HomeMy WebLinkAboutQuotation Award - North Station FIltration Plant Vessel No 5 Raw Water Stainless Steel Pipe Replacement - Zimmerman1316 COUNTY -CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND. INDIANA 46601-1830
o450U T�8F� ,
4 d ,
W eencx
i865
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
July 12, 2016
Mr. Robert Kelsey
Zimmerman Industrial Piping, Inc.
1117 Clay St.
Mishawaka, IN 46545
PHONE 574/235-9251
FAX 574/235-9171
RE: Quotation Award — North Station Filtration Plant Vessel No. 5 Raw Water Stainless
Steel Pipe Replacement
Dear Mr. Kelsey:
The Board of Public Works at its meeting held on July 12, 2016, awarded the above referenced
quotation to you in unit price amounts not to exceed $31,885.50.
Please forward the following documents in one submittal by July 26, 2016 to my attention
for Board of Public Works approval:
1) One (1) original of the Contract (enclosed); and
2) Certificate of Insurance naming the City of South Bend as an additional
insured
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
c: Matthew Bussell, Water Works
GARY A. GILOT DAVID P. RELOS ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU
QUOTE NAME
FOR QUOTES DUE
SPECIFICATIONS
CITY OF SOUTH BEND
North Station Filtration Plant Vessel #5 raw water SS pipe
replacement
June 281h, 2016
Pursuant to notices given, the undersigned offers Quote(s) to the City of South Bend in accordance with
the following attachment(s) which specify the class or item number or description, quantity, unit, unit price.
"Note:
1. All stainless steel materials must be 316L and all joints are to be argon purged
and fig welded, no solar flux permitted.
2. Backup flanges must be 150# stainless steel lap joint flanges
3. Bolt packs should be plated with 1/8" FF red rubber gaskets
4. All PVC should be SCH 80 CPVC, flanges should be Van Stone Style
Item
No.
Est.
Qty.
Item
Unit Price
Unit Price
Total
1
2
12" 316L SS Sch10 Short Radius
90 degree elbow
$ 352.00
704.00
2
4
12" 316L SS Sch 10 Type A Stub
$ 310.00
1,240.00
Ends
3
4
12" SS 150# Lap Joint Flanges
$ 255.00
1,020.00
4
7
12" Sch 80 CPVC Van Stone
$ 1,265.00
8,855.00
Flanges
5
40"
12" CPVC Sch 80 Pipe
$ 104.00
4,160.00
6
ri
12" CPVC Sch 80 "T
$ 1,725.00
1,725.00
7
12" CPVC Sch 80 "90"
$ 1,392.00
1,392.00
8
7
12" Plated Bolt Packs
$ 44.00
308.00
9
7
FF 1/8" Red Rubber Gasket
$ 18.50
129.50
10
7
12" Plated Retainer Rings for 12"
$ 367.00
2,569.00
CPVC Flanges
11
N/A
Misc. Materials, Glue, Cleaners,
$ 575.00
575.00
Welding Materials etc...
TotLabor, for demolition,
12
N/A
instalal lations, cleanup and disposal
$ 9,208.00
9,208.00
of old piping and other materials
13
N/A
Total Materials
$22,677.50
22,677.50
14
N/A
Total Project Cost
$31,
885.50
31, 885.50
Version 8 - 02/25/14
Quoter (Firm): Zimmerman Industrial Piping, Inc.
Address:
City/State/Zip: Mishawaka, IN 46545
Telephone Number: 574-259-3050 Fax Number: 574-259-1312
BOARD OF PUBLIGJiVO S
Gary A. Gilot, President
By / i�/G✓�
(Signatur
Robert Kelsey
(Printed Name)
President
(Title)
1::41, U k
Elizabe M. Maraadik,/Member
Therese e
r Yl
'AITEST: Linda M. Martin, CIE k
Version 8 — 02/25/14
BOARD OF PUBLIC WORKS
CITY OF SOUTH BEND, INDIANA
PUBLIC WORKS CONTRACT
THIS AGREEMENT, made and entered into this 28th day of June, 2016, by and between,
Zimmerman Industrial Piping, Inc., 117 North Clay, Mishawaka, Indiana 46545, HEREINAFTER
called the "Contractor", and the Board of Public Works herein called the 'Board".
WITNESSETH: That the Contractor covenants and agrees to make the following improvement,
as fully set out in the Notice to Bidders, Standard Specification, Special Provisions, Plans, and Bid
Proposal, all of which are set forth as a part of this Contract, for:
DESCRIPTION: NORTH STATION FILTRATION PLANT VESSEL NO. 5 RAW
WATER STAINLESS STEEL PIPE REPLACEMENT
COMPLETION DATE: SEE SPECIFICATIONS
AMOUNT: UNIT PRICING; NTE $31,885.50
FUNDING: WATER WORKS OPERATING
The total bid for this service were those prices as received and accepted by the Board on the 28th
of June, 2016.
The Contractor further agrees to notify the Engineer when this improvement is completed. This
notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final
acceptance of the improvement by the Engineer, the Contractors final estimate will be presented
to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of
a Waiver of Lien.
BOARD OF PUBLIC WORKS
. :r �-, - -
Gary A. Gild, President Elizabe A. Mazadik, Member
David P. Relos, Mem er Ja es A. Mueller, Member
'oe / ortc�—
Therese J. Dorau, ember Attest: Linda M. Martin,
Clerk
ZIMMERMAN INDUSTRIAL
PIPING, INC.
Printed Name
Signature
CERTIFICATION (To be completed if Contractor is a Corporation)
I, certify that I am Secretary of the Corporation named as
Contractor herein; that who signed this Agreement on behalf of the Contractor
was then of said Corporation; that said agreement was duly signed for and in
behalf of said Corporation by authority of its governing body, and is within the scope of its
corporate powers.
Secretary Corporate Seal
July 5, 2016
MEMORANDUM
From: Matthew L. Bussell, Director of Water Treatment
To: Board of Public Works
Subj: Quote Award Stainless Steel Piping Replacement at North Station Filtration Plant
On June 28, 2016 the Board of Public Works opened quotes for the above mentioned project. There
were a total of three solicitations for quotes and only one vendor submitted a formal quote. Based on
the fact that Zimmerman Industrial Piping, Inc. was the only responsive quoter and that they were also
the low quoter in the informal quoting process, I am requesting that the Board of Public Works award
this project to Zimmerman Industrial Piping, Inc. for the quoted amount of $31,885.50. Neither H&G
Services nor Centerline Mechanical could or were willing to meet the specification.
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 6/29/16
Name
Bussell, Matthew
Department
Utilities/Water Works
BPW Date
7/12/2016
Phone Extension
5670
I Required Prior to Submittal to Board
Legal ® Attorney Name Michael Schmidt
Controller ❑ Controller review is required for all Contracts $5,000.00 or more and
greater than one year in length per the City Purchasing Policy
Purchasing ❑
Check the Appropriate Item Type — Required for All Submissions
❑ Agreement ❑ Contract ❑ Proposal ❑ Addendum
❑ Professional Services ❑ Resolution
❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
Quote Opening ® Quote Award
❑ Change Order No. ❑ C/O & PCA No. ❑ PCA
❑ Ease/Encroach. ❑ Traffic Control
F1 Other:
Company or Vendor Name
Zimmerman
Information
New Vendor ❑ Yes ® No ❑ If Yes, Approved by Purchasing
MBE/WBE Contractor ❑ MBE ❑ WBE
MBE/WBE Contractor Requested ® No ❑ Yes Name of Company
North Station Filtration Plant Vessel #5 Raw Water SS pipe
Project Name replacement
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
Water Works Operating Fund
620.0640.602.36.05 (Labor);620.0640.604.23.10 (Materials)
Labor $9,208.00, Materials $22,677.50, Total $31,885.50
Required Contractor's Certification Form Attached (Non-
usion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.
ired For Change Orders
Amount of H Increase $
❑ Decrease $
Previous Amount $
Current Percent of Change: %
New Amount $
Total Percent of Change: %
Copy
Original
®
❑
®
❑
❑
0
Dispersal After Approval
Matthew Bussell
Kim I