My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6D(1)Proposal_Ignition Park_2010-11-01
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
12-03-10 Packet
>
6D(1)Proposal_Ignition Park_2010-11-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 8:49:20 AM
Creation date
11/30/2010 4:31:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
UTN <br />Community & Economic Development= �_' °,, <br />1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 ♦ Phone 574/235 -9371 ♦ Fax 574/235 -9021 <br />To: Redevelopment Commission <br />From: Geri Hathaway <br />Subject: Ignition Park Proposal for Land Use Planning /Assessment, Visioning & <br />Master Planning, Architectural Design Concepts and Site Work Budgeting <br />Date: November 30, 2010 <br />Economic Development requests your approval of the attached Proposal for Ignition Park Lan Use <br />Planning, Visioning and Master Planning, architectural Design Concept Development and Site Work <br />Budgeting prepared by BSA LifeStructures. <br />It is timely to consider the manner in which Ignition Park should be developed. Innovation Park has <br />met its 1St year goals and there is significant effort by Project Future, Notre Dame and the private <br />sector to identify methods to assist the commercialization of research on the campus of Notre Dame. <br />This should lead to the graduation of Innovation Park tenants to Ignition Park. A Business Asset <br />Inventory is being developed, not only to aid in that commercialization effort, but to also identify the <br />existing regional businesses that can assist and benefit by inclusion in that process. This could lead <br />to growth and expansion of some of those local businesses, again with potential tenancy at Ignition <br />Park. In addition, we are beginning to receive calls from potential tenants, and need to respond very <br />swiftly. <br />It is imperative that we understand how to best develop the physical aspects of Ignition Park in a <br />flexible manner, utilizing the most progressive methods to provide economic, community and <br />ecological benefit. <br />Ignition Park is a Certified Technology Park and it is anticipated that "technology" is a key <br />component. Therefore, in order to ensure cohesive architectural and engineering services is deemed <br />most prudent. BSA LifeStructures, based in Indianapolis, is such a firm. They have an impressive <br />legacy of work and come highly recommended by Doug Marsh and his staff at Notre Dame for their <br />work on the Stinson Remick Hall of Engineering and the Indiana University School of Medicine <br />adjacent to the Notre Dame Campus. <br />This request is only the first of many steps in the actual development of Ignition Park It is our intent <br />to be before you again in the near future with a proposal for the development of a business plan. It is <br />important that these two initiatives progress in tandem because the work from one assists in <br />120310 memo Ignition Park.doc What We Do Today Makes A Difference 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.