My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B(9) Resolution No. 2685
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
06-18-10 Packet
>
6B(9) Resolution No. 2685
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2010 8:52:29 AM
Creation date
6/16/2010 8:46:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />• • ~ "SO~TH g~, <br />iv \\\ 'c,i//// 2~ <br />Community & Economic Development ~~~~s <br />~t ,~_z a~ <br />1200 County-City Building, 227 West Jefferson, South Bend, Indiana 46601-1830 Phone 574/235-9371 Fax 574/235-9021 <br />To: Redevelopment Commission and Board of Public Works <br />From: Bill Schalliol, Economic Development Planner <br />Subject: Commerce-Lincolnway-Sheridan Project <br />Date: June 15, 2010 <br />Attached to this memorandum is Resolution 2685, Resolution 2686 and two Addendums to <br />the Master Agency Agreement between the Redevelopment Commission and the Board of <br />Public Works. The purpose of this staff report is to give an overview of the Commerce- <br />Lincolnway-Sheridan project and the current status of the work in Airport Industrial Parks 1 <br />& 2. <br />In 2003, the City began exploring ways to revitalize the industrial parks surrounding the <br />South Bend Regional Airport. The Airport Industrial Parks 1 and 2 developed southeast of <br />the airport and Parks 3 and 4 northeast of the airport had some vacancy issues, <br />infrastructure improvement needs, and some general coordination. As part of the work plan <br />that was developed, the City undertook several infrastructure projects including the <br />extension of Voorde Drive, intersection improvement of Bendix & Lathrop and Bendix & <br />Voorde. Additionally, there was a plan developed to extend Commerce Drive to Sheridan, <br />improve Sheridan Drive, and coordinate a master drainage plan at a new pond constructed <br />along Sheridan. <br />The two attached Resolutions and the related Addendums relate to the final elements of <br />this project. <br />Resolution 2685 is related to the extension of Commerce Drive into Sheridan. The project <br />has been designed, right of way and property has been acquired and the attached <br />professional services proposal will allow for the services related to the acquisition of three <br />temporary right of way easements for this project. The original project that this <br />Supplemental Agreement No. 3 will amend is originally dated October 10, 2004. The total <br />amount of professional services required in this proposal is $12,675.00. The proposal <br />amount only includes the professional services and does not include the actual cost of the <br />right of way needed to be acquired for this project. <br />Resolution 2686 is related to Sheridan Avenue Improvements and Drainage Improvements <br />at Lincoln Way West. The project has been designed, but the purpose of this proposal is to <br />get the necessary professional services to acquire all permanent and temporary right of way <br />for the project. There are 8 permanent takes and 32 temporary right of way easements that <br />What We Do Today Makes A Difference! <br />
The URL can be used to link to this page
Your browser does not support the video tag.