Loading...
HomeMy WebLinkAboutagenda item 2016 0222 rdc 05b6ITEM: 5.13.(6) Department of Community Investment Memorandum February 22, 2016 TO: South Bend Redevelopment Commission FROM: David Relos, Economic Resource�lj SUBJECT: Hamilton Block ALTA Survey & Alley Vacation Professional Services Agreement Danch Harner & Associates As part of preparing this block for disposition, understanding what various easements or other restrictions may be in place is needed. Additionally, there is an east / west and north / south alley that dissects this block, and to be fully functional as a development site, need to be vacated. This proposal from Danch Harner & Associates is to provide an ALTA survey and the Alley Vacation paperwork to complete these functions, in an amount of $6,640. Staff requests approval of this Professional Services Agreement in a not -to- exceed amount of $8,000, in the event additional filing fees are required or additional utility companies are discovered. 227 W. JEFFERSON BLVD. SOUTH BEND, IN 46601 1 P: 574 - 235 -9371 1 FAX: 574 - 235 -9021 1 SOUTHBENDIN.GOV DFIADanch, Harner & Associates, Inc. Michael J. Danch, L.A. Ron Harner, P.S. Mr. David Relos Community Investment Department City of South Bend 14t' Floor County -City Building 227 West Jefferson Blvd. South Bend, Indiana 46601 Land Surveyors - Professional Engineers Landscape Architects - Land Planners February 9, 2016 RE: Preparation of an ALTA Survey for several parcels of ground located on the Block bounded by Sample, Franklin, Lafayette and Garst, Alley Vacation Preparation and Utility easement release work: Dear Mr. Relos: Please accept this letter as our written cost proposal to provide your Department with Survey services to prepare a Standard ALTA Survey, for several parcels of ground bounded in the block by Sample Street on the north, Lafayette Blvd. on the east, Garst Street on the south and Franklin Street on the west. The ALTA survey would include items 1 -4, 6, 7(b) (1), 8, 9 and 11(b) and 13 from Table "A" of the revised ALTA /ASCM Land Title Survey Minimum Standard Detail Requirements effective 02/23/2011. We will also prepare an Alley Vacation petition for the public alleys within the bounds of the above described area and also contact all utility companies to request a utility rights easement release letter for the vacated alleys. Our cost estimate for the above described work is shown below: A). ALTA Surve, 1). Preparation of the ALTA Survey for this site which includes several parcels of ground bounded in the block by Sample Street on the north, Lafayette Blvd. on the east, Garst Street on the south and Franklin Street on the west. Cost for the work with provided title work would be ................ ............................... $ 4,165 (Any requested drawing revisions would be done at our standard hourly rates, which are attached.) B). Planning work for Alley Vacation & Utility, rights release for vacated alleys; 1). Prepare an Alley Vacation, including all required application/ordinance paperwork, Vacation diagram and legal description, represent the City at required Public Hearings and request from the utility companies release of utility easements if possible from the Alley Vacation area. Cost for this item would be ................................................ ............................... $ 2,225 Submittal fees and mailing fees would be approximately .............. ..............................$ 250 If this proposal is acceptable, we will require updated Title work (already provided) for the survey property along with copies of all easements shown on the Title work. The drawing would be sent within 22 -27 working days or less from project approval and permitting weather. Any requested drawing revisions would be done at our standard hourly rates, which are attached. 1643 Commerce Drive - South Bend, IN 46628 208 West Mars - Berrien Springs, MI 49103 Office: (574) 234 -4003 / (800) 594 -4003 • Fax: (574) 234 -4119 Office: (269) 471 -3010 - Fax: (269) 471 -7237 -2— February 10, 2016 If you have any questions concerning this matter, please feel free to give me a call at (574) 234 -4003. Sincerely, Approved By: Ke" J. DMId Date: Michael J. Danch President Danch, Harper & Associates, Inc. "C" D. Relos ALTA, Alley Vacation preparation Md. -3— February 10, 2016 RANCH, HARNER & ASSOCIATES, INC. EFFECTIVE DATE: JANUARY 2016 SCHEDULE OF HOURLY RATES AND DIRECT EXPENSES CLASSIFICATION HOURLY BILLING RATE Senior Professional Engineer $138.00 Engineering Designer $80.00 Project Engineer $70.00 Senior Professional Land Surveyor $138.00 Senior Survey/Engineering Tech $80.00 Survey/Engineering Survey/Engineering Tech $55.00 Senior Professional Landscape Architect $138.00 Survey Manager $70.00 Two Person Field Crew $120.00 Principal $138.00 Clerical $45.00 ITEM UNITS UNIT PRICE Mileage Miles $0.50 Copies* Each $0.25 Standard Size Prints (24 x 36) Each $4.00 Oversize Prints Square Foot $1.00 Vellums 24 x 36 size) Each $10.00 Overnight Travel: Meals Cost Lodging Cost Public Transportation Cost *Note: Copies include 81/2 x 11, 81/2 x 14, or 11 x 17 size sheets. I a C, NAP. "lop CVO G OP. CO CO I a