To: Redevelopment Commission -
From: Bill Schalliol, Economic Development Planner ~1 ~I
Subject: Professional Services Proposal -Phase 2, ESA
Ignition Park Project Area
- Cancellation of PSP Contract approved Nov. 7, 2008
- Phase II ESA Contract -Multiple Parcels
- Phase II ESA Contract -Hamilton Towing
Date: February 2, 2009
Attached to this memorandum are three professional service proposals related to Phase II
Environmental Site Assessment (ESA) work in the Ignition Park Project Area.
Item #1: Cancellation of PSP Contract approved Nov. 7, 2008
At the Commission meeting on November 7~h, the Commission was asked to approve a
Professional Services Proposal for Phase II study of the Burton Property/Waste
Management site now owned by the Redevelopment Commission. The scope of work
needs to be modified to be more inclusive of other sites in that area and is being replaced
by Item #2.
Staff requests your approval of the cancellation of a professional services contract with
Wightman Petrie, Inc. approved on November 7, 2008.
Item #2: Phase II ESA Contract (Multiple Sites)
As a replacement to Item #1, and to be better prepared while acquiring property and
planning for site clearance in the Ignition Park Area, the staff has worked with Wightman
Petrie to develop a proposal scope that includes four parcels blocks of study. The parcel
blocks include the Burton Property/Waste Management site (Commission owned), Graf
Property (Commission owned). Zilkowski Properties (includes the paint shop and
office/storage area; to be acquired by the Commission), and Uzelac Property (to be
acquired by the Commission).
What We Do Today Makes A Difference!
Phase 1 ESA's were completed for all of these sites in 2008 and as we proceed with
acquisition and site clearing, we need to better understand specific site conditions and the
Phase If ESA work will help staff better prepare and budget during the demolition process.
Additionally, all of the property included within this request will be within the new TRANSPO
HQ project site. A map of the project area is included with this report.
The total project proposal amount for all work contained within the agreement is
$42,991.34. Staff would request anot-to-exceed approval amount of $45,000.00 for this
project.
Staff requests favorable approval of this request.
Item #3: Phase II ESA Contract (Hamilton Towin
As part of the acquisition effort in the Ignition Park area, the City has been working with
Hamilton Towing concerning the possible acquisition of their three sites in the corridor area
The Phase II work scope contained within the proposal would help all parties better
understand potential issues that would need to be addressed through the acquisition and
demolition process.
The total project proposal amount for all work contained within the agreement is
$23,363.00. Staff would request anot-to-exceed approval amount of $25,000.00 for this
project.
Staff requests favorable approval of this request.
Metro To RC Phase II CSA 02 0? 09.doe What We Do Today Makes A Difference!
~ _
u F...
~ ~
O
b ~ y 'z
t
w ~ ~ ~ ~
1 M L ~---- N
*k Q ~ ~, ~,~,-
*k Q
N ~ ~ ~
- ~ (1) ~
~ x
,,, ~ -
r~('
'~II Ali I ~ - - _~
~~ N
~ ~.
I
0
.,
- i.
~~.
F
------ -- ~s boas '~~
i~l I y
_,
t
11~~
$--N1d H',3--~-~ ul ~.S-Mldif'-H
~ ~ ~ ~ ~.Y
a~ ro w ~~._ ~ ~ ~,da~-~~3
~ a,, '~ ,""<r
Q ~ 1 -t'-dat!3t~~ ~~'Ny
~~,
`IV Q \_
V ~ ~
~ ~
'~ ~ a~
L ~
Q N n ~
t• ~ ~ O ~
v ~ o ~ ~ ~ j
O m rn ~~ u rn ~' _ N
L '^ '- a ~ c m ° ~ c w d ~' m c
~ v1 ,J a v ~, °i 3 in ~ a ~ u _ w a o
0
~ ~ a ~ v `_' c ~ ~ o ~ m m ~ a o a m N
~6 > m o a Y = ~ cn ~ ~
~ d Z o m a~ a = w v_ ~~ Q m m a o ~ m o 0
L ~ rn m ~ Q 2 ~ ~ to (n = ~ d= o
,~ ~ =O ~ m W W U 2 a d d a a a~~~~ N N ~
_ ~ a~ v
October 9, 2008
City of South Bend
Division of Economic Development
1200 County City Building
South Bend. Indiana 46601
Attention: Mr. Nick Witwer
RE: PROPOSAL TO PERFORM A PHASE II ENVIRONMENTAL SITE
ASSESSMENT FOR THE WASTE MANAGEMENT 8 FACILITY LOCATED AT
1515-1519 SOUTH FRANKLIN STREET, SOUTH BEND, INDIANA
Dear Mr. Witwer:
The Phase I ESA listed the following recognized environmental conditions (RECs) for the
referenced property:
1. A dry well was identified on the subject property. The dry well can act as a
pathway for hazardous substances to impact the soil and or groundwater
beneath the subject property.
2. The subject property has been utilized as industrial property from prior to 1917 to
current day. A chemical manufacturer and an iron and metal scrap yard were
once located on the subject property. It is likely that large quantities of
hazardous substances have been used and stored on the subject property for at
least 100 years.
Following is a discussion of the work we propose to complete at the site and an estimated cost
to complete the work.
~~
WIGHTMA ETRIE
Sl I'Vl Sine„ fU'~INI!iUN ~NbiftON'-~CH TFi L"IV_~/ q~'i Mc iu'f ~.-I~!P!
~, ,--L
y
~! I Z S. La(mETe LIvJ. ~ Sa~tl. L'ecA. IN 46601 ~~. 574.232.4388 r: 574.232.A333
-S f ~ r ~' a - r ~'.,:
t
~ y~i r
ti~.~
Mr. Witwer
October 9, 2008
Page 2
Work Plan
WPI proposes to install a series of ten (10) soil borings utilizing a tuck mounted push-probe
(geoprobe). Soil borings shall extend to groundwater or as deep as logistically possible. Soil
borings shall be installed in field determined locations, primarily focusing on the dry well location
and stockyard area.
A single soil sample shall be collected from each soil boring location and sent to an independent
laboratory for analysis of 8270 polynuclear aromatic hydrocarbons (PNAs), 8260+ volatile
organic compounds (VOCs), and EPA 8 metals. A minimum of two groundwater samples shall
also be collected from field determined soil boring locations. Groundwater samples shall also
be analyzed for 8270 PNAs, 8260+ VOCs, and EPA 8 metals.
Soils shall be continuously sampled and inspected for visual/olfactory signs of contamination as
well as scanned with a PID. Collected soil samples shall be placed in dedicated laboratory
approved containers, placed on ice, and kept at a constant temperature of approximately 4
degrees Celsius. All equipment shall be decontaminated between each boring. Soil cuttings,
wash water, and purged groundwater shall be containerized in 55-gallon drums which will be left
on-site pending analytical results. This proposal does not include the costs for disposal of any
investigative derived wastes.
Upon completion of the field and laboratory work, a final report shall be prepared for your
review, comment and approval. The report shall include a site plan showing soil boring
locations, soil boring logs showing the classification of the subsurface materials encountered
and conditions of the soil, analytical results, and our findings and conclusions regarding the site.
WPI estimates the Phase II ESA field work and laboratory work can be completed in
approximately three to four weeks assuming all third party contractors are available in the
preferred time frame. Laboratory analysis can be expedited for an additional charge.
Mr. Witwer
October 9, 2008
Page 3
Proposed Cost
Geoprobe $1,500.00
(Full Day)
Field OverslghtlSample Collection $1,500.00
Analytical (normal turn around time) $5,520.00
(10 soil samples @ $460.00/ea.)
(2 groundwater samples @ $460.00/ea.)
Report 1 700.00
TOTAL ESTIMATED PRICE $10,220.00
If the project is ongoing, our services will be billed monthly. Our monthly statements will include
a 1.5% fuel surcharge. Payment is due upon receipt of our invoice. Work can be suspended on
any account which is 35 days past due until the account is paid in full. If you have any
questions or comments concerning our services or charges during the course of the work,
please bring them to our attention immediately so that any problem can be resolved quickly.
If this proposal is acceptable to you, please sign the enclosed copy and the following General
Conditions fiorm and return a copy to us for our files. This work will be performed for the not-to-
exceed fee as shown.
Should you have any questions or comments regarding this project or proposal feel free to
contact me at 574-232-4388
Sin rely
Eric
Proj ct Manager
Mr. Witwer
October 9, 2008
Page 4
a.
„,,,, ~~~' , ; <,®~ ~ f~~~ 11-7-08
Accepted By: z ~T~ ,U~ ~~ ~ c ~ Date:
1`tarcia I. Jones; President,. ~~ncy N. ~ in4,
Printed name and title:
Secretary
Business name: Corununity & Economic Development
227 [~. Jeffer_son 1lvd., Suite 1200S
South Send, IN 46601
Billing address:
Billing/account manager:
Phone No.: 235-5842
3111 Schalliol
Fax No.: 235-9021
E-mail: bschalli@southbendin.oov
I:\Proposals\Wightman Petrie South Bend\Proposals\COSB\Phase II ESA WM 8 Facility 10-09-08.doc