Loading...
HomeMy WebLinkAboutProfessional Services Agreement - MWH America - CSO LTCP Reassessment Phase 1C1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND. INDIANA 46601-1830 Mr. Joe Schillaci MWH America, Inc. Suite 301 350 N. Orleans Street Chicago, IL 60654 .oVT17,0 04 .tea U O" Truce ;•' , l a 1865 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS July 12, 2016 PHONE 574/235-9251 FAX 574/235-9171 RE: Professional Services Agreement — CSO LTCP Reassessment, Phase 1 C Dear Mr. Schillaci: The Board of Public Works, at its meeting held on July 12, 2016, approved the above referenced professional services agreement in the not to exceed amount of $430,000.00. Enclosed please find a copy of the agreement for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GILOT DAVID P. RELOS ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU AMENDMENT TO AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES The Board of Public Works, City of South Bend, Indiana ("Owner") and MWH Americas, Inc. ("Engineer") entered into an agreement for professional services ("Agreement") effective February 10, 2015 for services relating to: South Bend Combined Sewer Overflow (CSO) Long Tenn Control Plan (LTCP) Integrated Planning Reevaluation ("Project"). The Agreement is hereby amended to include additional services as described below. These additional services comprise Phase 1 C of the Project as described in this Amendment. This Amendment is effective as of 1Z , 2v/1, ("Effective Date"). Phase 1C Introduction and Overview Over the past 15 months, the City's Consultant Team has completed the Phase lA/lB reevaluation of the 2012 Long Term Control Plan incorporated into the City's current CSO consent decree. The work done to date has resulted in an update of estimated costs for construction of the remaining LTCP projects, refinement of the collection system and water quality models used to analyze potential management strategies, identification of cost saving conceptual alternatives to the current LTCP, and formulation of an initial strategy for modifications or wholesale changes to the City's current LTCP that would achieve the goals of this effort at a reduced cost to South Bend. The goals of the proposed Phase 1 C Scope of Work are to: • refine the City's collection system model to further improve its ability to accurately predict system performance and support optimization analyses; • investigate the potential for enhancement of the collection system model through integration of Cognitive Hydraulic Response System features and linkages to the St. Joseph River water quality model; • develop cost functions for the construction of various LTCP alternatives that can be incorporated into the model being used for system optimization; • formulate and implement an optimization analysis of LTCP alternatives to provide insight into the potential for further reduction of program costs through refinements to the LTCP or changes in the target level of service; and South Bend LTCP Reevaluation - Phase 1C Amendment Page 1 Revised 06/29/2016 The Consultant Team will continue to coordinate with the CSO Citizens Advisory Committee and the City's Legal Team during Phase I C to solicit feedback and suggestions from representatives of the community. It is also possible that a meeting with USEPA will be conducted during Phase I to update agency representatives on the City's progress and current efforts to improve the LTCP. Phase 1 C services will be provided by the existing project team consisting of- MWH Americas, Inc. • American Structurepoint • EmNet, LLC • LimnoTech MWH Americas, Inc. is the prime consultant to the Board of Public Works under this agreement. However, given the specialized nature of elements of the Phase 1 C scope of services, subcontract firms will have lead responsibility for the performance and completion of certain scope tasks. Phase 1 C services are expected to begin in July 2016 and be completed by the end of October 2016. Detailed Scope of Work— Phase 1C Task 7 Project Administration and Quality Management (Lead Firm: MWH) MWH will maintain established project administration practices through the 4 month duration of the Phase 1 C effort. Specific practices include: 1. Project Management -For the projected 4-month Phase 1C project duration, MWH will provide coordination of its own staff and subconsultants, and track the engineering services budget. MWH will prepare monthly invoices detailing project progress submitted in an agreed upon form. 2. Project Coordination - MWH will attend up to four progress and review coordination meetings during the Phase 1 C South Bend LTCP effort to review project progress and to obtain direction on matters requiring decisions by the City. These progress meetings will address the technical aspects of the work and results of the investigations, analyses, and conceptual design efforts at various phases of completion. Meetings will be conducted over the phone or scheduled coincidentally with other workshops/meetings. South Bend LTCP Reevaluation - Phase IC Amendment Page 2 Revised 06/29/2016 Quality Control - Quality Control (QC) procedures will be employed in order to maintain work product quality. These procedures will address the use of quality control reviews, engineering and calculations checking, conceptual design checking, construction and operation issues, and other measures necessary to maintain a consistent, complete, high quality and compatible plan. A formal QC review will be conducted on key technical memorandum. City staff will be invited to contribute to quality reviews. Task 8 — Coordination Meeting with Advisory Committee (Lead Firm: MWH with local support from ASI) Ongoing communication and coordination with the CSO Advisory Committee established by the City during Phase lA/113 of the reevaluation effort is important to the development of local support for ongoing CSO control efforts. During Phase I of the effort, MWH will: 1. Communicate with City staff to develop an agenda for and schedule a progress meeting with the CSO Advisory Committee 2. Prepare advance materials and conduct a meeting with the CSO Advisory Committee to discuss updated financial data pertaining to LTCP alternatives or wholesale changes and solicit input regarding the City's strategy for ongoing refinement and implementation of the LTCP. 3. Document key discussions from the Advisory Committee meeting in the form of written meeting notes. Task 8 Deliverables • Meeting Agenda, Presentation Materials, and Notes —Phase IC Advisory Committee Meeting. MWH will be responsible for production of this deliverable. Task 9 — Collection System Model Refinement (Lead Firm: MWH) Modifications made to the City's previous collection system model during the Phase IA/1B Reevaluation effort significantly improved the representation of the existing service area and infrastructure and resulted in improved agreement between model results and observed conditions. This task will involve additional model refinement as required to further improve the model's ability to predict system performance and prepare for use of the model for an optimization analysis. Specific refinement efforts will include: South Bend LTCP Reevaluation - Phase 1C Amendment Page 3 Revised 06/29/2016 1. Refinement of model components with greatest potential to improve calibration against observed flow data (e.g., CSONet control strategies, combined/separated tributary areas; CSO configurations and weir elevations; inflows from Bowman Creek, Clyde Creek; stormwater basin configurations, etc.). 2. Validation of typical year output against results generated using the CHRS node time series. 3. Use the refined collection system model to perform simulations of the following scenarios: a. Existing conditions (2015) model run for typical year rainfall b. Current (2012) LTCP Phase 1 and Phase 2 model run for typical year rainfall c. Current (2012) LTCP Phase 1 and Leeper Tank model run for typical year rainfall 4. Prepare a technical memorandum that provides a summary of results from the refined collection system model simulations listed under Task 10.3. Task 9 Deliverables • Technical Memorandum - Updated Collection System Model and Baseline Simulation Documentation. MHW will be responsible for production of this deliverable. Task 9 Exclusions • No field investigations (sewer inspections, surveys, flow monitoring) are included in this scope. Should such investigations be determined to be necessary, MWH will notify the City so that a plan for their performance can be developed. Task 10 Optimization Analysis Planning (Lead Firm: EmNet) Optimization technology allows for the efficient analysis of the performance of a large number of potential combinations of improvement options. The improved model of the South Bend collection system together with enhanced understanding of the limitations and costs of alternative measures can be used as inputs to identify potential improvement plans that cost effectively achieve the City's goals. EmNet will lead a collaborative discussion with project team members to decide upon the framework to be used for the optimization and confirm the inputs required to support the analysis. Potential scenarios include the optimization of improvement alternatives to achieve either an established water quality goal or an established goal for the number of overflows in a typical year. EmNet will prepare a technical memorandum to document the adopted optimization plan. South Bend LTCP Reevaluation - Phase 1C Amendment Page 4 Revised 06/29/2016 Task 10 Deliverables • Technical Memorandum — Adopted Optimization Plan. EmNet will be responsible for production of this deliverable. Task 11 CHRS Integration (Lead Firm: EmNet) EmNet will build upon the previous work done during Phase lA/1B to further develop and integrate Cognitive Hydraulic Response System nodes into the updated South Bend collection system model developed during Task 10. EmNet will use the updated model from Task 9 along with selected CHRS nodes to generate time series output for the typical year rainfall under existing conditions, and to facilitate use of the updated model for the optimization analysis. Task 11 Deliverables There are no specific deliverables from this task. The updated collection system model with the CHRS nodes integrated will be used as the basis for the optimization analysis described under Task 15. Task 12 Water Quality Analysis Integration (Lead Firms: EmNet, LimnoTech) Decisions regarding the effectiveness of potential refinements or wholesale changes to the South Bend LTCP will depend on results from simulations of meeting water quality goals for the St. Joseph River. Supplemental water quality modeling results are needed to quantify the level achieved by a range of CSO management options, including different levels of control. LimnoTech, working with EmNet will perform tasks to update the current water quality model of the St. Joseph River and provide for the linked analysis of water quality conditions with the OptiS WMM simulations proposed. Specific activities will include: 1. Obtaining 2015 river water quality sampling data from the Cities of South Bend and Elkhart, update the water quality database and update the data analysis section of the water quality model calibration technical memo developed under Phase IA. 2. Performing sensitivity analysis on the duration of the CSO discharge from the South Bend CSOs and the Elkhart CSOs in the calibration model for the time period of 2012- 2013, and update the sensitivity analysis section of the water quality model calibration technical memo developed under Phase IA. 3. Following the completion of the Collection System Model Refinement by MWH under Task 10, take the typical year output from the updated collection system model and South Bend LTCP Reevaluation - Phase 1C Amendment Page 5 Revised 06/29/2016 prepare a new Baseline WQ run, and update the Baseline Water Quality Scenario Technical Memo developed under Phase IA. 4. Develop a water quality model optimization integration tool to support linkage between the SWMM collection system model and the BLTM Water Quality Model for use in the OptiS WMM optimization tool developed by EmNet that will allow for an integrated analysis of improvement alternatives. This will involve developing a software "wrapper" that allows for the ready transfer of CSO hydrograph data from the S WMM collection system model into the BLTM water quality model, and exporting water quality results to OptiS WMM. 5. Prepare a Technical Memorandum to document the water quality model optimization integration tool. Task 12 Deliverables • Updated Technical Memoranda — Water Quality Model Calibration & Water Quality Model 2015 Baseline Water Quality Scenario • Technical Memorandum — St. Joseph River Water Quality Model Integration for optimization analysis of improvement options. LimnoTech will be responsible for production of this deliverable. Task 12 Assumptions • South Bend will provide their St. Joseph River and tributary (if available) monitoring data from 2015. • South Bend will assist the consultant with obtaining St. Joseph River and tributary monitoring data from Elkhart and Mishawaka, if needed. • The cities of Elkhart and Mishawaka will provide their water quality monitoring data within four weeks of notice to proceed. • Hourly volumes from collection system hydraulic model will be provided to the water quality modeling consultant in a spreadsheet matrix for each of the LTCP scenarios. • The Elkhart and Mishawaka LTCPs are appropriate representation of future CSO loads from these communities. • The year 1992 will continue to serve as the typical year. • The water quality model optimization integration tool will be developed to run in a Microsoft Windows Environment using the .Net platform and Access database. • The water quality model optimization integration tool will allow for variation in the CSO hydrographs, and the event mean concentration of E. coli in the CSO effluent. All of the other inputs are expected to remain constant in the optimization runs. South Bend LTCP Reevaluation - Phase 1C Amendment Page 6 Revised 06/29/2016 • The output from the water quality model optimization integration tool will be the number of hours of water quality compliance at up to three (3) locations selected during the Optimization Planning task (Task 11). Task 12 Exclusions • No water quality sampling or testing is included in this scope. Task 13 Development of Optimization Cost Functions (Lead Firm: American Structurepoint) Under this task, cost functions will be developed to provide a reliable basis for the evaluation of the relative cost and benefits of a range of improvements within the proposed optimization analysis. Final decisions regarding the type and size of improvements for which cost functions are to be developed will be confirmed as part of the optimization planning effort. It is expected that cost functions will be required for the following type of improvements: • Sewer separation ($/linear foot and diameter) • Green stormwater infrastructure ($/square foot of new GSI) • Trunk Sewer Inflow/Infiltration Removal ($/linear foot of sewer rehabilitation) • CSONet Monitoring and Control Improvements ($/additional monitoring/control site) • Consolidation combined sewer construction ($/linear foot and diameter) • Retention Treatment Basin ($/MG of storage volume plus a base allowance for site disturbance) • CSO Storage Tunnel ($/linear foot and diameter plus a base allowance for mobilization) • CSO Disinfection ($/mgd of peak disinfection capacity plus a base allowance for site development) Cost functions will be developed to provide AACE Class 5 level estimates of probable construction costs for the various type of improvements to be considered in the optimization analysis. Major cost drivers with the potential to significantly impact the cost of various improvements will be identified. Task 13 Deliverables • Technical Memorandum — CSO Improvement Cost Functions. ASI will be responsible for production of deliverable. South Bend LTCP Reevaluation - Phase 1C Amendment Page 7 Revised 06/29/2016 Task 13 Exclusions • Cost functions will be based on analyses of hypothetical improvement projects and available cost data for other types of projects. Cost functions will be limited in their ability to consider site -specific factors that could impact the cost of improvements at any specific site. Task 14 Alternative Concept and Level of Control Optimization Analysis (Lead Firm: EmNet) Outputs from Tasks 10-14 will serve as inputs for a comprehensive optimization analysis of the South Bend combined sewer system. Specific tasks required for the optimization analysis include: 1. Use of outputs from the model refinement and cost function development tasks as the basis for evaluating integrated improvement alternatives to achieve the current consent decree level of control. This optimization will be structured to determine the least cost option for meeting the current level of control of 4 events per year in a typical year. 2. Use of outputs from the model refinement and cost function development tasks as the basis for evaluating improvement options and costs with three potential levels of control: no disinfection, disinfection for the four overflows in a typical year (with 30 minutes detention), and disinfection following the Michigan Standards (10yr-lhr with 30 minutes detention). This analysis will be structured to attempt to minimize the cost of the integrated solution while maintaining each of the three different levels of control. 3. Performance of a level of control analysis using three models that incorporate an integrated set of solutions and specific level of control requirements. The level of control tool will scale each element of the integrated solution to find cost effective combinations of technologies that achieve the specific level of control defined. 4. Prepare technical memorandum documenting the results of the optimization analysis. Task 14 Deliverables • Technical Memorandum — Based on the results of this task, EmNet will prepare a technical report documenting the approach used for the optimization analysis, the sources of key data used in the analysis, and descriptions of the highest ranking options found to achieve the target levels of service. EmNet will be responsible for production of this deliverable. South Bend LTCP Reevaluation - Phase 1C Amendment Page 8 Revised 06/29/2016 Compensation for Phase 1C Services Compensation to the Engineer for the Phase 1 C services defined in this Amendment will be on a lump sum basis. The lump sum amount for Phase IC services is $430,000. The portion of the compensation amount billed monthly for Engineer's services will be based upon Engineer's estimate of the percentage of the total services actually completed during the billing period. Table 1 provides a breakdown of the basis for the lump sum amount by task. South Bend LTCP Reevaluation - Phase 1C Amendment Page 9 Revised 06/29/2016 A 601) k| Qu - a § ° _ C, _ CD 40 / \ m cq _ 3§ " rcq s u C, CD 8 a ° (A_ $ \ a \� \ ^ SO)IS _ ° @ a ° C� IT ° CD \ cq ƒ \ / \ / \| Q _ / u a| / f � en $ § / en IT �) - - � ■ 5 Q k ) a ƒ « \ ) ) ) A u } ƒ } } / » ¥ IN WITNESS WHEREOF, the parties hereto have executed this Amendment, the effective date of which is indicated on page 1. Owner: City of South Bend, Indiana Board of PublWorks By: Title: Gary A. Gilot,esident By: 1>W I Title: Elizabeth A. Maradik, Member By: h -tom Title: James A. Mueller, Member By: Title: David P. Relos, Meer By: Title: Therese J. Do , Member Attest:C�/l Title: dU M. Martin, Cler Date: -(ILI"./ )-o /(e Address for giving notices: 227 West Jefferson Boulevard South Bend, Indiana 46601 Designated Representative: Kieran Fahey Title: Director, Long Term Control Plan Phone Number: (574) 235-5993 Facsimile Number: (574) 235-9171 E-Mail Address: kfahevna southbendin.gov Engineer: MWH Americas, Inc. By:4Schil Gam/ Title: i, Vice President Date: July 1.2016 Engineer License or Firm's Certificate No. 198202-251 State of: Indiana Address for giving notices: 350 N. Orleans Street, Suite 1301 Chicago, IL 60654 Designated Representative: T. Joe Johnson, PE, PMP Title: Principal Project Manager Phone Number: (312) 831-3117 Facsimile Number: (312)831-3999 E-Mail Address: ioe.johnson(a mwhglobal.com South Bend LTCP Reevaluation - Phase 1C Amendment Page 11 Revised 06/29/2016