My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6F(2) Resolution No. 2751
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
08-20-10 Packet
>
6F(2) Resolution No. 2751
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2010 9:25:01 AM
Creation date
8/18/2010 9:17:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(~ ~ ~ Z~ <br />- • . SpU7'H BF <br />o ,\\~il;r/~ tie <br />a \~~ „ % <z <br />Community & Economic Development ~~~~"°,~ <br />~' , r~"r- ''-', a <br />J865 <br />1200 County-City Building, 227 West Jefferson, South Bend, Indiana 46601-1830 Phone 574/235-9371 Fax 574/235-9021 <br />To: Redevelopment Commission, Board of Public Work <br />From: Bill Schalliol, Economic Development Planner ~/ <br />Subject: Resolution 2751 and Addendum To Master Agency Agreement <br />Ireland Road Improvements -Fellows-Miami <br />Date: August 16, 2010 <br />Attached to this memorandum is Resolution 2751 and Addendum To Master Agency Agreement for <br />the Ireland Road Improvements -Fellows-Miami Project. Attached to the Addendum is a copy of <br />the professional services proposal from Christopher B. Burke Engineering LTD. to provide project <br />design services for the development of schematic drawings and right-of-way plans for the <br />development of the Ireland Road corridor from Fellows to Miami with focus on the High Street <br />intersection. <br />Over the last several years, the City has made several major infrastructure improvements on the <br />south side like intersection improvements at Ireland & Miami, road reconstruction of Ireland from <br />Michigan west, and reconstruction of Michigan from the Bypass to Chippewa. One section of <br />roadway that has been identified for study is the section of Ireland from Miami to Fellows with study <br />of the intersections of Ireland & High and Ireland & Fellows. A related component to this project is <br />the Erskine Plaza Pond project which will help alleviate flooding and water drainage issues in this <br />corridor. <br />Because of the success of the Erskine Commons site and the overall health of the TIF Allocation <br />Area in the South Side Development Area, funding will be available over a period of years to <br />complete this project and create new development sites, improve infrastructure and circulation <br />within this section of the development area. <br />The next step in the process for this project is to complete survey and schematic drawings and right- <br />of-way plans to assist in the design of infrastructure improvements in this corridor. Staff requests <br />approval of Resolution 2751 and the Addendum To Master Agency Agreement for the Ireland Road <br />Improvements -Fellows-Miami. <br />Whaf We Do Today Makes A Difference! <br />
The URL can be used to link to this page
Your browser does not support the video tag.