HomeMy WebLinkAboutCENTURY CENTER MASONRY RESTORATION – PROJECT NO. 115-051R
OPENING AND AWARD OF BIDS – CENTURY CENTER MASONRY RESTORATION –
PROJECT NO. 115-051R (HOTEL/MOTEL TAX)
C&S MASONRY RESTORATION LLC-AWARDEE
3725 N. Foundation Ct., Suite AB
South Bend, IN 46628
Bid was signed by: Steve Fields
Contractor’s Non-Collusion Affidavit, Non-Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non-Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
BID:
BASE BID, PHASE 1
Item No. Description Quantity Unit Unit Price Total
Amount
1 Base Bid: Furnish all labor, services,
materials, insurance & equipment for the
Century Center Restoration, Phase One
1 Lump
Sum
N/A $103,000.00
UNIT PRICING, PHASE 1
Item No. Description Quantity Unit Unit Price Total
Amount
2 Base Bid: Provide unit cost(per square foot)
for chemical cleaning of all brick surfaces 1 Square
Feet
1.10 N/A
3 Base Bid: Provide unit cost(per square foot)
for sealing (installation of water repellant)
of all brick surfaces
1 Square
Feet
.74 N/A
4 Base Bid: Provide unit cost (per lineal foot)
of all out-of-plumb units restoration at
upper parapet horizontal relieving angles
on West, South, and East elevations (not
including Area “E’)
1 Lineal
Foot
87.00 N/A
5 Base Bid: Provide unit cost (per lineal foot)
of all out-of-plumb units restoration at
lower parapet horizontal relieving angles on
West, South, and East elevations (not
including Area “E’
1 Lineal
Foot
87.00 N/A
6 Base Bid: Provide unit cost information for
additional work not indicated on the
construction drawings for additional
masonry tuckpointing
1 Square
Feet
11.22 N/A
7 Base Bid: Provide unit cost information for
the additional work not indicated on the
construction drawings for additional new
1 Lineal
Foot
12.00 N/A
vertical control joints
8 Base Bid: Provide unit cost information for
additional work not indicated on the
construction drawings for additional major
(more than 1/8” wide) masonry
cracking/replacement
1 Square
Feet
153.00 N/A
ALTERNATE BID, PHASE 1
Item
No.
Description Quantity Unit Unit Price Total
Amount
9 Alternate Bid: Provide cast stone caps in lieu
of limestone caps at northwest corner planter
walls and museum entry walls
1 Lump
Sum
N/A Deduct 5,000
BASE BID, PHASE 2
Item
No.
Description Quantity Unit Unit Price Total
Amount
10 Furnish all labor, services, materials,
insurance and equipment for the Century
Center Masonry Restoration, Phase Two
1 Lump
Sum
N/A 41,000.00
BASE BID (PHASE 1 AND PHASE 2) PLUS ALTERNATE TOTAL AMOUNT:
$139,000.00
SLATILE ROOFING & SHEET METAL CO., INC.
1703 South Ironwood
South Bend, IN 46613
Bid was signed by: Gerald Longerot
Contractor’s Non-Collusion Affidavit, Non-Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non-Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
BID:
BASE BID, PHASE 1
Item No. Description Quantity Unit Unit Price Total
Amount
1 Base Bid: Furnish all labor, services,
materials, insurance & equipment for the
Century Center Restoration, Phase One
1 Lump
Sum
N/A $217,425.00
UNIT PRICING, PHASE 1
Item No. Description Quantity Unit Unit Price Total
Amount
2 Base Bid: Provide unit cost(per square foot)
for chemical cleaning of all brick surfaces 1 Square
Feet
1.80 N/A
3 Base Bid: Provide unit cost(per square foot)
for sealing (installation of water repellant)
of all brick surfaces
1 Square
Feet
1.65 N/A
4 Base Bid: Provide unit cost (per lineal foot)
of all out-of-plumb units restoration at
upper parapet horizontal relieving angles
on West, South, and East elevations (not
including Area “E’)
1 Lineal
Foot
90.00 N/A
5 Base Bid: Provide unit cost (per lineal foot)
of all out-of-plumb units restoration at
lower parapet horizontal relieving angles on
West, South, and East elevations (not
including Area “E’
1 Lineal
Foot
90.00 N/A
6 Base Bid: Provide unit cost information for
additional work not indicated on the
construction drawings for additional
masonry tuckpointing
1 Square
Feet
18.00 N/A
7 Base Bid: Provide unit cost information for
the additional work not indicated on the
construction drawings for additional new
vertical control joints
1 Lineal
Foot
40.00 N/A
8 Base Bid: Provide unit cost information for
additional work not indicated on the
construction drawings for additional major
(more than 1/8” wide) masonry
cracking/replacement
1 Square
Feet
210.00 N/A
ALTERNATE BID, PHASE 1
Item
No.
Description Quantity Unit Unit Price Total
Amount
9 Alternate Bid: Provide cast stone caps in lieu
of limestone caps at northwest corner planter
walls and museum entry walls
1 Lump
Sum
N/A Deduct 3,000
BASE BID, PHASE 2
Item
No.
Description Quantity Unit Unit Price Total
Amount
10 Furnish all labor, services, materials,
insurance and equipment for the Century
Center Masonry Restoration, Phase Two
1 Lump
Sum
N/A 36,500.00
BASE BID (PHASE 1 AND PHASE 2) PLUS ALTERNATE TOTAL AMOUNT:
$250,925.00