HomeMy WebLinkAboutChange Order - Rieth Riley - SB One Way to Two Way Conversion Division B 116-0011316 COUNTY -CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND. INDIANA 46601-1830
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
July 26, 2016
Mr. John Yadon
Rieth-Riley Construction Co., Inc.
25200 State Road 23
South Bend, IN 46614
PHONE 574,235-9251
FAX 574/ 235-9171
RE: Change Order No. 3 - South Bend One -Way to Two -Way Conversion, Division B —
Project No. 116-001
Dear Mr. Yadon:
The Board of Public Works, at its meeting held on July 26, 2016, approved the above
referenced Change Order for an increase of $3,822.00, bringing the current contract amount
to $16,388,980.09.
Enclosed is a copy of the Change Order for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
Enclosure
c: Michael Divita, Community Investment
Toy Villa, Engineering
Beth Leonard, Community Investment
Judy Love, Community Investment
GARY A. GILOT DAVID P. RELOs ELIZABETH A. MARADIK JAMEs A. MUELLER THERESE J. DORAU
44
CITY OF SOUTH BEND, INDIANA
DEPARTMENT OF PUBLIC WORKS w
5 ?'
PROJECT CHANGE ORDER
DATE: 7/11 /2016
PROJECT NO: 116-001 DIV B
PROJECT NAME: 116-001 South Bend One-way to Two-way Conversion
CONTRACT DATE: 2/26/2016
CHANGE ORDER NO: 3
SUBJECT OF CHANGE ORDER: PCR #3-Profile Grade Change on Main St from Bronson to South
St due to an AEP Vault assosiated with ASI Cha e Order 13
The original contract sum $ 16,321,642.00
Net change by previously authorized change orders $ 63,516.09
The contract sum prior to this change order $ 16,385,158.09
By this Change Order, the project amount is
The new contract sum including this change order
This Change Order represents a total change of
Total change for entire project
Original contracted completion date/time
Extension of date/time by previous change orders
Date/time extension by this change order
New completion date/time
CONTRACTOR
6'1C tra, t r S,igna ure
�1�//j������
Printed Name and Title
Rieth-Riley Construction CO., INC.
Company Name
25200 State Road 23
Address
South Bend, Indiana, 46614
City, State, Zip
�X Increased
Decreased $ 3,822.00
$ 16,388,980.09
0.02 %
0.41 %
6/1/2017
0 days
6/1 /2017
RECOMMENDED FOR APPROVAL
�c
CONSTRUTION MANAGER
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
Approved Date: 42C16
Gary A. Gnot, President
avid P. Relos,' ember
Elizabeth A Maradik, Member
Change Order No. 13
One- Way to Two -Way Street Conversion
Division B
Project No. 116-001
OWNER: City of South Bend
ENGINEER: American Structurepoint, Inc.
Patrick K. Wooden, P.E.
Professional Engineer No. 10504741
CONTRACTOR: Rieth-Riley Construction
PROJECT: One -Way to Two -Way Street Conversion
Project No. 116-001
SUBJECT: Revised Proposed Profile at Main and Bronson Intersection
ISSUE DATE: June 15, 2016
This Change Order to the Contract document shall supplement, amend, and shall become a part of,
and be incorporated as an Addendum to the Contract.
The following is a summary and description of the revisions to the Contract by this Change Order:
1. Profile Change along Main St. (from sta. 716+26.22 to 720+00.00 Line "MAP') and Bronson
St. (from sta. 72+33.93 to 76+36.58 Line "BIRO").
2. Spot and curb ramp elevation revisions in accordance with proposed profile change
3. Cross section revisions in accordance with proposed profile change
4. Relocated Bike Sign along Michigan St. to be north of Broadway St.
Sheet 1 of 3
Change Order No. 13
One- Way to Two -Way Street Conversion
Division B
Project No. 116-001
The following sections of the Contract Documents are revised as a result of the above changes:
1. Bid/Proposal Form:
Division B:
Subtract-327-CYS-from-Line-ltem-35:-EXCAVATION,-C-OMMON -327 CYS-@ $7..46/CYS-fora
total-ded uetion-of-($-2,-436,Y5r
Add 153 CYS to Line Item 26: BORROW, 153 CYS @ $14.00/CYS for a total addition of
$2,142.00
Add 12 SYS to Line Item 82: SIDEWALK, CONCRETE, 4", 12 SYS @ $34.00/SYS for a total
addition of $480.00
Subtract 12 SYS from Line Item 93: CURB RAMP, CONCRETE, H, -12 SYS @ $140.00/SYS
for a total deduction of ($-1,680.00)
Subtract 27 LIFT to Line Item 100: CURB, CONCRETE, -27 LFT @ $19.00/LFT for a total
deduction of (-$513.00)
NO CHANGE REQUIRED
DRAWINGS:
The following sheets have been revised and are issued as new sheets as a part of this Change Order:
Sheet 2 - Revision Note No. 11 Added
Sheets 49-A & 59-A - Added sheet with new profile along Main Street and Bronson
Street
Sheets 49 & 59 - Deleted Sheets
Sheets 66 - Revised Curb Ramp length details at SE and SW quadrants of Main and
Bronson Intersection. Removed Concrete Curb along the outside of proposed sidewalk
in the NW quadrant.
Sheets 91-1 & 91-2 - Revised Spot and Curb Ramp elevations
Sheets 198-199 & 221-1 - Relocated R3-17 & R3-17aP bike signs
Sheet 231 - Revised Structure Data Rim Elevations
Sheets 240-A, 241-A, 244-A, 245-A, 246-A - Added cross section sheets
Sheets 240, 241, 244-246 - Deleted Sheets
END OF CHANGE ORDER NO. 13
Sheet 2 of 3
Project No.116-001
Change Order No. 13 -
06/15/16
pClHg�
CITY OF SOUTH BEND
J - C
2 a
18n5
PROJECT NAME: One -Way to Two -Way Street Conversion —Division B
PROJECT NUMBER: 116-001
Division B:
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
25
EXEAVA-T-ION-COMMON —
26
BORROW
153
CYS
$14.00
$2,142.00
82
SIDEWALK, CONCRETE, 4"
12
SYS
$34.00
$408.00
93
CURB RAMP, CONCRETE, H
-12
SYS
$140.00
($-1,680.00)
100
CURB, CONCRETE
-27
LFT
$19.00
($-513.00)
39
Compacted Aggregate NO, 53 Base
175
TON
$19.80
$3465.00
$3822.00
This Change Order only addresses the pay items associated with the contract. Time issues will be
resolved at a later date.
OWNER: City of South Bend
Signature
Date
CONTRACTOR: Rieth-Riley Construction
Sig at e
Date
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 07/18/16
Name
Toy Villa
Department
Engineering
BPW Date
07/26/16
Phone Extension
5920
I
Kequired Prior to Submittal to Board
Legal ®
Attorney Name Michael Schmidt
Controller ❑
Controller review is required for all Contracts $5,000.00 or more and
greater than one year in length per the City Purchasing Policy
Purchasing ❑
Check the Appropriate Item Type — Required for All Submissions
❑
Agreement
❑ Contract ❑ Proposal ❑ Addendum
❑
Professional Services
❑ Resolution
❑
Bid Opening
❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑
Quote Opening
❑ Quote Award
®
Change Order No. 3
❑ C/O & PCA No. ❑ PCA
❑
Ease/Encroach.
❑ Traffic Control
F-
Other:
Company or Vendor Name
New Vendor
MBE/WBE Contractor
MBE/WBE Contractor
Requested
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
Required Information
Reith Riley Construction Co., Inc.
❑ Yes ® No ❑ If Yes, Approved by Purchasing
I -I MBE I I WBE
U No ❑ Yes Name of Company
South Bend One Way to Two Way Conversion — Division B
116-001
61
tsona
Approval of Change Order #3
❑ Required Contractor's Certification Form Attached (Non -
Collusion, Non -Discrimination, Non -Debarment, E-Verifv. Iran. etc.
Amount of ® Increase $ 3,822.00
❑ Decrease $
Previous Amount
Current Percent of Change:
New Amount
Total Percent of Change:
Copy
Original
0.02%
$ 16,388,980.09
0.41 %
Michael Divita
Beth Leonard
After Approval