />I hereby certify that this is a true representation of the Unit Prices associated with the &ds received on July 24, 2018
<br />for the Miami Basin Drainage Improvements,
<br />eo
<br />19800330
<br />STATE OF
<br />PO,
<br />0��, lAml All*,
<br />ONAL
<br />David, L McCormick, PE, DWRE
<br />Indiana Professional Engineer No. 19800330
<br />Date: 712612018
<br />
|