Loading...
HomeMy WebLinkAboutQuotation Award - North Station FIltration Plant Vessel No 5 Raw Water Stainless Steel Pipe Replacement - Zimmerman1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND. INDIANA 46601-1830 o450U T�8F� , 4 d , W eencx i865 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS July 12, 2016 Mr. Robert Kelsey Zimmerman Industrial Piping, Inc. 1117 Clay St. Mishawaka, IN 46545 PHONE 574/235-9251 FAX 574/235-9171 RE: Quotation Award — North Station Filtration Plant Vessel No. 5 Raw Water Stainless Steel Pipe Replacement Dear Mr. Kelsey: The Board of Public Works at its meeting held on July 12, 2016, awarded the above referenced quotation to you in unit price amounts not to exceed $31,885.50. Please forward the following documents in one submittal by July 26, 2016 to my attention for Board of Public Works approval: 1) One (1) original of the Contract (enclosed); and 2) Certificate of Insurance naming the City of South Bend as an additional insured If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk c: Matthew Bussell, Water Works GARY A. GILOT DAVID P. RELOS ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU QUOTE NAME FOR QUOTES DUE SPECIFICATIONS CITY OF SOUTH BEND North Station Filtration Plant Vessel #5 raw water SS pipe replacement June 281h, 2016 Pursuant to notices given, the undersigned offers Quote(s) to the City of South Bend in accordance with the following attachment(s) which specify the class or item number or description, quantity, unit, unit price. "Note: 1. All stainless steel materials must be 316L and all joints are to be argon purged and fig welded, no solar flux permitted. 2. Backup flanges must be 150# stainless steel lap joint flanges 3. Bolt packs should be plated with 1/8" FF red rubber gaskets 4. All PVC should be SCH 80 CPVC, flanges should be Van Stone Style Item No. Est. Qty. Item Unit Price Unit Price Total 1 2 12" 316L SS Sch10 Short Radius 90 degree elbow $ 352.00 704.00 2 4 12" 316L SS Sch 10 Type A Stub $ 310.00 1,240.00 Ends 3 4 12" SS 150# Lap Joint Flanges $ 255.00 1,020.00 4 7 12" Sch 80 CPVC Van Stone $ 1,265.00 8,855.00 Flanges 5 40" 12" CPVC Sch 80 Pipe $ 104.00 4,160.00 6 ri 12" CPVC Sch 80 "T $ 1,725.00 1,725.00 7 12" CPVC Sch 80 "90" $ 1,392.00 1,392.00 8 7 12" Plated Bolt Packs $ 44.00 308.00 9 7 FF 1/8" Red Rubber Gasket $ 18.50 129.50 10 7 12" Plated Retainer Rings for 12" $ 367.00 2,569.00 CPVC Flanges 11 N/A Misc. Materials, Glue, Cleaners, $ 575.00 575.00 Welding Materials etc... TotLabor, for demolition, 12 N/A instalal lations, cleanup and disposal $ 9,208.00 9,208.00 of old piping and other materials 13 N/A Total Materials $22,677.50 22,677.50 14 N/A Total Project Cost $31, 885.50 31, 885.50 Version 8 - 02/25/14 Quoter (Firm): Zimmerman Industrial Piping, Inc. Address: City/State/Zip: Mishawaka, IN 46545 Telephone Number: 574-259-3050 Fax Number: 574-259-1312 BOARD OF PUBLIGJiVO S Gary A. Gilot, President By / i�/G✓� (Signatur Robert Kelsey (Printed Name) President (Title) 1::41, U k Elizabe M. Maraadik,/Member Therese e r Yl 'AITEST: Linda M. Martin, CIE k Version 8 — 02/25/14 BOARD OF PUBLIC WORKS CITY OF SOUTH BEND, INDIANA PUBLIC WORKS CONTRACT THIS AGREEMENT, made and entered into this 28th day of June, 2016, by and between, Zimmerman Industrial Piping, Inc., 117 North Clay, Mishawaka, Indiana 46545, HEREINAFTER called the "Contractor", and the Board of Public Works herein called the 'Board". WITNESSETH: That the Contractor covenants and agrees to make the following improvement, as fully set out in the Notice to Bidders, Standard Specification, Special Provisions, Plans, and Bid Proposal, all of which are set forth as a part of this Contract, for: DESCRIPTION: NORTH STATION FILTRATION PLANT VESSEL NO. 5 RAW WATER STAINLESS STEEL PIPE REPLACEMENT COMPLETION DATE: SEE SPECIFICATIONS AMOUNT: UNIT PRICING; NTE $31,885.50 FUNDING: WATER WORKS OPERATING The total bid for this service were those prices as received and accepted by the Board on the 28th of June, 2016. The Contractor further agrees to notify the Engineer when this improvement is completed. This notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final acceptance of the improvement by the Engineer, the Contractors final estimate will be presented to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of a Waiver of Lien. BOARD OF PUBLIC WORKS . :r �-, - - Gary A. Gild, President Elizabe A. Mazadik, Member David P. Relos, Mem er Ja es A. Mueller, Member 'oe / ortc�— Therese J. Dorau, ember Attest: Linda M. Martin, Clerk ZIMMERMAN INDUSTRIAL PIPING, INC. Printed Name Signature CERTIFICATION (To be completed if Contractor is a Corporation) I, certify that I am Secretary of the Corporation named as Contractor herein; that who signed this Agreement on behalf of the Contractor was then of said Corporation; that said agreement was duly signed for and in behalf of said Corporation by authority of its governing body, and is within the scope of its corporate powers. Secretary Corporate Seal July 5, 2016 MEMORANDUM From: Matthew L. Bussell, Director of Water Treatment To: Board of Public Works Subj: Quote Award Stainless Steel Piping Replacement at North Station Filtration Plant On June 28, 2016 the Board of Public Works opened quotes for the above mentioned project. There were a total of three solicitations for quotes and only one vendor submitted a formal quote. Based on the fact that Zimmerman Industrial Piping, Inc. was the only responsive quoter and that they were also the low quoter in the informal quoting process, I am requesting that the Board of Public Works award this project to Zimmerman Industrial Piping, Inc. for the quoted amount of $31,885.50. Neither H&G Services nor Centerline Mechanical could or were willing to meet the specification. BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 6/29/16 Name Bussell, Matthew Department Utilities/Water Works BPW Date 7/12/2016 Phone Extension 5670 I Required Prior to Submittal to Board Legal ® Attorney Name Michael Schmidt Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ Check the Appropriate Item Type — Required for All Submissions ❑ Agreement ❑ Contract ❑ Proposal ❑ Addendum ❑ Professional Services ❑ Resolution ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet Quote Opening ® Quote Award ❑ Change Order No. ❑ C/O & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control F1 Other: Company or Vendor Name Zimmerman Information New Vendor ❑ Yes ® No ❑ If Yes, Approved by Purchasing MBE/WBE Contractor ❑ MBE ❑ WBE MBE/WBE Contractor Requested ® No ❑ Yes Name of Company North Station Filtration Plant Vessel #5 Raw Water SS pipe Project Name replacement Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Water Works Operating Fund 620.0640.602.36.05 (Labor);620.0640.604.23.10 (Materials) Labor $9,208.00, Materials $22,677.50, Total $31,885.50 Required Contractor's Certification Form Attached (Non- usion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc. ired For Change Orders Amount of H Increase $ ❑ Decrease $ Previous Amount $ Current Percent of Change: % New Amount $ Total Percent of Change: % Copy Original ® ❑ ® ❑ ❑ 0 Dispersal After Approval Matthew Bussell Kim I