HomeMy WebLinkAbout6.E.(2) Proposal fro Phase II Environmental (Ignition Park)~ (' / L-~
February 2, 2009 '
City of South Bend
Community and Economic Development
1200 County-City Building
227 West Jefferson Blvd.
South Bend, IN 46601
Attention: Mr. Bill Schalliol
RE: PROPOSAL FOR PHASE II ENVIRONMENTAL SITE ASSESSMENT FOR IGNITION
PARK INCLUDING THE SITES REFERENCED AS ZIOLKOWSKI CONSTRUCTION,
UZELAC PROPERTY, GRAF PROPERTY AND WASTE MANAGEMENT
Dear Bill:
Wightman Petrie, Inc. (WPI) is pleased to submit this proposal to provide environmental consulting
services for the above referenced properties. This proposal includes an outline of our understanding of
the project information, proposed scope of services, our estimated fee, our projected schedule, and
contractual information.
PROJECT INFORMATION
WPI reviewed copies of the Phase I Environmental Site Assessments reports conducted by WPI and
Wightman Environmental, Inc. (WEI). The reports noted various "recognized environmental conditions"
(RECs) in conjunction with the subject properties including the potential presence of underground
storage tanks, drums of hazardous and/or petroleum products needing to be removed, floor drains with
unknown discharge locations and the possibility of contaminants migrating to the subject properties from
upgradient historically manufacturing sites.
WIGHTMA ETRIE
~.~~,.~.
574.232.4388 574.232.4333
City of South Bend
February 2, 2009
Page 2 of 10
PROPOSED SCOPE OF SERVICES
WPI will begin the site investigations by attempting to confirm whether the interior floor drains are
connected to the City of South Bend's municipal sewer system. WPI will place the dye tablets in the floor
drains and direct a large amount of water into the lines. WPI will attempt to verify the municipal
connection by looking for the dye in the nearby sewer manholes. If the drains connection to the
municipal sewer system is not verified, WPI will recommend an additional soil boring in the vicinity of the
drain.
Due to the unknown location and status of the underground storage tanks, WPI proposes to conduct a
ground penetrating radar (GPR) survey on certain areas of the subject properties. This survey will be
utilized to determine whether or not any tanks are still present, and help pinpoint sample locations by
potentially finding exact past locations of previously removed tanks. If any tanks are still present, WPI
recommends that the tanks be removed from the ground according to all applicable regulations. A
sampling plan for the remainder of the area may be modified once the GPR survey is completed. WPI
will verbally report the findings of the GPR to the City.
The soil and groundwater samples will be obtained by using a Geoprobe unit. The Geoprobe is a truck-
mounted, hydraulically activated sampling device that pushes a probe into the ground at approximately
four-foot intervals. Pushing of the probe can proceed to any desired depth at which soil and /or
groundwater samples can be collected. The soil samples will be initially scanned using a Photoionization
Detector (PID). Each Geoprobe location will be converted into a temporary well for the purpose of
collecting a groundwater sample from the upper portion of the saturated zone. The collection of
groundwater samples from the upper portion of the saturated zone. The collection of groundwater
samples will involve the insertion of a 1-inch PVC slotted screen and riser into the borehole created by
the Geoprobe. Once inserted, WPI will attempt to place a sand filter around the PVC screen to assist in
the filtering of suspended solids. A minimum of five well volumes of groundwater will be removed from
the well prior to initiating sampling. Once the groundwater sample has been collected, the well will be
allowed to recharge and a measurement of the depth to groundwater will be noted. Soil and
groundwater samples will be submitted to the laboratory for analysis of suspected potential
contaminants. WPI will coordinate with the utility location services to ensure that the proposed boring
locations are not located near any utilities.
The drums of hazardous or petroleum waste cited in the Phase I ESA reports will be further investigated
and properly disposed of according to the Indiana Department of Environmental Management and the
Environmental Protection Agency's requirements if the site owners will not remove them. WPI will
contact the City with a disposal plan once the drums have been assessed.
City of South Bend
February 2, 2009
Page 3 of 10
SCOPE OF SERVICES FOR SITE #1
Waste Management property located at 1515-1519 S. Franklin St., South Bend, IN 46601
Utility Coordination
Ground Penetrating Radar
Geoprobe
10 Geoprobe Locations
Sample Collection/Field Oversight
Project Manager
Field Assistant
Analytical
10 Soil Samples
2 Groundwater Samples
Soil Analysis:
Groundwater Analysis:
Polynuclear aromatic hydrocarbons (PAH's) EPA method
8270 SIM
RCRA 8 Metals (Arsenic, Barium, Cadmium, Chromium,
Lead, Mercury, Selenium and Silver) EPA Method
6010B(7470-7471
• Volatile Organic Compounds (VOC's) EPA Method 8260
Percent Moisture ASTM
PAHs EPA Method 8270 SIM
RCRA 8 Metals (Arsenic, Barium, Cadmium, Chromium,
Lead, Mercury, Selenium and Silver) EPA Method
6010/7470-7471
VOCs EPA Method 8260
Survey of Boring Locations and Recognized Environmental Concerns
Laboratory Results Assessment and Report Summary
PHASE II ESA SERVICES ESTIMATED COST: $8,341.50
City of South Bend
February 2, 2009
Page 4 of 10
SCOPE OF SERVICES FOR SITE #2
Waste Management property containing 5 parcels south of the RR tracks
Utility Coordination
Ground Penetrating Radar
Geoprobe
10 Geoprobe Locations
Sample Collection/Field Oversight
Project Manager
Field Assistant
Analytical
10 Soil Samples
2 Groundwater Samples
Soil Analysis:
Groundwater Analysis:
Polynuclear aromatic hydrocarbons (PAH's) EPA method
8270 SIM
RCRA 8 Metals (Arsenic, Barium, Cadmium, Chromium,
Lead, Mercury, Selenium and Silver) EPA Method
6010B/7470-7471
Volatile Organic Compounds (VOCs) EPA Method 8260
Percent Moisture ASTM
PAHs EPA Method 8270 SIM
RCRA 8 Metals (Arsenic, Barium, Cadmium, Chromium,
Lead, Mercury, Selenium and Silver) EPA Method
6010/7470-7471
VOCs EPA Method 8260
Survey of Boring Locations and Recognized Environmental Concerns
Laboratory Results Assessment and Report Summary
PHASE II ESA SERVICES ESTIMATED COST: $8,341.50
City of South Bend
February 2, 2009
Page 5 of 10
SCOPE OF SERVICES FOR SITE #3
Ziolkowski Construction property for 1311-1319 S. Lafayette Blvd., South Bend, IN 46601
Utility Coordination
Ground Penetrating Radar
Geoprobe
3 Geoprobe Locations
+ 1 (If dye test does not confirm municipal hook-up.)
Floor Drain Dye Test
Sample Collection/Field Oversight
Project Manager
Field Assistant
Analytical
3 Soil Samples
1 Groundwater Sample
Soi! Analysis:
Groundwater Analysis:
• Polynuclear aromatic hydrocarbons (PAHs) EPA method
8270 SIM
• RCRA 8 Metals (Arsenic, Barium, Cadmium, Chromium,
Lead, Mercury, Selenium and Silver) EPA Method
601 OB/7470-7471
• Volatile Organic Compounds (VOCs) EPA Method 8260
• Percent Moisture ASTM
• PAHs EPA Method 8270 SIM
• RCRA 8 Metals (Arsenic, Barium, Cadmium, Chromium,
Lead, Mercury, Selenium and Silver) EPA Method
6010/7470-7471
VOCs EPA Method 8260
Survey of Boring Locations and Recognized Environmental Concerns
Laboratory Results Assessment and Report Summary
PHASE II ESA SERVICES ESTIMATED COST: $4,924.17
City of South Bend
February 2, 2009
Page 6 of 10
SCOPE OF SERVICES FOR SITE #4
Ziolkowski Construction property located at 1005-1015 S. Lafayette Blvd., South Bend, IN 46601
Utility Coordination
Ground Penetrating Radar
Geoprobe
9 Geoprobe Locations
+ 1 (If dye test does not confirm municipal hook-up.)
Sample Collection(Field Oversight
Project Manager
Field Assistant
Analytical
9 Soil Samples
2 Groundwater Samples
Soil Analysis:
Groundwater Analysis.
• Polynuclear aromatic hydrocarbons (PAHs) EPA
method 8270 SIM
• RCRA 8 Metals (Arsenic, Barium, Cadmium,
Chromium, Lead, Mercury, Selenium and Silver}
EPA Method 6010B/7470-7471
• Volatile Organic Compounds (VOCs) EPA Method
8260
• Percent Moisture ASTM
• PAHs EPA Method 8270 SIM
• RCRA 8 Metals (Arsenic, Barium, Cadmium,
Chromium, Lead, Mercury, Selenium and Silver)
EPA Method 6010/7470-7471
• VOCs EPA Method 8260
Survey of Boring Locations and Recognized Environmental Concerns
Laboratory Results Assessment and Report Summary
PHASE II ESA SERVICES ESTIMATED COST: $8,108.50
City of South Bend
February 2, 2009
Page 7 of 10
SCOPE OF SERVICES FOR SITE #5
Graf property located at 1320 Franklin Street, South Bend, Indiana 46601
Utility Coordination
Ground Penetrating Radar
Geoprobe
4 Geoprobe Locations
Sample Collection/Field Oversight
Project Manager
Field Assistant
Analytical
4 Soil Samples
1 Groundwater Sample
Soil Analysis:
Groundwater Analysis:
• Polynuclear aromatic hydrocarbons (PAHs) EPA
method 8270 SIM
• RCRA 8 Metals (Arsenic, Barium, Cadmium,
Chromium, Lead, Mercury, Selenium and Silver)
EPA Method 6010B/7470-7471
• Volatile Organic Compounds (VOCs) EPA Method
8260
• Percent Moisture ASTM
• PAHs EPA Method 8270 SIM
• RCRA 8 Metals (Arsenic, Barium, Cadmium,
Chromium. Lead, Mercury, Selenium and Silver)
EPA Method 6010/7470-7471
VOCs EPA Method 8260
Survey of Boring Locations and Recognized Environmental Concerns
Laboratory Results Assessment and Report Summary
PHASE II ESA SERVICES ESTIMATED COST: $5,167.17
City of South Bend
February 2, 2009
Page 8 of 10
SCOPE OF SERVICES FOR SITE #6
Uzelac property located at 1200 & 1300 Blocks of Franklin St. 8~ Lafayette Blvd., South Bend, IN
46601
Utility Coordination
Ground Penetrating Radar
Geoprobe
9 Geoprobe Locations
Sample Collection/Filed Oversight
Project Manager
Field Assistant
Analytical
9 Soil Samples
2 Groundwater Samples
Soil Analysis:
Groundwater Analysis:
• Polynuclear aromatic hydrocarbons (PAHs) EPA
method 8270 SIM
• RCRA 8 Metals (Arsenic, Barium, Cadmium,
Chromium, Lead, Mercury, Selenium and Silver)
EPA Method 6010B/7470-7471
• Volatile Organic Compounds (VOCs) EPA Method
8260
• Percent Moisture ASTM
• PAHs EPA Method 8270 SIM
• RCRA 8 Metals (Arsenic, Barium, Cadmium,
Chromium, Lead, Mercury, Selenium and Silver)
EPA Method 6010/7470-7471
• VOCs EPA Method 8260
Survey of Boring Locations and Recognized Environmental Concerns
Laboratory Results Assessment and Report Summary
PHASE II ESA SERVICES ESTIMATED COST: $8,108.50
City of South Bend
February 2, 2009
Page 9 of 10
REPORTING
Upon completion of the field and laboratory work, a final report shall be prepared for your review,
comment and approval. The report shall include a site plan showing soil boring locations, soil boring logs
showing the classification of the subsurface materials encountered and conditions of the soil, analytical
results and our findings and conclusions regarding the site. If appropriate, recommendations for
additional assessment activities will be made.
QUALIFICATIONS
Cost estimates for our proposed services have been prepared based on the following assumptions:
• WPI will have unlimited access to the site during daylight hours,
• WPI will have access to a water source for the floor drain dye testing
• No subsurface obstructions such as buried utilities of large fill debris will interfere with our work,
• Inclement weather will not interfere with the completion of our field work,
• Contaminated soil from the excavation areas will be stockpiled on-site until disposal
arrangements can be made,
• Groundwater will occur at a depth no greater than 25 feet below land surface,
• This proposal does not include the costs for disposal of any investigative derived wastes.
AUTHORIZATION
Please acknowledge your acceptance of this proposal by signature, where indicated below. Receipt of
acceptance will serve as WPI's authorization to proceed.
Wightman Petrie, Inc. appreciates the opportunity to be of service to you on this project. Should you
have any questions or require additional information regarding this proposal, please contact me at (574)
232-4388.
Sincerely,
Wightman Petri nc~.
- ~,
;'
~/ `- i
Eric Z~II ;`
Environriiental Department Manager
I:\Proposals\Wightman Petrie South Bend Proposals\ Phase 18 II
Proposals\Studebaker Corridor Phase II ESAs 1-12-09
City of South Bend
February 2, 2009
Page 10 of 10
PROPOSAL ACCEPTANCE
(Please return signature acceptance via facsimile to 574-232-4333 or a hard copy mailed to the WPI
South Bend office.)
This proposal (Phase II Environmental Site Assessment for Ignition Park including the sites
referenced as Ziolkowski Construction, Uzelac Property, Graf Property and Waste Management
for $42,991.34) is hereby accepted and authorization to proceed hereby granted:
This proposal has been accepted for the following properties listed below:
_ Waste Management 1515-1519 S. Franklin Street and the 5 parcels south of the RR tracks
South Bend, Indiana 46601 $16,683.00.
Ziolkowski Construction 1311 - 1319 8~ 1005 - 1015 S. Lafayette Boulevard, South Bend,
Indiana 46601 $13,032.67.
Graf Property 1320 Franklin Street, South Bend, Indiana 46601 $5,167.17.
Uzelac Property 1200 & 1300 Blocks Franklin Street & Lafayette Boulevard, South Bend,
Indiana 46601 $8,108.50.
Accepted By:
Printed name and title:
Business name:
Billing address:
Billing/account manager:
Phone No.'.
E-mail:
Fax No.:
Date:
I:\Proposals\Wightman Petrie South Bend Proposals\Phase I & II
Proposals\Studebaker Corridor Phase II ESAs 1-12-09