HomeMy WebLinkAbout08/07/06 Board of Public Works Special Meeting MinutesSPECIAL MEETING AUGUST 7, 2006 l rJ ~J
A special meeting of the Board of Public Works was convened at 9:33 a.m. on Monday,
August 7, 2006, by Board Member Donald E. Inks, with Board Member Carl P. Littrell
present. Board President Gary A. Gilot was not present. Also present was Board
Attorney Thomas Bodnar.
AGENDA ITEMS ADDED/REMOVED
- Add -Quotation Award -Morris Performing Arts Center - AIley Drainage
- Remove -Request to Advertise -Stabilization of CSO No. 6
' Upon a motion made by Mr. Littrell, seconded by Mr. Inks, and; carried, the above items
were approved to be added/removed from the agenda.
OPENING OF BIDS -SOUTH OLIVE STREET -SANITARY SEWER REPAIR
PROJECT - PROJECT N0.106-054 (2006 SEWER BOND)
This was the date set for receiving and opening of sealed bids for the above referred to
proaect. The Clerk tendered proofs of publication of Notice' in the South Bend Tribune
end the Tri-County News, which were found to be sufficient. The following bids were
opened and publicly read:
SELGE CONSTRUCTION COMPANY INC.
2833 South 11 Street
Niles, Michigan 49120 •
Bid was signed by: Mr. James Boyles
Non-Collusion Affidavit was in order
Non-Discrimination commitment form was completed
Five percent (5%) Bid Bond was submitted
BID: $808,427.05
' HRP CONSTRUCTION, INC.
5777 Cleveland~:Rbad .
Post Office Box 266
South Bend, Indiana 46624-0266
Bid was signed by: Mr. Paul Fallon
Non-Collusion Affidavit was in order
Non-Discrimination commitment form was completed
Five percent (5%) Bid Bond was submitted
BID: $844,948.00
OSELKA CONSTRUCTION COMPANY
Post Office Box 253
Union Pier, Michigan 49129
Bid was signed by: Mr. David Wolf •
Non-Collusion affidavit was in order
Non-Discrimination commitment form was completed
Five percent (5%) Bid Bond was submitted
BID: $26,222.30
C&E EXCAVATING, INC.
53767 County Road 9 North
Elkhart, Indiana 46514
Bid was signed by: Mr. Thad Bessinger
Non-Collusion Affidavit was in order
Non-Discrimination commitment form was completed
Five percent (5%) Bid Bond was submitted
,.
(~J F3
SPECIAL MEETING
AUGUST 7 2006
BID: $892,149.00
' HERRMAN &°`GOETZ, INC. DBA UNDERGROUND SERVICES
225 South Lafayette Boulevard
South Bend, Indiana 46601
Bid was signed by: Mr. Jeff Wells
Non-Collusion Affidavit was in order
Non-Discrimination commitment form wascompleted
Five percent (5%) Bid Bond was submitted
BID: $786,487.00
Upon a motion made by Mr. Littrell, seconded by Mr. Inks, and carried, the above bids
were referred to the Division of Engineering for review and recommendation.
OPENING OF BIDS -DEMOLITION OF 525 SOUTH MAIN STREET -FORMER
STUDEBAKER MUSEUM - PROJECT. NO: 106-026 (HUD SECTION 108 LOAN
--~.
FiJNDSI
This was the date set for receiving and opening of sealed bids for the above referred to
project. The Clerk tendered proofs of publication of Notice in the South Bend Tribune
end the Tri-County News, which were found to be sufficient. The following bids were
opened and puUlicly read:
RITSCHARD BROS, INC.
1204 West Sample Street
South Bend, Indiana 46619
Bid was signed by: Mr. David Reinhold
Non-Collusion Affidavit was in order
Non-Discrimination commitment form was completed
Five percent (5%) Bid Bond was submitted
BID: Base Bid:` $291,674.00
Alternate Al: $15,000.00
NATIONAL SALVAGE & SERVICE CORPORATION
6755 Old State Road 37 South
Bloomington, Indiana 47401
Bid was signed by: Ms. Catherine Ruf
Non-Collusion Affidavit was in order
Non-Discrimination commitment form was not submitted
Five percent (5%) Bid Bond was submitted
BID: Base Bid: $659,000.00
Alternate Al: $15,000.00
HOMRICH, INC.
200 Matlin Road-<'
Carleton, Michigan 48117
Bid was signed by: Ms. Michael T. Brant
Non-Collusion Affidavit was in order
Non-Discrimination commitment form was coixlpleted
Five percent (5%) Bid Bond was submitted,
BID: Base Bid:.. $318,400.00
Alternate Al: $15,600.00
1
1
1
,.
~' S'7
SPECIAL MEETING ~ •AUGUST 7, 2006
C&E EXCAVATING, INC.
53767 County Road 9
Elkhart, Indiana 46514
Bid was signed by: Mr. Robert Cox
Non-Collusion Affidavit was in order
Non-Discrimination commitment form was completed
Five percent (5°~o)''Bid.Bond was submitted
BID: Base Bid: $197,470.00
Alternate Al: $12,528.00
R&R EXCAVATING, INC.
2010 Went Avenue
Mishawka, Indiana 46545
Bid was signed by: Mr. William Loudin
Non-Collusion AffidaviYwas in order
Non-Discrimination commitment form was completed
Five percent (5%) Bid Bond was submitted
BID: Base Bid: $260,000.00
Alternate Al: $13,500.00
Mr. Bodnar noted that National Salvage & Service Corporation did not submit their Non-
Discrimination commitment form. A representative from National Salvage & Service
Corporation was present and acknowledged that this form would be submitted to the
Board within 74 hours for their bid to be considered (document received). Upon a
motion made by Mr. Littrell, seconded by Mr. Inks,•and carried, the above bids were
referred to the Division of Engineering for review and recommendation.
OPEN/AWARD OF QUOTATION -DEMOLITION OF 1010 LINCOLNWAY EAST -
POIZMERFIRE STATION - rROJECT NO. 105-OE2 (GENERAL FUND
This was the date set for the receiving and opening of sealed Quotations for the above
project. The following Quotations were opened and read:
JACKSON TRUCKING & EXCAVATING
430 East LaSalle Avenue
South Bend, Indiana 46601
Quotation was submitted by Mr. Harvey Jackson
QUOTATION: $12,500.00
RITSCHARD BROS., INC.
1204 West Sample Street
South Bend, Indiana 46619
Quotation was submitted by Ritschard Bros., Inc.
QUOTATION: $13,877.00
WARNER & SONS, INC.
29099 Old U.S. 33 West
Elkhart, Indian 46515
Quotation was submitted by Mr. Mark Weaver
QUOTATION: $21,730.00
~~~
SPECIAL MEETING
B&J EXCAVATION COMPANY, INC.
1104 West Donald street
South Bend, Indiana 46613
Quotation was submitted by Mr. Darnell O'Neal
'AUGUST 7, 2006
QUOTATION: $18,499.00
-Upon a motion made ~by Mr. Littrell, seconded by Mr. Inks and carried, the above
Quotations were referred to the Division of Engineering for review and recommendation.
Mr. Rob Nichols, City Engineer, advised the Board that upon review of bids received and
opened for the above referred to project, the bid of Jackson Trucking & Excavating, 430
East LaSalle Avenue, South Bend, did not complete the unit prices on the proposal,
which included disposal of hazardous material and is therefore non-responsive. After
reviewing all bids, Mr. Nichols recommends the Board award the Quotation to the lowest
responsive and responsible bidder, Ritschard Bros., Inc., 1204 West Sample Street, South
Bend, in the amount of $13,877.00 .
Therefore, Mr. Littrell made a motion that the quotation of Jackson Trucking &
excavating be rejected due to being non-responsive, and award to the next lowest
responsive and responsible bidder as outlined above. Mr. Inks seconded the motion,
which carried.
OPENING OF QUOTATIONS -BRICK ROAD WATER MAIN EXTENSION
PORTAGE TO GARDEN OAK DRIVE) - PROJECT NO. 106-065 (WATER WORKS
I30ND)
Mr. Inks advised that this was the date set for the receiving and opening of sealed
Quotations for the above project. The following Quotations were opened and read:
RIETI~-RILEY CONSTRUCTION COMPANY, INC.
25200 State Road 23
Post Office Box 1773
South Bend, Indiana 46634
Quotation was submitted by Mr. Todd Gosc
QUOTATION:
No. Description Amount . Unit Cost
1 Full De th Mill (6") 1,806 sys $2.00
2 Hot Mix Asphalt Base (6") 1,806 sys $13.50
3 Hot Mix Asphalt Surface
including Cleaning & Tack 6,667 sys $4.50
4 Aggregate Shoulder (If Needed) 556 sys $9.25
WALSH & KELLY, INC.
24358 State Road 23
South Bend, Indiana 46614
Quotation was submitted by Mr. Nick Relias
QUOTATION:
No. Description Unit Cost Lump Sum
1 Remove 6.5' Wide x 2500' $4.00/SY $7,224.00
Long Approximately 6"
Deep/Ha~kl Off Site
2 Construct a 6" thick Hot Mix $13.50/SY $25,193.70
Asphalt Base Course in Milled
Out Trench
3 Construct a 1 & 1/2" Hot Mix $4.10/SY $25,055.10
Asphalt 70-22 Surface Course
over Entire Road Approximately
1
1
1
SPECIAL MEETING
,.
AUGUST 7, 2006
~'~9
22' Wide (Includes Tack. Coat &
Stri ing)
Lum Sum for Entire Project $57,472.70
BROOKS CONSTRUCTION COMPANY, INC.
625 South Beiger Street
Mishawaka, Indiana 46544
i
1
Quotation was submitted by Mr. Harold Joy
QUOTATION:
No. Description Amount Unit Cost Total
1 Remove Designated Asphalt
Pavement 1805 sy $5.45 $9,837.25
2 Replaee~••; Designated Asphalt
Pavement 1805 sy $15.25 $27,526.25
3 Resurface Designated Asphalt
Pavement 6,667 sy $5.30 $35,335.10
Total $72,698.60
Upon a motion made by Mr. Littrell, seconded. by Mr. Inks -and carried, the above
Quotations were referred to Water Works for review and recommendation.
AWARD BID -KENSINGTON FARMS/CREST MANOR BASIN DRAINAGE AND
STORAGE IMPROVEMENTS - PROJECT NO. 105-OI3 (SEWER BOND)
Mr. Jason Durr, Engineering, advised the Board that on July 17, 2006, bids were received
and opened for the above referred to project. After reviewing those bids, Mr. Durr
recommends that the Board award the contract to Herrman & Goetz dba Underground
Services, 225 South Lafayette Boulevard, South Bend, in the amount of $796,653.33,
which is the base bid: only. Therefore, Mr. Littrell • made a motion that the
recommendation be accepted and the bid be awarded as outlined above. Mr. Inks
seconded the motion, which carried.
AWARD BID - TWO-HUNDRED FORTY-EIGHT (248 MORE OR LESS
FIREFIGHTEF:S PROTECTIVE CLOTHING (EMS CIP 288 AND 2006 CIP)
Chief Luther Taylor, Fire Department, advised the Board that an June 26, 2006, bids
were received and opened for the above referred to project. Chief Taylor expressed his
thanks to the Board and Board Attorney for all the work undertaken to process this bid.
Mr. Tom Bodnar provided memoranda to the Board dated August 4, 2006.
Mr. Bodnar stated there are two companies left in this evaluation, Total Fire Group
(Morning Pride) and Environmental Services Group (Securitex), the lower bidder. Both
were given a chance to submit corrected bids and were requested to provide a sample turn
out gear conforming with those bids. The original bid package required conforming
samples. The samples were timely received. There were 14 exceptions noted in the
Environmental Services Group. Four exceptions were noted in .the Morning Pride
sa~~ple. ,.;,
The most serious of Securitex's shortcomings was the strength of the outer shell material.
"Phis is one of the most important components in the package and contributes directly to
the safety of firefighters.
IC 5-22-16-2 states that the purchasing agent may •consider whether the offerer has
submitted an offer that conforms in all material respebts to the specifications. The
sample submitted is non-conforming in the material respect. The gear does not
adequately protect the firefighters who will wear it, nor with the instructions to the
offerers. For this reason the Securitex bid may be rejected as non responsive.
If Securitex's bid is rejected as non responsive, then the contract should be awarded to the
remaining bidder, which becomes the lowest responsive and responsive. IC 5-22-7-8
authorizes this award.
For the record, while there are four discrepancies between the specifications and the
sample submitted by Morning Pride, one of those, Item 4.0, was a mislabel. The garment
,•
!~Q
SPECIAL MEETING AUGUST 7, 2006
complied with the specifications, only the label was defective. The remaining three
disorepancies do not appear to be material.' The microphone strap, for example, was only
- half the size requested. However, Securitex did not include any microphone strap. There
are -only .seven rather than eight snaps to secure the liner to the underside of the
~caistband, although this was substantial compliance, and Securitex provided only five of
the eight. Finally, the "D" ring (Item 18.6.3) was located in the correct pocket but
incorrectly within the pocket. It is my opinion that none of these discrepancies was a
material variation. To accept the Morning Pride bid while rejecting Securitex's would
still be treating all offers fairly in accordance with IC 5-2~-9-9.
Chief Taylor further stated that the Fire Department met with Environmental Services, to
make them aware of their deficiencies.
(liter reviewing these two (2) bids, Chief Taylor recommends that the Board award the
contract to Total Fire Protection in the amount of $1,462.88 per set, for a total award of
$362,794.24. Therefore, Mr. Littrell made a motion that the bid of Environmental
Services be rejected as non-responsive, and the bid be awarded to Total Fire
Protection/Morning Pride; Post Office Box.136616, .Dayton, Ohio, as outlined above.
Mr.' Inks seconded the motion, which carried.
AWARD BID - HARTER HEIGHTS STORM SEWER SEPARATION -PROJECT
iv_O. 105-012 (SEWER BOND)
Mr. Jason Durf, Engineering, advised the Board that on July 24, 2006, bids were received
and. opened for the above referred to project. After reviewing those bids, Mr. Durr
recommends that the Board award the contract to the lowest responsive and responsible
bidder, HRP Construction, Inc., 5777 Cleveland Road, South Bend, Indiana, in the
amount of $1,396,779.40. Therefore, Mr. Littrell made a motion that the
recommendation be accepted and the bid be awarded as outlined above. Mr: Inks
seconded the motion, which carried.
AWARD BID - VOORDE DRIVE EXTENSION - PROJECT NO. 105-069
(AhDA/TIF)
Mrl Rob Nichols, Engineering, advised the Board that on July 10, 2006, bids were
received and opened, fox'the above referred to project. After reviewing those bids, Mr.
,
Nichols recommends tfi'at the Board award the contract to the lowest responsive and
responsible bidder, R&R Excavating, Inc., 2010 Went Avenue, Mishawaka, Indiana, in
rl~e amount of $1,070,055.70. Therefore, Mr. Inks made a motion that the
recommendation be accepted and the bid be awarded as outlined above. Mr. Littrell
seconded the motion, which carried.
AWARD QUOTATION -MORRIS PERFORMING ARTS CENTER -ALLEY
DRAINAGE IMPROVEMENTS - PROJECT NO. 106-064
Mr. Rob Nichols, Engineering, advised the Board that quotes were received August 4,
?006 and opened for the above referred to project. Mr. Littrell stated this was an
emergency quote due to water intrusion and a safety issue. After reviewing quotations
received, Mr. Nichols recommends the Board award the quotation to Herrman & Goetz,
Inc., dba Underground Services, 225 South Lafayette Boulevard, South Bend, Indiana in
the amount of $15,865.00.
't'herefore, Mr. Littrell,.made a motion that the recommendation be accepted and the bid
b~ awarded as outlined above. Mr. Inks seconded the motion, which carried.
Al'I'ROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS -
1<]~NMORE STREET MODEL BLOCK (FORD STREET TO SAMPLE STREET)
!"CCCLE SHEET - PROJECT NO. 106-038 (CDBG)
In a memorandum to the Board, Mr. Rob Nichols, Engineering, requested permission to
advertise for the receipt of bids for the above referred to project. The Title Sheet for this
hroject was also submitted for approval. Therefore, upon a motion made by Mr. Littrell,
seconded by Mr. Inks, the above request to advertise and the Title Sheet were approved.
1
1
1
261
SP$CIAL MEETING ,.;
AUGUST 7, 2006
PROJECT NO: 106-045 (COIT)
In a memorandum to the Board, Mr. Rob Nichols, requested permission to advertise for
the receipt of bids for the above referred to project. The Title Sheet for this project was
also submitted for approval. Therefore, upon a motion made by Mr. Littrell, seconded by
Mr. Inks, the above request to advertise and the Title Sheet were approved.
APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS-
WESTERN AVENUE STREETSCAPES - ALBERT STREET TO ILLINOIS
STREET/TITLE SHEET -PROJECT NO. 106-046 (COITI
In a memorandum to the Board, Mr. Rob Nichols, requested permission to advertise for
the receipt of bids for the above referred to project. The Title Sheet for this project was
also submitted for approval. Therefore; upon a motion made by Mr. Littrell, seconded by
Nlr.' Inks, the above request to advertise and the Title Sheet were approved.
REMOVE REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS-
STABILIZATION OF CSO NO. 6 OUTFACE/TITLE SHEET -PROJECT NO. 105-054
(2004 SEWERBOND)
This item was removed from the Agenda, as it had already received Board approval on
July 24, 2006.
APPROVAL OF REOUEST TO ADVERTISE FOR THE RECEIPT _OF BIDS
TRAFFIC SIGNALS NETWORK EXPANSIONN -DIVISION "A"/CLEVELAND
ROAD AND DIVISION "B"/AMERITECH DRIVE/TITLE SHEET -PROJECT NO.
106-060 (AEDA TIF)
In a memorandum to the Board, Mr. Rob Nichols, requested permission to advertise for
the receipt of bids for the above referred to project. The Title Sheet for this project was
also submitted for approval. Therefore, upon a motion made by Mr. Inks, seconded by
Mr., Littrell, the above request to advertise and the Title Sheet were approved.
1
1
APPROVAL OF CONTRACTS/AGREEMENTS/PROPOSALS/ADDENDA
"1'he following Contracts/Agreements/Proposals/Addenda were presented to the Board for
<~pproval:
TYPE BUSINESS DESCRIPTION ~ AM'OUNT MOTION/
CARRIED
Construction Walsh & Kelly, 2006 Concrete $174,710.00 Littrell/Inks
Contract Inc. Pavement Repairs
Proposal Dudek Roofing Roofing for Fire Tom
Station No. 7 Bodnar
noted this
project will
be re-
solicited
,. and opened
at Board of
Public
Works
regular
meeting on
' 8/14/06.
Escrow St. Joseph Capital Fire Station No. 2 Inks/Littrell
Agreement Bank/Brown &
Brown General
Contractors, Inc.
Construction Brown & Brown Fire Station No. 2 $2,104,005.00 Littrell/Inks
Contract General
Contractors, Inc.
,.; .
r62
SPECIAL MEETING
AUGUST 7, 2006
APPROVE TITLE SHEET -VILLAS AT IRELAND WOODS
Mr. Gilot advised that the Title Sheet for the above referred to subdivision was being
presented at this time for execution. Upon a motion made by Mr. Littrell, seconded by
Mr. Inks and carried, the above referred to Title Sheet was approved and signed.
ADJOURNMENT
There being no further business to come before the Board, upon a motion made by Mr.
lul<s, seconded by Mr. Littrell and carried, the meeting adjourned at 10:12 a.m.
.. BOARD OR PUBLIC WORKS
Gary A. Gilot, President
Carl P. Littrell, Member
ald E. nks, Member
AT"LEST:
An ela K. acob, Clerk
,.
1
1
1