HomeMy WebLinkAbout05102016 Board of Public Works MeetingAGENDA REVIEW SESSION MAY 5.2016 169
parking in front of their residences even though it is designated residential parking only. He noted
also, the bike lanes stop at Napoleon St., so this gives continuation all the way to Angela Blvd. and
allows for the turn lane to line up. He stated it makes the whole design safer.
No other business came before the Board. Upon a motion by Mr. Gilot, seconded by Ms. Dorau
and carried, the meeting adjourned at 11:21 a.m.
BOARD OF PUBLIC WORKS
GGaryy A, Gilot, President
David 1. Relos, Member
Elizabeth A. Maradik, Member
.1
Therese Doran, Member
James A. Mueller, Member
ATTEST:
7
i da M. Martin, Clerk J
REGULAR MEETING MAY 10 2016
The Regular Meeting of the Board of Public Works was convened at 9:33 a.m. on May 10, 2016, by
Board Member David Relos with Board Members Elizabeth Maradik, James Mueller, and Therese
Doran present. Board President Gary A. Gilot was absent. Also present was Board Attorney
Michael Schmidt.
APPROVE MINUTES OF PREVIOUS MF,ETLNG
Upon a motion made by Ms. Maradik, seconded by Ms. Doran and carried, the Minutes of the
Agenda Review Session, Regular Meeting and Claims Review Meeting of the Board held on April
21, April 26, and May 3, 2016, were approved.
OPENING OF BIDS — CENTURY CENTER CEO SUITES SUITE 17 REMODEL — PROJECT
NO. 116-010 QIOTEL/MOTEL TAXI
This was the date set for receiving and opening of sealed bids for the above referenced project. The
Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-County News,
which were found to be sufficient. The following bids were opened and publicly read:
HOLLADAY CONSTRUCTION GROUP LLC
227 South Main Street, Suite 200
South Bend, IN 46601
Bid was signed by: Al Lusk
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Bid: S203,314.00
DAYS ELECTRICAL
55169 CR 3 North
Elkhart, IN 46514
REGULAR MEETING
MAY 10, 2016 170
Bid was signed by: Robert Routine
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Bid: $24,809.00
Upon a motion made by Ms. Maradik, seconded by Ms. Domu and carried, the above bids were
referred to Engineering and Century Center for review and recommendation.
OPENING OF BIDS — CENTURY CENTER SERVICE COURT IMPROVEMENTS — PROJECT
NO. 116-006 (HOTET /MOTEL TAX)
This was the date set for receiving and opening of sealed bids for the above referenced project. The
Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-County News,
which were found to be sufficient. The following bid was opened and publicly read:
DAYS ELECTRICAL
55169 CR 3 North
Elkhart, IN 46514
Bid was signed by: Robert Routine
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
BASE BID:
Item
No.
Description
Quantity
Unit
TotalAmount
Furnish all labor, services, materials, insurance and
1
equipment for the Project as described in
1
Lump
Special Provisions -Project Description Base
Sum
Bid.
ALTERNATE41
I/em
o
Description
Quantity
Unit
TotalAmoun
In
In lieu of the masonry screen enclosure wall,
I
substitute the metal panel screen enclosure wall as
I
Lump
in Drawing Sheet C2, Detail-7.
Sum
ALTERNATE#2
Item
No.
Description
Quantity
Unit
Total Amount
1
Work as described on Dravnng meet L1,
Lump
Landscape
1
I Sum
ALTERNATE#3
Item
N
Description
Quantity
UnitEmount
1
or c as described on Drawing Sheet C2, Sitc
Lump
Electrical/LighfingImprovements
l
g
.00
ALTERNATE#4
ItemFEElectrical/Li2btin
No.
scription
Quantity
Unit
TotalAmoun
I
ork as escribed on Drawing Sheet C2, Site
Lump
Im ro_vements.
1
cum
REGULAR MEETING MAY 10.2016 171
Upon a motion made by Ms. Maradik, seconded by Ms. Doran and carried, the above bid was
referred to Engineering and Century Center for review and recommendation.
OPENING OF BIDS — TWO (2). MORE OR LESS, 2016 OR NEWER FULL SIZE CARGO
VANS — SPEC W (WASTE WATER AND COMMUNITY INVESTMENT CAPITAL)
This was the date set for receiving. and opening of sealed bids for the above referenced project. The
Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-County News,
which were found to be sufficient. The following bids were opened and publicly read:
THE JORDAN AUTOMOTIVE GROUP
609 East Jefferson Boulevard
Mishawaka, IN 46545
Bid was signed by: Debra Starkweather
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Indiana Local Business Preference Claim submitted
Ten percent (10%) Bid Bond was submitted,
BID:
Description
Year/Make/Model
Unit Price
130" Regular Wheel
2017 Ford Transit 250 Medium Roof
$26,490.00 ea.
Base
Alternate # Description Cost Total
1 Bi-Duel 10 GGE $101,400.00 $10,400.00 ea.
Estimated number of days for delivery from award date. 17-18 Weeks for Transit
add 5 weeks for CNG
D-PATRICK, INC.
200 N. Green River Road
Evansville, IN 47715-8610
Bid was signed by: Jed King
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit. Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Ten percent (10%) Bid Security Check was submitted.
- 10
Description Year/Make/Model Unit Price
Cargo Van 2016 Nissan NV2500 S High Roof $26,712.00
Alternate
#
Description
LBi-Fuel
Cost
Total
1
$NO BID
NO BID
Estimated number of days for delivery from award date.
60 Days
Upon a motion made by Ms. Maradik, seconded by Ms. Doran and carried, the above bids were
referred to Central Services for review and recommendation.
OPENING OF BIDS — ONE (1) OR MORE 2015 OR NEWER, HEAVY DUTY 24'
ARTICULATING AERIAL TOWER — SPEC U (SUBJECT TO TRAFFIC AND LIGHTING
CAPITAL LEASE)
REGULAR MEETING
MAY 10, 2016 172
This was the date set for receiving and opening of sealed bids for the above referenced project. The
Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-County News,
which were found to be sufficient. The following bids were opened and publicly read:
EBY FORD LINCOLN
2714 Elkhart Road
Goshen, IN 46526
Bid was signed by: Eric Eby
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit; Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Indiana Local Business Preference Claim submitted.
Ten percent (10%) Bid Bond was not submitted.
BID:
Description Year/Make/Model Unit Price
2017 Ford F550 with Aerolift $133,165.40
Year Make/Model — Trade In Unit Price
1999 Unit 9429, Ford Platform Truck,
ViN#1FDXF4fiFRXRn`Ja1ue
Alternate #
Description
Cost
Total
I
Tilt steering wheel, cruise control, power windows,
$915.00
$124,050.40
power door locks.
Estimated number of days for delivery from award date. 1 270
MIKE RAISOR FORD INC
2051 Sagamore Pkwy S
Lafayette, IN 47905
Bid was signed by: Ed Nartowicz/Ted Lynch
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Ten percent (10%) Bid Bond was submitted.
Description
Vear/Make/Model
Unit Price
2017 Ford F550
$121,751
Year
Make/Model — Trade In
Unit Price
1999
Unit #429, Ford Platform Truck,
VIN41FDXF46F8XED24368
Alternate #
Description
$9,000
Cost
Total
1
Tilt steering wheel; cruise control, power
S 122,7g2
windows, power door locks.
Estimated number of days for delivery from award date. I 90-120
Attorney Schmidt noted there was some white -out on the bid of Mike Raisor Ford. Upon a motion
made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bids were referred to Central
Services for review and recommendation.
REGULAR MEETING MAY 10 2016 173
OPENING OF QUOTATIONS — TWO (2) NEW ZERO TURN RIDING MOWERS (SEWER
DEPARTMENT CAPITAL)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for
the above referenced project. The following Quotation was opened and read:
RIGG'S OUTDOOR POWER
825 Meijer Dr.
Mishawaka, IN 46544
Local Business Preference Claim submitted —
Quotation was submitted by Jerry Klemczak
QUOTATION: $12,900 each
Upon a motion made by Ms. Maradik, seconded by Ms. Doran and carried, the above Quotation
was referred to Central Services for review and recommendation.
OPENING OF QUOTATIONS — 2016 TREE PLANTING — PROJECT NO. 116-031 (MVH)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for
the above referenced project. The following Quotations were opened and read:
DOUGLAS LANDSCAPE, INC.
23590 Ardmore Trail
South Bend, IN 46628
Quotation was submitted by Douglas Pittman
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
QUOTATION: $28,213.00
ACORN LANDSCAPING LLC
3680 W. Sample St.
South Bend, IN 46619
Quotation was submitted by Jeff Ritschard
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
QUOTATION: $48,149,00
Upon a motion made by Ms. Maradik, seconded by Ms. Doran and carried, the above Quotations
were referred to Engineering for review and recommendation.
AWARD BID — ONE (1) OR MORE, 2016 OR NEWER, COMBINATION JET
RODDER/VACUUM MACHINE WITH CAB & CHASSIS (SEWER DEPARTMENT CAPITAL)
Mr. Matthew Chlebowski, Central Services, advised the Board that on April 12, 2016, bids were
received and opened for the above referenced equipment. After reviewing those bids, Mr.
Chlebowski recommended that the Board award the contract to the lowest responsive and —
responsible bidder, Jack Doheny Companies, Inc., 777 Doheny Drive, P. 0. Box 609, Northville,
Michigan 48167, in the unit price amount of $378,898.00 with a trade-in amount of $50,000.00 for
a total expense of $331,398.00. Therefore, Ms. Maradik made a motion that the recommendation be
accepted and the bid be awarded as outlined above. Ms. Doran seconded the motion, which carried.
AWARD BID — CENTURY CENTER ELECTRICAL DISTRIBUTION UPGRADES PROJECT
NO. 116-007 (HOTEL/MOTEL TAX)
Mr. Richard Estes, Engineering, advised the Board that on April 26, 2016, bids were received and
opened for the above referenced project. After reviewing those bids, Mr. Estes recommended that
the Board award the contract to the lowest responsive and responsible bidder, Days Electrical,
REGULAR MEETING MAY 10, 2016 174
55169 CR 3 N, Elkhart, Indiana 46514, in the amount of $76,069.00. Therefore, Ms. Maradik made
a motion that the recommendation be accepted and the bid be awarded as outlined. above. Ms.
Dorau seconded the motion, which carried.
APPROVE 'THE REJECTION OF BID —2016 PARKING GARAGE IMPROVEMENTS
PROJECT NO. 115-143 (PARKING GARAGE FUND)
Mr. Richard Estes, Engineering, advised the Board that on April 12, 2016, a sole bid was received
and opened for the above referenced project. After reviewing the bid, Mr. Estes recommended that
the Board reject the bid due to it being over the amount budgeted for the project. Therefore, Ms.
Ma, adik made a motion that the recommendation be accepted and the bid be rejected as outlined
above. Ms. Doran seconded the motion, which carried.
APPROVE CHANGE ORDER. NO. 1 — CENTRAL SERVICES ROOF REPLACEMENT PROJECT NO. 115-035 (CENTRAL SERVICES CAPITAL)
Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 on behalf of
'_Northern Indiana Roofing & Sheet., 23495 Edison Road, South Bend, Indiana 46628, indicating
the term of the contract be increased by twelve (12) days for a new contract completion date of May
10, 2016. Upon a motion made by Ms. Maradik, seconded by Ms. Doran and carried, the Change
Order was approved.
APPROVE CHANGE ORDER NO. 4 — IGNITION PARK INFRASTRUCTURE PIIASE IC
DIVISION B —PROJECT NO 114-063A (RWDA TIIF
Mc Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 4 on behalf of
Majority Builders, Inc.; 62900 US 31 South, South Bend Indiana 46614, indicating the Contract
amount be increased by $31,840.00 for a new contract sum, including this Change Order; in the
amount of $1,010,472.87. Upon a motion made by Ms. Maradik; seconded by Ms. Dorau and
carried, the Change Order was approved.
(SPEC Y) (BUILDING DEPARTMENT CAPITAL LEASE) l L� JLLri1V �'r' i vivit�tsir.r;�
In a memorandum to the Board, Mr. Jeff Hudak, Central Services, requested permission to advertise
for the receipt of bids for the above referenced vehicles. Therefore, upon a motion made by Ms.
Maradik, seconded by Ms. Dorau and carried, the above request was approved.
APPROVAL, OF REQUEST TO ADVERTISE FOR THE, RECEIPT OF BIDS — LAFAYET'PE
FALLS SUBDIVISION PAVEMENT — PROJECT NO. 115-086 LRSA
In a memorandum to the Board, Ms. Blair Bennett, Engineering, requested permission to advertise
for the receipt of bids for the above referenced project. Therefore, upon a motion made by Ms.
Maradik, seconded by Ms. Doran and carried, the above request was approved.
APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS — I/N TEK AND
IIN KOTE SANITARY SEWER CHEMICAL FEED FACILITIES — PROJECT NO. 114-051 —
(UITILITIES. WASTEWATER OTIIEREOUIPMENTI
In a memorandum to the Board, Mr. Jacob Klosinski, Environmental Services, requested
permission to advertise for the receipt of bids for the above referenced project. Therefore, upon a
motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above request was
approved.
APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS — WASTEWATER
TREATMENT PLANT BELT FILTER PRESS NO. 3 REHABILITATION — PROJECT NO. 116-
051 (UTILITIES WASTEWATER EOUIPMEN1)
In a memorandum to the Board, Mr. Jacob Klosinski, Environmental Services, requested
permission to advertise for the receipt of bids for the above referenced project. Therefore, upon a
motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above request was
approved.
REGULAR MEETING MAY 10, 2016 175
APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE
SHEET — WASTEWATER TREATMENT PLANT COMPRESSOR BUILDING ROOF
REPLACEMENT — PROJECT NO 116-052 (UTILITIES, WASTEWATER BUILDING
MAINTENANCE SERVICES)
In a memorandum to the Board, Mr. Jacob Klosinski, Environmental Services, requested
permission to advertise for the receipt of bids for the above referenced project. Also presented at
this time for approval and execution was the Title Sheet. Upon a motion made by Ms. Maradik,
seconded by Ms. Doran and carried, the above request to advertise was approved, and the Tide
Sheet was approved and signed. —
APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF PROPOSALS — LAWN
MAINTENANCE AND MENTORSHIP PROGRAM (EDIT)
In a memorandum to the Board, Mr. Dave Relos, Community Investment, requested permission to
advertise for the receipt of proposals for the above referenced project. Therefore, upon a motion
made by Ms. Maradik, seconded by Ms. Dorau and carried, the above request was approved.
APPROVAL OF AGREEMENTS/CONTRACTS/PROPOSALS/ADDENDA
The following Agreements/Contracts/Proposals/Addenda were submitted to the Board fora oval:
TypeiRffesoumcs
ess
Description
Amount/
Motion/
Fundin
Second
Agreementood
Educational Leadership and
$12,500
MaradW
s &
Technical Training Services
(EDIT)
Doran
for Neighborhood
orp.
hood
s
Connection
Independent
David Scott
One-Wayto'fwo-Way
$26.50/hour;
Maradik/
Contractor
Bockover
Streets Conversion
NTE $2510I
Dorau
Agreement
Inspection Services
IF Bond)
Order Form
West
Purchase of 300 Licenses of
$16,776/ Year;
Maradik/
and
Publishing
the Clear Program for use for
585,574 for
Doran
Addendum
Corporation, a
Criminal Investigations by
Five (5) Years
Thomson
the Police Department;
(Subject to
Reuters
Addendum Sets Term for
Police
Business
Five (5) Years
Department
Continuing
Education
Appropriation
of Funds)
Professional
EPOCH
Design for Abatement,
NTE $184,179
Mamdik/
Services
Architecture +
Demolition, and LEED
(Fire Dept.
Doran
Agreement
Planning, LLC
Certified Rebuild, and Site
Capital
Development of New Fire
Improvements)
Station No. 4
Midwest
Dell
Lease of 244 Ruggedized
$776,971.02
'fabled
Higher
Laptops and 240
(Subject to
Dorau/
Education
Mount/Docks through
Police, Fire,
Maradik
Compact
MHEC Agreement for
Environmental
Legal to
(MHEC)
Police, Fire, and
Services
Confirm
Agreement
Environmental Services
Capital Lease
Information
Financing)
Received
from Dell
Estimate
Cops Gear
Removal and Installation of
Unit Price of
Tabled
Mounting Gear and Power
$125; NTE
Dorau/
Supply for Laptops for Police
$23,750
Maradik
Vehicles
(Police, Fire,
Environmental
Services
Capital Lease)
Amendment to
Kirby Risk
Board of Works approved
$25,922.60/
Maradik/
REGULAR MEETING
MAY 10, 2016 176
Maintenance
Electrical
One Year Agreement on
Year: Total
Dorau
Agreement
Supply
April 26, 2016; Request for
Contract
Three (3) Year Option
Amount of
Approval for Software
$77,767.79for
Maintenance & Support for
Three (3)
Monitoring & Control of the
Years
Waste Water Treatment Plant
(Subject to
Waste Water
O&M
appropriation
Addendumto
1nfoSend, Tnc.
Water Works Customer
of Funds)
CurrentUnit
Maradik/
Agreement
Billing Three (3) Year
Pricing
Relos
Extension
(Water Works
Interdepart-
South Bend
Community Investment and
Operations)
2016:
Maradik/
mental
Park
Parks Forestry Department
$125,000;
Dorau
Agreement
Department/
Five (5) Year Tree
2017:
Board of Park
Maintenance Agreement for
$130,000;
Commissioners
New Trees Planted with
2018:
Smart Streets and Ignition
$130,000;
Park Projects:
019:
2019:
2016: One Thousand(1,000)
$12
Trees
2017: One Thousand, Five
2020:
Hundred (1,500) Trees
$126,000
2018: One Thousand, Five
(EDIT)
Hundred (1,500) Trees;
2019: One Thousand (1,000)
frees
2020: One Thousand (I Mo)
Trees
APPROVAL OF PERMIT AND LICENSE APPLICATIONS
The followine permit and license annl;raAnnc
Applicant
Description
DatelT'ime
u atio a..
Location
Motiou
Regional
Non Residential
May 12, 2016;
Lafayette Blvd. from
Carried
Maradik/
Development
Block Party —
9:00 a.m. to
South St. to Marcus Dr.
Dorau
Authority
Kick Off and
4:00 p.m.
and Bronson St. from
Groundbreaking
Lafayette Blvd. to Main
Ceremony for
St. (Marcus Dr. is not
Studebaker
Dedicated Street and is
Redevelopment
City Property)
Initiative
Morns
on Residential
June3,10,17,
Michigan St. between
Maradik/
Performing
Block Party—
July
Morris Performing Arts
Dorau.
Arts Center
Fridays by the
1,8,15,22,29;
Center and Jon Hunt
Subject to
Fountain
August 5,12.19
Plaza
Construction
and 26, 2016:
9:00 a.m. to
1:30 p,m.
Mama's
Procession—
May 28, 2016;
Rcvised Route/ Must
Maradik/
Against
Annual Walk
9:30 a.m. to
Cross at Signals at Eddy
Dorau
Violence
and
10:00 a.m.
St. and Cedar St. and SR
Remembrance
23
Celebration
Beacon Health
Procession —
June 4, 2016;
On Route as Submitted
Maradik/
Systems
Sunburst Race
6:00 a.m. to
Dorau
12:30 M.
REAL
Procession—
June11,2016;
On Route as Submitted
Maradik/
Services, Inc.
Alzheimer's &
9:00 a.m. to
Dorau
REGULAR MEETING
MAY 10, 2016 177
Dementia
2:00 p.m.
Subject to
Services 26'
Construction
Annual
Fundraising
'
Walk
LGBTQ
Procession—
June 25, 2016;
Maradik/
Center
LGBTQ Pride
3:00 p.m. to
Dorau
Parade
5:00 p.m.
American
Procession—
May 28, 2016;
On Route as Submitted;
Maradik/
Legion Post
Stars and
8:00 a.m. to
No Police Escort
Dorau
357
Stripes Forever
12:30 p.m.
Ride
Thomas
Procession -
May 30, 2016;
Favorable
Maradik/
Klempay, Sr
Westside
6:00 a.m. to
Recommendations for
Doran
Memorial Day
12:00 p.m.
revised Route
Subject to
Parade
Ending at
Kaley St. due
to Construction
The View
Sidewalk Cafe
Monday —
515 E Jefferson Blvd,
Maradik/
Tavern
Permit
Saturday; 11:00
Dorau
a.m. to 10:00
p.m.; Sunday:
1:00 P.M. to
10:00 P.M.
Cafe Navarre
Sidewalk Cafe
Sundav-4:00
101 N. Michigan St.
Maradik/
Permit
p.m:10:00
Dorau
p.m.; Monday
Approval
through
subject to Set-
Thursday-11:00
Up meeting
a.m.-11:00
ADA
p.m.; Friday-
Requirements
I1:00 a.m.-
12:00 midnight;
Saturday-4:00
p.m.-12:00
midni ht
LAZ Parking
License - Public
1228 N. Eddy St.
Maradik/
Midwest, LLC
P
I Dorau
APPROVE TRAFFIC CONTROL DEVICES
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the following traffic
control devices were approved:
NEW INSTALLATION: Handicapped Accessible Parking Space Sign
LOCATION: 1841 N Huey St.
938 S. 27"' St.
REMARKS: All criteria has been met
NEW INSTALLATION: No Parking Anytime Signs, and Removal of Conflicting
Signs, Markings and Striping
LOCATION: Notre Dame Avenue between Napoleon and Angela
Boulevards
REMARKS: Allcriteria has been met
APPROVE RENEWAL OF WASTEWATER DISCHARGE PERMIT(S)
In a Memorandum to the Board, Mr. Anthony Hunsberger, Division of Environmental Services,
submitted the following Wastewater Discharge Permit for renewal and recommended approval:
I/N Tek and I/N Kote, 30755 Edison Road, New Carlisle, IN 46522
There being no further discussion, upon a motion made by Ms. Maradik, seconded by Ms. Dorau
and carried, the permit's renewal was approved.
REGULAR MEETING
MAY 10, 2016 178
APPROVE CLAIMS
Ms. Doran stated that a request to pay the following claims in the amounts indicated has been
received by the Board; each claim is fully supported by an invoice; the person receiving the goods
or services has approved the claims; and the claims have been filed with the City Fiscal Officer and
certified for accuracy.
Name
of Claim
Date
EETAmount
City of South Bend
$5,111,330.28
O5/06/2016
City of South Bcnd
$79.01
05/06/2016
City of South Bend
$1,444,590.99
O5/10/2016
U. S. Bank National Association 2016 Construction
51,064,347.05
05/6/20 66
Fund Payment Requisition No, 29
U. S. Bank National Association Requisition Request
$369,495.00
OS/05/2016
No. 8; Central Indiana Truck Equipment Corp. Inv.
10933117; 28 yd. Refuse Truck
Us. Bank National Association, Requisition No. 7;
$107,035.00
0>/05/2016
Midwest Meter Inc. Inv. No. 0076952-IN; Water
Meters
IIane of America Public Capital Corp.; Bank of
S2,750
5/10/2016
America, National Assoc.; Auto's Extras, Inc.
Payment Request No. 32
"Therefore, Ms. Maradik made a motion that after review of the expenditures, the claims be
approved as submitted. Ms. Dorau seconded the motion, which carried.
ADJOURNMENT
There being no further business to come before the Board, Mr. Relos stated the meeting was
adjourned at 10:12 a.m.
BOARD OF PUBPC/WORKS
2
Gary A. Gilot, President
DaVoy�s,1.Me tuber
Elizabeth A. Maradik, Member
Therese J.1`Dofa'u, Member
.lames A. Mueller, Member
ATTEST:
IM. Martin, Clerk