My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3. Claims
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
02-05-10 Packet
>
3. Claims
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2010 11:09:47 AM
Creation date
2/3/2010 9:19:04 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Claims Explanation of Project <br />submitted <br />REDEVELOPMENT COMMISSION <br />Redevelopment Commission Claims submitted February 5, 2009 for approval & ratification <br />305 FUND SBCDA BOND <br />Holladay Construction Group LLC <br />93,062.00 WNIT Facade Renovation <br />324 AIRPORT AEDA <br />Abonmarche <br />The Blue Waters Group <br />Wightman Petrie <br />Indiana Michigan Power <br />Indiana Michigan Power <br />Wightman Petrie <br />Wightman Petrie <br />Abonmarche <br />Hathaway 2 Inc <br />420 FUND TIF DISTRICT-SBCDA GENERAL <br />DTSB <br />CB Richard <br />Ampco System Parking <br />Schindler <br />Rose Pest Solutions <br />Indiana Michigan Power <br />Phifer Environmental Services, LLC <br />430 FUND SOUTHSIDE DEVELOPMENT TIF AREA #1 <br />Meridian Title Corporation <br />435 FUND DOUGLAS ROAD TIF <br />Selge Construction <br />12,700.00 Mayflower Rd Sanitary Sewer <br />32,557.25 Marketing Srvc for Ignition Pk <br />2,407.50 Demo Former So Bend Iron & Metal <br />51.04 420 S William <br />7.00 501 Wenger St. / Sprk Sys/Johnson Blvd <br />2,590.00 Transpo Site As Needed Environmental Inspection <br />360.00 Ignition Park Environmental Assessment & Demo <br />3,500.00 Prepare Sketch of AEDA Boundary <br />19,372.00 Devise A Strategic Vision 8 Development <br />28,125.00 Beautification Program Streetscape <br />753.50 LaSalle Hotel Management Fee <br />1,927.65 St. Joseph St. Surface / 225 Main St. <br />150.00 LaSalle Hotel Elevator Corporation <br />93.00 Parking Lot Flood Lights <br />219.74 LaSalle Hotel <br />4,125.00 Assumed Fuel Oil Tank Excavation <br />800.00 Study and Design & Construction Related <br />121,683.44 Douglas Rd Added Travel Lanes <br />$ 324,484.12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.