My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.F Status Report
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
01-15-10 Packet
>
6.F Status Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 10:31:36 AM
Creation date
1/12/2010 4:27:07 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
( F <f> <br />SpUTN g <br />o ,pl",i 1'r 71,P'6o <br />Community & Economic Development' <br />1865 <br />1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 <br />To: Redevelopment Commission <br />From: Bill Schalliol, Economic Development Planner <br />Subject: Project Update — Erskine Plaza Pond Project <br />Date: January 11, 2010 <br />In an effort to create development sites on the south side to further the commercial growth, <br />the City of South Bend has become involved in a project to reclaim land currently being <br />used as a retention pond to develop the site for commercial purposes. The Erskine Plaza <br />Pond Project is an outgrowth of development and infrastructure planning that will create a <br />development parcel on Miami Street south of Ireland Road and help to create new access <br />into Erskine Plaza. The project will also improve the stormwater management process in <br />the Ireland -Miami area and will reduce overflow impacts on the existing stormwater network <br />and the Erskine Park Golf Course. <br />The purpose of this report today is to provide the Commission with an overview of the this <br />project and to highlight one of the larger project proposed for the use of South Side TIF <br />funds in 2010. The Erskine Plaza Pond Project originally started out as a concept to <br />remove the two drainage ponds within the Erskine Plaza commercial development to create <br />new development sites and to relocate the stormwater, in a controlled sequence of ponds <br />and structures, through the Erskine Park Golf Course. The economics of the project never <br />worked for the project but the need to create new sites and to resolve drainage issues <br />persists. <br />The proposed Erskine Plaza Pond project consists of removing the existing pond along <br />Miami, reshaping and improving the existing interior pond, and creating a new pond at the <br />southwest corner of Hawbaker and High Streets. Overflow from the pond will still be <br />directed to the stormwater system and the golf course, but the need to divert water should <br />be minimized by the improved pond percolation and design of the systems. The reclaimed <br />pond site will be filled and could become space for two new south side tenants. <br />The only item on the Commission agenda today is a ratification of title searches. A future <br />interlocal agreement between the Commission and the Board of Public Works will be <br />forthcoming for approval. <br />What We Do Today Makes A Difference! <br />
The URL can be used to link to this page
Your browser does not support the video tag.