My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6D(1) Refurbishment of 2020 S. Main
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
10-15-10 Packet
>
6D(1) Refurbishment of 2020 S. Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 9:49:54 AM
Creation date
10/13/2010 10:30:40 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• rand u rn npUTH BFI <br />/6 <br />U \�C <br />Community & Economic Development <br />1865 <br />1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 <br />To: Redevelopment Commission <br />From: Bill Schalliol, Economic Development Planner <br />Subject: EMI Site Staff Report <br />Professional Service Proposal - EMI Building /Site Restoration Design Services <br />Date: October 12, 2010 <br />This memorandum is a progress report on the current status of the EMI building site at 2020 South <br />Main Street. Over the past several months, the staff has been developing parallel track plans <br />related to site reuse of the EMI property. One reuse plan for the site was a total demolition of the <br />entire site creating a new shovel ready development parcel. The other track was to rehabilitate the <br />existing building to allow for reuse of the existing structure. The following is a brief report on the <br />status of each track and a recommendation for the site with a request for additional professional <br />services. <br />Option 1: Site Demolition /New Shovel Ready Parcel <br />The Board of Public Works opened demolition bids for the site on September 13th. The bids ranged <br />from $176,206.00 to $217,328.00. The bid tab is attached for review. The demolition plan would <br />clear the entire site, replace all perimeter curb & walk, and prepare the site for future reuse. The <br />upside with this option is that the site is cleared and ready for new construction. The downside is <br />that this site is constrained by Main Street and streets to the north and south, it is a narrow parcel <br />and is half a block wide, and because of adjacent use would most likely be used for industrial or <br />heavy commercial uses. At this point, new development on the parcel is uncertain in the near term. <br />Option 2: Site Rehabilitation /Site Reuse <br />A site assessment of the building was completed by Wightman Petrie and it was determined that the <br />structure and foundation of the building was solid, but there were environmental concerns, as well <br />as basic building issues that would need to be addressed before the site could be reused for an <br />industrial use. The building size, especially with the high bay section, appears to be marketable for <br />reuse, but because of the condition of the building and site, much work would need to be done to <br />make the site development ready. An estimate of $459,800 was given to clean and rehab the <br />structure and make associated site improvements to the property. A copy of the budget estimate is <br />attached for review. The upside for reuse is that no new construction is required and an existing <br />structure could be put back into active use at a fairly reasonable cost. The downside is that the <br />building dimensions are fixed and there are costs with the rehab of the structure that might become <br />lost costs for a period of time while the property is on the market. <br />Recommendation <br />At this point, it is staff recommendation to do a hybrid approach to the site. Staff proposes to keep <br />the building and make some minor repairs like sealing the roof and the fagade, cleaning and <br />clearing the interior of the building, basic site demolition of the property to the north and south. <br />What We Do Today Makes A Difference! <br />
The URL can be used to link to this page
Your browser does not support the video tag.