Loading...
HomeMy WebLinkAboutCENTURY CENTER MASONRY RESTORATION – PROJECT NO. 115-051R OPENING AND AWARD OF BIDS – CENTURY CENTER MASONRY RESTORATION – PROJECT NO. 115-051R (HOTEL/MOTEL TAX) C&S MASONRY RESTORATION LLC-AWARDEE 3725 N. Foundation Ct., Suite AB South Bend, IN 46628 Bid was signed by: Steve Fields Contractor’s Non-Collusion Affidavit, Non-Debarment Affidavit, Certification Regarding Investment with Iran, Employment Eligibility Verification, Non-Discrimination Commitment for Contractors and Certification of Use of United States Steel Products or Foundry Products was submitted. Five percent (5%) Bid Bond was submitted. BID: BASE BID, PHASE 1 Item No. Description Quantity Unit Unit Price Total Amount 1 Base Bid: Furnish all labor, services, materials, insurance & equipment for the Century Center Restoration, Phase One 1 Lump Sum N/A $103,000.00 UNIT PRICING, PHASE 1 Item No. Description Quantity Unit Unit Price Total Amount 2 Base Bid: Provide unit cost(per square foot) for chemical cleaning of all brick surfaces 1 Square Feet 1.10 N/A 3 Base Bid: Provide unit cost(per square foot) for sealing (installation of water repellant) of all brick surfaces 1 Square Feet .74 N/A 4 Base Bid: Provide unit cost (per lineal foot) of all out-of-plumb units restoration at upper parapet horizontal relieving angles on West, South, and East elevations (not including Area “E’) 1 Lineal Foot 87.00 N/A 5 Base Bid: Provide unit cost (per lineal foot) of all out-of-plumb units restoration at lower parapet horizontal relieving angles on West, South, and East elevations (not including Area “E’ 1 Lineal Foot 87.00 N/A 6 Base Bid: Provide unit cost information for additional work not indicated on the construction drawings for additional masonry tuckpointing 1 Square Feet 11.22 N/A 7 Base Bid: Provide unit cost information for the additional work not indicated on the construction drawings for additional new 1 Lineal Foot 12.00 N/A vertical control joints 8 Base Bid: Provide unit cost information for additional work not indicated on the construction drawings for additional major (more than 1/8” wide) masonry cracking/replacement 1 Square Feet 153.00 N/A ALTERNATE BID, PHASE 1 Item No. Description Quantity Unit Unit Price Total Amount 9 Alternate Bid: Provide cast stone caps in lieu of limestone caps at northwest corner planter walls and museum entry walls 1 Lump Sum N/A Deduct 5,000 BASE BID, PHASE 2 Item No. Description Quantity Unit Unit Price Total Amount 10 Furnish all labor, services, materials, insurance and equipment for the Century Center Masonry Restoration, Phase Two 1 Lump Sum N/A 41,000.00 BASE BID (PHASE 1 AND PHASE 2) PLUS ALTERNATE TOTAL AMOUNT: $139,000.00 SLATILE ROOFING & SHEET METAL CO., INC. 1703 South Ironwood South Bend, IN 46613 Bid was signed by: Gerald Longerot Contractor’s Non-Collusion Affidavit, Non-Debarment Affidavit, Certification Regarding Investment with Iran, Employment Eligibility Verification, Non-Discrimination Commitment for Contractors and Certification of Use of United States Steel Products or Foundry Products was submitted. Five percent (5%) Bid Bond was submitted. BID: BASE BID, PHASE 1 Item No. Description Quantity Unit Unit Price Total Amount 1 Base Bid: Furnish all labor, services, materials, insurance & equipment for the Century Center Restoration, Phase One 1 Lump Sum N/A $217,425.00 UNIT PRICING, PHASE 1 Item No. Description Quantity Unit Unit Price Total Amount 2 Base Bid: Provide unit cost(per square foot) for chemical cleaning of all brick surfaces 1 Square Feet 1.80 N/A 3 Base Bid: Provide unit cost(per square foot) for sealing (installation of water repellant) of all brick surfaces 1 Square Feet 1.65 N/A 4 Base Bid: Provide unit cost (per lineal foot) of all out-of-plumb units restoration at upper parapet horizontal relieving angles on West, South, and East elevations (not including Area “E’) 1 Lineal Foot 90.00 N/A 5 Base Bid: Provide unit cost (per lineal foot) of all out-of-plumb units restoration at lower parapet horizontal relieving angles on West, South, and East elevations (not including Area “E’ 1 Lineal Foot 90.00 N/A 6 Base Bid: Provide unit cost information for additional work not indicated on the construction drawings for additional masonry tuckpointing 1 Square Feet 18.00 N/A 7 Base Bid: Provide unit cost information for the additional work not indicated on the construction drawings for additional new vertical control joints 1 Lineal Foot 40.00 N/A 8 Base Bid: Provide unit cost information for additional work not indicated on the construction drawings for additional major (more than 1/8” wide) masonry cracking/replacement 1 Square Feet 210.00 N/A ALTERNATE BID, PHASE 1 Item No. Description Quantity Unit Unit Price Total Amount 9 Alternate Bid: Provide cast stone caps in lieu of limestone caps at northwest corner planter walls and museum entry walls 1 Lump Sum N/A Deduct 3,000 BASE BID, PHASE 2 Item No. Description Quantity Unit Unit Price Total Amount 10 Furnish all labor, services, materials, insurance and equipment for the Century Center Masonry Restoration, Phase Two 1 Lump Sum N/A 36,500.00 BASE BID (PHASE 1 AND PHASE 2) PLUS ALTERNATE TOTAL AMOUNT: $250,925.00