Laserfiche WebLink
Contractors Bid for Public Work - City of South Bend <br />Project No, 117-083B <br />Bid Tab <br />Off -Street Parking Lot at Wayne St. and St. Louis Blvd <br />City Project No. 117-0838 <br />City of South Bend <br />Bid Tabulation <br />Base Bid <br />Engineer's Estimate <br />Reith-Riley <br />Walsh Kelly, Inc. <br />Item <br />N. <br />Description <br />P <br />4writ eY <br />Unit <br />Unit Price <br />Amount <br />�� <br />Unit Price <br />Amount <br />���� <br />Unit Price <br />mount <br />1. <br />truction Engineering <br />1 <br />US <br />1.50% <br />$4,787.67 <br />$61800.00 <br />$6,800.00 <br />$6046.95 <br />$6,046.95 <br />2. <br />1 <br />LS <br />5.00% <br />$15,198.95 <br />$6,270.00 <br />$6,270.00 <br />$19,800.00 <br />$19,800,00 <br />3. <br />EM.1bilization/Darrobilioation <br />Schedule <br />1 <br />LS <br />$1,000.00 <br />$1,000.00 <br />$350.00 <br />$350.00 <br />$350.00 <br />$360.00 <br />4. <br />Monthry Update <br />7 <br />MO <br />$250.00 <br />$1,750.00 <br />$85.00 <br />$595.00 <br />$50.00 <br />$350.00 <br />5. <br />aring Right of Way <br />1 <br />LS <br />$5,000.00 <br />$5,000.00 <br />$8,000.00 <br />$8,000.00 <br />$7,600.00 <br />$7,600.00 <br />6. <br />Tree, Remove, 48" <br />1 <br />EACH <br />$1,800.00 <br />$1,800.00 <br />$2,550.00 <br />$2,550.DO <br />$2,800.00 <br />$2,800oO <br />7. <br />Concrete Pavement Removal <br />125 <br />SYD <br />$15.00 <br />$1,875.00 <br />$60.00 <br />$7,500.00 <br />$11.00 <br />$1,375.00 <br />8. <br />Sheet Sign, Relocate <br />3 <br />EACH <br />$300.00 <br />$900.00 <br />$269.00 <br />$807.00 <br />$179.00 <br />$537.00 <br />9. <br />Inlet Protection <br />5 <br />EACH <br />$200.00 <br />$1,000.00 <br />$200.00 <br />$1,000.00 <br />$65.00 <br />$325.00 <br />10. <br />emporary Erosion and Sediment Control <br />1 <br />LS <br />$2,000.00 <br />$2,000.00 <br />$3,000.00 <br />$3.000.00 <br />$550.00 <br />$550.00 <br />11. <br />ommon Excavation <br />2,790 <br />CYD <br />$20.00 <br />$55.300.00 <br />$25.00 <br />S69,750.00 <br />$35,50 <br />S99,045.00 <br />12 <br />CoOpacted Aggregate for Base, No. 53 <br />1,280 <br />TON <br />$25.00 <br />$32,000.00 <br />$2.sOO <br />$37,120,00 <br />$26.00 <br />$33,280,00 <br />13. <br />HMA Surface, 9.5mm, Type B <br />310 <br />TON <br />$85.00 <br />$26,350,00 <br />$125.00 <br />$38,750.00 <br />$103.00 <br />$31,930.00 <br />14. <br />HMA Intermediate, 19.5mm, Type B <br />520 <br />TON <br />$80.00 <br />$41,600,00 <br />$86.00 <br />$44,720,00 <br />$67.00 <br />$34,940,00 <br />15. <br />Sidewalk, Concrete, 4" <br />15 <br />SYD <br />$60.00 <br />$900.00 <br />$100.00 <br />$1,500.00 <br />$153.00 <br />$2,295.00 <br />16. <br />Cohcrete Curb, 6" <br />1,096 <br />LFT <br />$22.00 <br />$24,112.00 <br />$27.00 <br />$29,592,00 <br />$40.00 <br />$43,B40.00 <br />17. <br />PCGP for Approaches, 6" <br />68 <br />SYD <br />$60.00 <br />$4,080.00 <br />$63.00 <br />$4,284.00 <br />$80.00 <br />$5,440.00 <br />18. <br />Sodding <br />425 <br />SYD <br />$6.00 <br />$2,550.00 <br />$8.10 <br />$3,442.50 <br />$12.95 <br />$5,503.75 <br />19. <br />Mulched Seeding, Type U <br />160 <br />SYD <br />$2.00 <br />$320.00 <br />$4.25 <br />$680.00 <br />$12.96 <br />$2,073.60 <br />20. <br />Tree, Freeman Red Maple, 2.5 <br />3 <br />EACH <br />$620.03 <br />$1,860.00 <br />$545.00 <br />$1,635.00 <br />$560.00 <br />$1,680.00 <br />21. <br />Tree, Shumard Oak, 2.5" <br />11 <br />EACH <br />$620.00 <br />$6,620.00 <br />$545.00 <br />$5,995.00 <br />$565.00 <br />$6,105.00 <br />22. <br />Duppster Enclosure <br />1 <br />LSUM <br />$2,500.00 <br />$2,500.00 <br />$3,300.00 <br />$3,300.00 <br />$4,900.00 <br />54,900.00 <br />23. <br />Storm Sewer Pipe, 18", Perforated <br />339 <br />LFT <br />$60.00 <br />$20,340.00 <br />$78.00 <br />$26,442.00 <br />$69.00 <br />$23.391.00 <br />24. <br />Standard Drywall, 1,800 gallon <br />5 <br />LFT <br />$4,500.00 <br />$22,500.00 <br />$7,850.00 <br />$39,250.00 <br />$6,600.00 <br />$33,000,00 <br />25. <br />2" PVC Schedule 80, wth Pull Rope <br />220 <br />LFT <br />$10.00 <br />$2,200.On <br />$4.98 <br />$1,095 60 <br />$4s8 <br />$1,095.60 <br />26. <br />Service Pont, Parking Lot <br />1 <br />$2,000.00 <br />$2,000.00 <br />$6,777.00 <br />$6,777.00 <br />$6,777.00 <br />$6,777.00 <br />27. <br />4-1�7c No.4 Copper Cable <br />341 <br />$8,00 <br />$2,728.00 <br />$5.80 <br />$1,977.80 <br />$5.80 <br />$1,977.80 <br />28. <br />2" PVC Schedule 80 for Lighting <br />341 <br />JAH <br />$10.00 <br />$3,410.00 <br />$4.80 <br />$1,636.80 <br />$4.80 <br />$1,636.80 <br />29. <br />Ligt Pole Assembly and Foundation <br />5 <br />$3,800.00 <br />$19,000.00 <br />$2,058.00 <br />$10,290.00 <br />$2,058.OU <br />$10,290.00 <br />30. <br />Micellaneeus Equipment for Lghting <br />1 <br />$1,000.00 <br />$1,000.00 <br />$1,682.00 <br />$1,682.00 <br />$1,682.00 <br />$1,682.00 <br />31. <br />Sheet Sign and Post <br />7 <br />EACH <br />$460.00 <br />$3,360.00 <br />$179.oD <br />$1,253.00 <br />$179.00 <br />$1,253.00 <br />32. <br />Lind, Paint, Solid, White, 4" <br />1,345 <br />LFT <br />$1.00 <br />$1,345.00 <br />$0.45 <br />$605.25 <br />$0.30 <br />$403.50 <br />33. <br />Lind, Paint, Solid, Yellow, 4" <br />660 <br />LFT <br />$1.00 <br />$660.00 <br />$0.61 <br />$429.00 <br />$0.30 <br />$198.00 <br />34. <br />Pavement Message Marking, Paint, ADA Symbol <br />4 <br />EACH <br />$300.00 <br />$1,200.00 <br />$32.00 <br />$128.00 <br />$40.00 <br />$160.OD <br />35. <br />Pavement Message Marking, Paint, Lane Indication Arrow <br />3 <br />EACH <br />$300.00 <br />$900.03 <br />$35.00 <br />$105.OD <br />$16.00 <br />$48.00 <br />36. <br />Concrete Curb, Remove <br />342 <br />LFT <br />$12.00 <br />$4,104.00 <br />$20.00 <br />$6,840.00 <br />$8.00 <br />$2,736.00 <br />37. <br />Shrub, Winter Gem B-ond, 24" Ht. <br />59 <br />1 EACH <br />$85.00 <br />$5,015.00 <br />$65.00 <br />$3,835.00 <br />$75.00 <br />$4,425.00 <br />To - Base Bid <br />$323,965.62 <br />$379,986.95 <br />$399,750.00 <br />�a,15w �•ttf <br />Addendum#1 Acknowledged r- �} tt Yes Yes <br />I hereby certify that the above truly and accurately <br />represents i,bids received for this project on July 10, 2018 N0.39"aGi1:332 t7r <br />i <br />s„ <br />Chad A. Knip, PIE. <br />Abonmarche Consultants, Inc <br />M. Ed <br />