Contractors Bid for Public Work - City of South Bend
<br />Project No, 117-083B
<br />Bid Tab
<br />Off -Street Parking Lot at Wayne St. and St. Louis Blvd
<br />City Project No. 117-0838
<br />City of South Bend
<br />Bid Tabulation
<br />Base Bid
<br />Engineer's Estimate
<br />Reith-Riley
<br />Walsh Kelly, Inc.
<br />Item
<br />N.
<br />Description
<br />P
<br />4writ eY
<br />Unit
<br />Unit Price
<br />Amount
<br />��
<br />Unit Price
<br />Amount
<br />����
<br />Unit Price
<br />mount
<br />1.
<br />truction Engineering
<br />1
<br />US
<br />1.50%
<br />$4,787.67
<br />$61800.00
<br />$6,800.00
<br />$6046.95
<br />$6,046.95
<br />2.
<br />1
<br />LS
<br />5.00%
<br />$15,198.95
<br />$6,270.00
<br />$6,270.00
<br />$19,800.00
<br />$19,800,00
<br />3.
<br />EM.1bilization/Darrobilioation
<br />Schedule
<br />1
<br />LS
<br />$1,000.00
<br />$1,000.00
<br />$350.00
<br />$350.00
<br />$350.00
<br />$360.00
<br />4.
<br />Monthry Update
<br />7
<br />MO
<br />$250.00
<br />$1,750.00
<br />$85.00
<br />$595.00
<br />$50.00
<br />$350.00
<br />5.
<br />aring Right of Way
<br />1
<br />LS
<br />$5,000.00
<br />$5,000.00
<br />$8,000.00
<br />$8,000.00
<br />$7,600.00
<br />$7,600.00
<br />6.
<br />Tree, Remove, 48"
<br />1
<br />EACH
<br />$1,800.00
<br />$1,800.00
<br />$2,550.00
<br />$2,550.DO
<br />$2,800.00
<br />$2,800oO
<br />7.
<br />Concrete Pavement Removal
<br />125
<br />SYD
<br />$15.00
<br />$1,875.00
<br />$60.00
<br />$7,500.00
<br />$11.00
<br />$1,375.00
<br />8.
<br />Sheet Sign, Relocate
<br />3
<br />EACH
<br />$300.00
<br />$900.00
<br />$269.00
<br />$807.00
<br />$179.00
<br />$537.00
<br />9.
<br />Inlet Protection
<br />5
<br />EACH
<br />$200.00
<br />$1,000.00
<br />$200.00
<br />$1,000.00
<br />$65.00
<br />$325.00
<br />10.
<br />emporary Erosion and Sediment Control
<br />1
<br />LS
<br />$2,000.00
<br />$2,000.00
<br />$3,000.00
<br />$3.000.00
<br />$550.00
<br />$550.00
<br />11.
<br />ommon Excavation
<br />2,790
<br />CYD
<br />$20.00
<br />$55.300.00
<br />$25.00
<br />S69,750.00
<br />$35,50
<br />S99,045.00
<br />12
<br />CoOpacted Aggregate for Base, No. 53
<br />1,280
<br />TON
<br />$25.00
<br />$32,000.00
<br />$2.sOO
<br />$37,120,00
<br />$26.00
<br />$33,280,00
<br />13.
<br />HMA Surface, 9.5mm, Type B
<br />310
<br />TON
<br />$85.00
<br />$26,350,00
<br />$125.00
<br />$38,750.00
<br />$103.00
<br />$31,930.00
<br />14.
<br />HMA Intermediate, 19.5mm, Type B
<br />520
<br />TON
<br />$80.00
<br />$41,600,00
<br />$86.00
<br />$44,720,00
<br />$67.00
<br />$34,940,00
<br />15.
<br />Sidewalk, Concrete, 4"
<br />15
<br />SYD
<br />$60.00
<br />$900.00
<br />$100.00
<br />$1,500.00
<br />$153.00
<br />$2,295.00
<br />16.
<br />Cohcrete Curb, 6"
<br />1,096
<br />LFT
<br />$22.00
<br />$24,112.00
<br />$27.00
<br />$29,592,00
<br />$40.00
<br />$43,B40.00
<br />17.
<br />PCGP for Approaches, 6"
<br />68
<br />SYD
<br />$60.00
<br />$4,080.00
<br />$63.00
<br />$4,284.00
<br />$80.00
<br />$5,440.00
<br />18.
<br />Sodding
<br />425
<br />SYD
<br />$6.00
<br />$2,550.00
<br />$8.10
<br />$3,442.50
<br />$12.95
<br />$5,503.75
<br />19.
<br />Mulched Seeding, Type U
<br />160
<br />SYD
<br />$2.00
<br />$320.00
<br />$4.25
<br />$680.00
<br />$12.96
<br />$2,073.60
<br />20.
<br />Tree, Freeman Red Maple, 2.5
<br />3
<br />EACH
<br />$620.03
<br />$1,860.00
<br />$545.00
<br />$1,635.00
<br />$560.00
<br />$1,680.00
<br />21.
<br />Tree, Shumard Oak, 2.5"
<br />11
<br />EACH
<br />$620.00
<br />$6,620.00
<br />$545.00
<br />$5,995.00
<br />$565.00
<br />$6,105.00
<br />22.
<br />Duppster Enclosure
<br />1
<br />LSUM
<br />$2,500.00
<br />$2,500.00
<br />$3,300.00
<br />$3,300.00
<br />$4,900.00
<br />54,900.00
<br />23.
<br />Storm Sewer Pipe, 18", Perforated
<br />339
<br />LFT
<br />$60.00
<br />$20,340.00
<br />$78.00
<br />$26,442.00
<br />$69.00
<br />$23.391.00
<br />24.
<br />Standard Drywall, 1,800 gallon
<br />5
<br />LFT
<br />$4,500.00
<br />$22,500.00
<br />$7,850.00
<br />$39,250.00
<br />$6,600.00
<br />$33,000,00
<br />25.
<br />2" PVC Schedule 80, wth Pull Rope
<br />220
<br />LFT
<br />$10.00
<br />$2,200.On
<br />$4.98
<br />$1,095 60
<br />$4s8
<br />$1,095.60
<br />26.
<br />Service Pont, Parking Lot
<br />1
<br />$2,000.00
<br />$2,000.00
<br />$6,777.00
<br />$6,777.00
<br />$6,777.00
<br />$6,777.00
<br />27.
<br />4-1�7c No.4 Copper Cable
<br />341
<br />$8,00
<br />$2,728.00
<br />$5.80
<br />$1,977.80
<br />$5.80
<br />$1,977.80
<br />28.
<br />2" PVC Schedule 80 for Lighting
<br />341
<br />JAH
<br />$10.00
<br />$3,410.00
<br />$4.80
<br />$1,636.80
<br />$4.80
<br />$1,636.80
<br />29.
<br />Ligt Pole Assembly and Foundation
<br />5
<br />$3,800.00
<br />$19,000.00
<br />$2,058.00
<br />$10,290.00
<br />$2,058.OU
<br />$10,290.00
<br />30.
<br />Micellaneeus Equipment for Lghting
<br />1
<br />$1,000.00
<br />$1,000.00
<br />$1,682.00
<br />$1,682.00
<br />$1,682.00
<br />$1,682.00
<br />31.
<br />Sheet Sign and Post
<br />7
<br />EACH
<br />$460.00
<br />$3,360.00
<br />$179.oD
<br />$1,253.00
<br />$179.00
<br />$1,253.00
<br />32.
<br />Lind, Paint, Solid, White, 4"
<br />1,345
<br />LFT
<br />$1.00
<br />$1,345.00
<br />$0.45
<br />$605.25
<br />$0.30
<br />$403.50
<br />33.
<br />Lind, Paint, Solid, Yellow, 4"
<br />660
<br />LFT
<br />$1.00
<br />$660.00
<br />$0.61
<br />$429.00
<br />$0.30
<br />$198.00
<br />34.
<br />Pavement Message Marking, Paint, ADA Symbol
<br />4
<br />EACH
<br />$300.00
<br />$1,200.00
<br />$32.00
<br />$128.00
<br />$40.00
<br />$160.OD
<br />35.
<br />Pavement Message Marking, Paint, Lane Indication Arrow
<br />3
<br />EACH
<br />$300.00
<br />$900.03
<br />$35.00
<br />$105.OD
<br />$16.00
<br />$48.00
<br />36.
<br />Concrete Curb, Remove
<br />342
<br />LFT
<br />$12.00
<br />$4,104.00
<br />$20.00
<br />$6,840.00
<br />$8.00
<br />$2,736.00
<br />37.
<br />Shrub, Winter Gem B-ond, 24" Ht.
<br />59
<br />1 EACH
<br />$85.00
<br />$5,015.00
<br />$65.00
<br />$3,835.00
<br />$75.00
<br />$4,425.00
<br />To - Base Bid
<br />$323,965.62
<br />$379,986.95
<br />$399,750.00
<br />�a,15w �•ttf
<br />Addendum#1 Acknowledged r- �} tt Yes Yes
<br />I hereby certify that the above truly and accurately
<br />represents i,bids received for this project on July 10, 2018 N0.39"aGi1:332 t7r
<br />i
<br />s„
<br />Chad A. Knip, PIE.
<br />Abonmarche Consultants, Inc
<br />M. Ed