Loading...
HomeMy WebLinkAbout33. 2016 Budget 08-18-15 Public Forum Questions and ResponsesSouth Bend 2016 Civil City Budget — proposed Items of Inauiry needing more information: Requests /questions /inquiries from citizens attending the August 18, 2015, Personnel and Finance Committee meeting held at the Community Form at the LaSalle Branch Library: 1. Public Works How much money is budgeted for street sweeping and street paving and how much can be completed for each? SWEEPING - There is no actual budget dedicated for the street sweeping program. The sweeper operators are paid from the salary account, and sweeper maintenance and disposal fees of the debris come out of the Sewer department operations and maintenance account. In 2014 the disposal fees for debris was $60,449 dollars, and in 2015 the disposal fees are $64,413 dollars so far. The total money budgeted for 2015 disposal fees is $80,000 dollars. Street sweeping continues as long as weather conditions allow and we do not receive freezing temps and accumulating snow. PAVING — There was $980,000 dollars budgeted in 2015 for street paving, which allows approximately 15 to 20 lane miles to be resurfaced. 2. Public Works How often are city streets swept each year? All City streets receive a minimum of three sweepings a year, with designated priority routes receiving up to 6 sweepings a year. Soon after the end of the Winter season, the sweeping program concentrates on the CSO (Combined Sewer Overflow) route to reduce the debris from entering the sewer system and causing a possible reduction in the capacity of the sewer lines. Crews then shift their attention to the main (or snow) routes where a majority of the de -icing materials are applied and the amount of debris is the heaviest. After all main routes are swept, crews begin sweeping residential streets and include the CSO route and main routes in the process. 3. Public Works How often are city streets paved? There is no definitive answer to how long a street will last after it is paved. There are so many variables that can affect the endurance of the asphalt. The climate we live in is the biggest influence, whereas multiple years of harsh winters will have a negative effect on the asphalt condition. Traffic volume is another influence. A main route which carries thousands of vehicles of all sizes and weights daily will fail much sooner than a cul -de -sac which serves possibly 20 vehicles daily. The "average" life span before a City street is paved is 15 to 30 years. 4. Public Works What are the locations of the curbs and sidewalks being addressed this year? What is the status of this project? How many are yet to be done and where? See attached excel spreadsheet (pages 23 -24). Please note that not all Councilmembers have provided us with their allocations. 5. ACC Why is Animal Control holding fund - raising projects this year? Why is that not budgeted? We want to the cut costs for the tax payers of South Bend and increase transparency and public participation through fund raising events. Our friendly partner group, CARE of South Bend, works to supplement costs for emergency animal cases that come into SBACC that would otherwise have to be euthanized, due to the extreme costs associated with major emergency procedures. We would like to be as revenue neutral as possible, therefore, we feel it's important to raise funds through other means, again, to increase funds for emergency care as well as elicit public participation in our growing Animal Care and Control program in South Bend. We are budgeted for "veterinary expenses" and "institutional and medical." The vet expenses fund is for routine procedures and for cases of neglect that require vet assessment or legal necropsies. Things we cannot ask the private partners to cover. Legal cases that may have restitution upon prosecution. The institutional and medical fund is for medical supplies in house. (Vaccinations, first aid supplies for the animals, whole -sale medications, euthanasia solution, etc.) If it were not for the fundraising efforts of CARE and SBACC we would need to add an additional $25,000 to $30,000 to our budget to cover those expenses outside of standard operating practices of SBACC. 6. Public Works Why is water always ponding on South Street? Why is this not addressed despite calling the city? The City Sewer department would handle this request but was not aware of the problem occurring. There is no record of receiving a request in the 311 system. Please provide more precise information as to the exact location on South Street where the ponding is occurring and the problem will be addressed. 7. DCI What is the plan of implementation and timetable for the properties which are now vacant under the City's 1,000 day program? Various departments in the City are in the process of assessing the experience, impact and outcomes of the 1,000 properties in 1,000 days initiative and will be presenting an assessment in a public forum in early December. The date is still being finalized but this will cover both an internal assessment as well as feedback from the community, as well as sharing how that feedback has guided the plans, policies and programs for the next phases. Also, note again that for the most part, neither the City nor local Community Development Corporation's (CDC's), own the properties on which demolitions occurred. Through the State's Good Samaritan Law the City was able to make the emergency demolition orders, where necessary, on private property but these properties are not owned by the City and thus the timetable for their development is hinged upon the ability to obtain the parcels through cooperation with the County in the tax sale process. 8. Public Works How is snow handled by the city in alleys? Since many residents have trash picked up in their alleys, why is the city not making this a priority? Solid Waste has incorporated snow chains for all trash trucks utilizing alleyways. These chains deploy once the truck enters the alley and retract when leaving the alley. Chains help the trucks maneuver in the alleyways when there is measurable snow fall. Solid Waste only plows alleys when the snow fall is too much for the chains to be effective. 9. Public Works Why are the drains on Fellow Street not working, with multiple flooding taking place? As stated in the response to question number 6, Sewer department was not aware of the problem occurring, and there is no record of receiving a request in the 311 system. Please provide more precise information as to the exact location on Fellow Street where the flooding is occurring and the problem will be addressed. 10. DCI With all of the TIF areas, how are other areas not in TIF areas affected by that loss of revenue for needed services? TIF areas capture the net new commercial property tax revenue in an area and thus generate more tax revenue for the City than if the area was not included in the TIF. For example, the Douglas Road Economic Development Area (DREDA) currently generates approximately $329,410 in taxes. If the TIF were closed, then the total revenue to local taxing units would drop by 49% to $167,821 (of which only $4,916 would come to the City). This is due in effect largely to the Circuit Breaker's effect on assessed value and the larger process by which taxes are determined at the State level. 11. IT What is the status of upgrading the cameras /microphones in the Council Chambers? This has been completed as of 10/2/15. New cameras have been installed. Microphone issues typically come from speakers not projecting and standing too far away from the microphone. 12. IT When you call 311 from a cell phone, why does it go to Cook County? Depending on where you call from and the phone carrier, there could be several reasons that the 311 call had been incorrectly routed. If a cell tower outside of city limits picks up the call, it will not come to SB311. If you have Vonage phone service, you must be registered with Vonage 911 for it to route correctly. SB311 can be reached directly at 574 - 233 -0311 and can take the details of the misrouted call. From there we work with the phone carrier of the misrouted call to determine what caused the error and they will fix the issue. 13. Public Works What is the snow removal program for the upcoming winter? The snow removal program for 2015/16 will mirror previous snow removal programs. Crews will begin clearing all main (or snow) routes during a snow event, and continue that effort until all main routes are safe for travel. Once the main routes are cleared, crews will begin clearing all residential streets. The goal for the Street department is to have ALL City streets cleared within 36 hours once the snowfall has stopped. 14. Public Works Why is there not better signage by the railroad tracks near Washington and Camden? When will this be addressed? We are not aware of railroad tracks near Washington and Camden. The City can work with the railroad company to ensure adequate caution signs are installed. What is the specific issue here and where is the specific location? 15. Public Works /DCI /Parks What is the timetable for the Keller Park and Fremont projects? How are you letting residents know? Upgrades currently scheduled for Fremont Park include installing a splash pad sometime prior to next summer. We are not aware of any upcoming major City projects for Keller Park. 16. Public Works Why are there so many pot holes by the train tracks by Bendix and Keller? When will they be fixed? A majority of the railroad crossings throughout South Bend are owned by private corporations. Some of the major corporations who own the railroad crossings are Norfolk /Southern, Canadian National, and Grand Trunk Western. They have the control, authority, and responsibility to maintain the railroad crossings, and could issue fines in the thousands if any work is done (even pothole patching) on their crossings. Billions of dollars in freight are transported yearly, along with hazardous chemicals that would pose a health risk if spilled during a derailment, and that is why the railroad companies are so adamant that they maintain the crossings. The City is able to make repairs within 25 feet of either outside rail, but cannot encroach inside of that zone. Any reports of repairs needed at crossings are reported to the railroad companies. 17. DCI How do you apply to be one of the DTSB ambassadors on Western Avenue? The West Side Main Streets Ambassadors Program for Western Avenue and Lincolnway West is a distinct program from the DTSB Ambassadors. However, the operation of both programs is contracted to Block by Block, a nationally recognized company that creates custom hospitality and safety programs for cities across the United States. Block by Block is responsible for hiring and training local residents as Ambassadors as positions become available. Hiring is done through local general manager Jamie Higginson, who may be reached at (574) 968 -7289 or jhigginson @downtownsouthbend.com. 18. DCI How is the city getting the word out to the residents about the Western Avenue ambassadors and what will they do? The Ambassadors assist merchants, residents, and visitors by providing basic maintenance and safety services and by sharing information. The Ambassadors keep sidewalks free of litter and overgrowth, help maintain plantings in the City's right -of -way, and connect people to available resources. The Ambassadors regularly engage with owners, employees, and customers in the areas they work to promote their services while they gather information on the needs of businesses and residents. The Ambassadors will be distributing written materials describing what they do. Also, the City has promoted the Ambassador Program through news releases and the resulting media coverage. 19. Why are we not seeing diversity in action during budget presentations? How can we continue to talk about diversity but never display it and especially talking about employees of color? The City promotes a diverse workforce, which may not have been apparent at this particular public meeting. During the 13 public meetings on the budget, diverse representatives within the city's departments had the opportunity to present budget details. 20. DCI Based on a recent report about the above subject line initiative, Mayor Pete stated that neighborhood crime has gone down and people have new homes. What were the original bench marks and where did $10 million come from to fund this program? Does that $10 million spent have a multiplier effect? As of 7/31/15, $6,088,948 had been spent and $3,505,169 encumbered. $4,663,910 was spent on demolition with outstanding encumbrances of $2,014,421. $1,425,038 spent on rehab with $1,480,748 in encumbrances. The funding came from a variety of sources including: EDIT; State grants; Federal funds (CDBG; NRSA; NSP; HOME); Loss Recovery; Gift fund (most of which came from UEA to the City); and COIT. The ROI for the project could be determined a variety of ways but perhaps its first worth noting some information on the cost of blight, itself. See the report Vacant Properties: The True Cost to Communities August 2005 www.vacantproperties.org from the National Vacant Properties Campaign highlights a few of the key costs associated with blight: - A study in Austin, Texas found that "blocks with unsecured [vacant buildings] had 3.2 times as many drug calls to police, 1.8 times as many theft calls, and twice the number of violent calls" as blocks without vacant buildings. - A 2001 study in Philadelphia found that houses within 150 feet of a vacant or abandoned property experience a net loss of $7,627 in value. - An Emory University Law School study noted that, "failure of cities to collect even two to four percent of property taxes because of delinquencies and abandonment translates into $3 billion to $6 billion in lost revenues to local governments and school districts annually. The original benchmark or metric was to address 1,000 properties in 1,000 days. It was acknowledged that this was a significant issue beyond the role of the City itself. The City has met that deadline and what is most notable is that 384 houses were repaired by the owner. This represents a significant savings to the City but the full assessment is not complete and would need to include the benefits that will accrue due to projects such as the South Bend Mutual Homes project with 24 new homes being constructed following demolition activities. 21. DCI Did /has our taxbase expanded outside of TIF districts? What private family or individual received tax money to buy or remodel a home? City Assessed Value (AV) grew from $2,210,000,000 in 2014 to $2,262,000,000 in 2015. TIF AV in 2014 was $713,000,000 and decreased to $707,000,000 in 2015. Projections for the 2016 Assessed Value in the Civil City are expected to remain flat and the AV within the TIF Districts to have less than a 1 percent increase to $710,000,000. Projections for future AV by Umbaugh project a modest AV increase in City and TIF AV in 2017 -2019. In 2020, the tax revenues in the City as whole, including the TIF districts, are projected to decline due to the expiration of the St. Joseph County Debt exemption (this is not a decrease in AV, but revenue). A modest increase in AV has upward pressure on overall tax levy and revenues, but most will be lost due to circuit breaker credits, resulting in flat line revenues. Private families or individuals do not receive tax money to buy homes. The City offers several programs to support affordable housing and those programs, such as the South Bend Home Improvement Fund, are funded through Federal Grants such as the Community Development Block Grants rather than local funds. The Vacant to Value program does provide matching assistance up to $10,000 to help cover the costs of bringing a property that is on the Vacant and Abandoned list up to Code. These funds cannot be used for the purchase of the property. The applicant must have title to the property at the time of submission for the grant. The Vacant to Value Grant has been funded through Urban Enterprise Association and there are currently two grantees enrolled in the program. 22. Purchasing How much of this money went to local (MBE /WBE) contractors? Refer to pages 8 -22 of the attached annual report submitted to the Council, as required by the Ordinance on Diversity Purchasing. It outlines the amounts spent with local and regional MWBE's. It is published at year end, therefore the current statistics are for 2014. The total expenditures using local and regional MWBEs was $952,654.56 also like to add the following statistics to support the answer; a. The Ordinance requires us to track only IDOA certified vendors. b. There were a total of 29 certified vendors in St. Joseph County (local) at the time of the report. There were also 29 certified vendors in the counties surrounding St. Joseph County (regional) at the time of the report. Therefore, the eligible pool of vendors to track was a total of 58. 23. DCI There are a number of projected hotel rooms and condos coming to the downtown area what is the demographic report saying to support these developments? A. New businesses B. Economics - Disposable income C. Timeline for peak performance See Zimmerman Volk report forwarded by Scott Ford to Council on 9/28/15. See the report "Local Impact of Home Building: Updated NAHB Estimates" Paul Emrath, Ph.D. National Association of Home Builders Economics and Housing Policy Group, HousingEconomics.com on April 1, 2015. The report summarizes the measured impact of various types of residential construction and rehabilitation. In particular it notes: Similarly, the estimated one -year impacts of building 100 rental apartments are: • $11.7 million in local income, • $2.2 million in taxes and other revenue for local governments, and • 161 local jobs. While the annual ongoing impacts are • $2.6 million in local income, • $503,000 in taxes and other revenue for local governments, and • 44 local jobs. There are approximately 330 new apartments under construction right now in downtown South Bend, and thus to extrapolate on the estimates above, that would suggest an impact of $38.6 million in local income and over 530 jobs in addition to ongoing revenues of $8.58 million and 148 jobs. Qt 'tii r � Y � J City of South Bend Diversity Purchasing &Development 2014 Annual Participation Program Report ADMINISTRATION AND FINANCE DEPARTMENT JANUARY 21, 2015 City of South Bend CONTENT PAGE # ExecutiveoSummary.......................................................................................... ............................... �2@) Internal@&cExternalc'rogram@ Activity .................................................................... ............................... (0 -4@) 20140iversityd 'urchasing@Activity ....................................................................... ............................... (5 U 2014d'urchasingc Statistics ................................................................................... ............................... chi@) Minority@ k@ WomencBusiness& nterprise0irectory .................................................. ............................... @70 Summary @of6ection6@ Workforce@ Cover6heet ........................................................ ............................... c8@) Quote@&cBid@ Solicitation/ Evaluationd' rocess@ Cover6heet ......................................... ............................... c9@) Citymf@ South@ Bendd' urchasingd' rocess ................................................................. ............................... @10 -11 CityamfSouthcBendd 'urchasing&latrix ................................................................... ..............................d 2@) Attachment6heetkover....................................................................................... ............................dI 3@) ontent-t- �- a a a a Page4e d o City of South Bend 2014 ANNUAL PARTICIPATION PROGRAM REPORT EXECUTIVE SUMMARY This 2014 Annual Participation Program Report is filed January 21, 2015 with the City of South Bend Common Council, with copies submitted to Mayor Pete Buttigieg, the City Controller and M /WBE Utilization Board in conformance with the City's Minority and Women Business Enterprise Diversity Development Program, established by Ordinance No. 10081 -11 and adopted, April 23, 2011. The Diversity Development Program in its fourth year of operation has continued to work towards building a strong and sustainable purchasing program that continually provides equal opportunities and inclusion to local and regional M /WBE Business Enterprises. The Diversity Utilization Board along with the Administration and Finance team are the two groups primarily accountable for the operation and management of the program; thus, activities as mandated by the ordinance are included in this report. 14-Annual-Participation Program- Reports@ City of South Bend INTERNAL PROGRAM ACTIVITY • Held meetings with City of South Bend Fiscal Officers and purchasing representatives to review purchasing policies. • Appointment of new Diversity Utilization Board (DUB) for a two year term. • Retirement of Jan Hall, Diveristiy Compliance Officer, on 8/31/2014. • Hired Mandy Gallagher, Diversity Compliance Officer, on 9/23/2014. • Orientation of new DUB members by Valerie Schey, Common Council Chairperson of Personel and Finance Committee. • Presented to the Public Works Department to launch city wide awareness and to initiate training programs for including M /WBEs in the bid /quote process. • Developed a list of local and regional M /WBEs that are certified /non - certified by the IDOA for reference. • Expanded data collection and reporting to consist of inclusion of M /WBEs as of 11/2014. • Expanded data collection and reporting to include doing business with non certified M /WBEs as of 11/2014. • Developed and distributed the first Diversity Newsletter. 2014 EXTERNAL PROGRAM ACTIVITY • Partnered with Notre Dame University School of Business in working with groups of graduate business students in marketing projects. The students developed marketing recommendations for local M /WBEs. • Participated in M /WBE Certification Spring Workshop at St Mary's College in collaboration with the Indiana Department of Administration. Jan Hall presented and displayed "How to do Business with the City of South Bend" at the north central business council at St. Mary's Collge. 14- Annual- Participation-Program- Reports6@) City of South Bend • Maintained memberships in the Indiana Minority Supplier Development Council (IMSDC) and the Women's Business Enterprise National Council (WBENC). Both organizations are dedicated to advancing the success of certified M /WBEs. They provide many resources to members, including online databases with profiles of certified minority and women owned businesses. They also are certifying agencies. Education and training resources are available. • Voluntarily subscribed to diversity supplier newsletters and other related media type that offers education information. • Initiated discussions with the Small Business Association to discuss mutual opportunities for M /WBEs. 2015 will bring greater diversity utilization and programming progress to the City's Diversity Purchasing and Development initiative with the increase of collaboration with internal and external stakeholders. Also, the expansion of data collecting and reporting for 2015 will help the city monitor the progress of it's Diversity Purchasing and Development initiative. 14- Annual- Participation-Program- Reports (4@) City of South Bend 20140iversity4lurchasing @Activity- City amf6outhcBend- IDOACertified@) Business Name City /State MBE Local PO's MBE Local $ WBE Local PO's WBE Local $ MBE Regional PO's MBE Regional $ WBE Regional PO's WBE Regional $ Bolt Document Management Elkhart, IN 1 $3,600 Corporate Graphic Solutions Elkhart, IN 1 $354.84 DLZ Indiana LLC, South Bend, IN 2 $101,042.50 Dudeck Roofing & Sheet Metal South Bend, IN 8 $11,516.60 Emnet, LLC South Bend, IN 2 $66,815.50 Kabelin Ace Hardware LaPorte, IN 12 $5,636.38 McCormick Engineering South Bend, IN 1 $14,000 Office Interiors Granger, IN 28 $11,530.23 On Site Health Solutions South Bend, IN 1 $39.54 Premium Concrete Services Elkhart, IN 1 $401,792.59 Ritschard Bros Inc South Bend, IN 1 $192,844 Sanco Distributing, Inc. South Bend, IN 7 $2,923.41 Stanz Food Services Inc South Bend, IN 18 $20,744.87 Co orate Graphics Elkhart, IN 6 $7,255 Totals 19 $294,857.11 61 $244,795.02 0 $0 9 $413,002.43 * 80Turchaseoorders@brc rontractsaverec mwarded4o4Odocally (iegisteredglDOA) AllWBE4epresentingmwalue @Df(4539,652.aOnd 2 /31 /144here(*vasme total@of@ 29(& 4/ WBEs@ registeredavithdDOA @in6t.4oseph@County4local).@) * 9Turchasemrdersa mr@ rontractscvverecawarded4o @4aegionally4egisteredglDOA)d 41WBEs4epresenting( mwaluemf4413 ,002.0on42 131 1144herecvvas@) a4otala mf42 9c M/ WBEs4egisteredwith4he4DOAdn4he @rountiesc surrounding @St.4oseph@Countyoregional).@) 14- Annual- Participation-Program- Reports 6@) City of South Bend 2014 Purchasinz Statistics Total Purchases Orders issued in 2014 5,977 Total Value ($) Purchase Orders Issued 55,222,161 Total Emergency Purchases Orders Issued 62 14- Annual- Participation-Program- Reports c6@) City of South Bend Minority & Women Business Enterprise Directory (See Attachment #1) 0 Administration and Finance Department John Murphy, City Controller George King, Purchasing Manager Mandy Gallagher, Diversity Compliance Officer 14- Annual- Participation-Program- Reports @9@) a City of South Bend z Summary of Section 3 Workforce Documents (See Attachment #2) If Community Investment Department Scott Ford, Director of Community Investment Pam Meyer, Director II (Community Development) Submittend by: Lory Timmer, Anaylyst II 14- Annual- Participation-Program- Reports ca$U a City of South Bend Quote and Bid Solicitation /Evaluation Process 1. Summary of Purchasing Process 2. Purchasing Matrix Guidelines 3. City of South Bend Purchasing Policy ( SeeAttachment #3) 4. Invitation to Quote (Boilerplate — Attachment 3a) 14- Annual- Participation-Program- Reports (9@) City of South Bend 5. Invitation to Bid (Boilerplate Attachment 3b) CITY OF SOUTH BEND PURCHASING PROCESS SUMMARY The procurement of supplies, equipment and services is governed by the City of South Bend Purchasing Policy (attached). Pricing for supplies, equipment and services is obtained according to a matrix (Bid Matrix) of the total cost. The Bid Matrix (attached) dictates the quote or bid process to be followed and the approval levels required for purchasing approval. Exceptions are made for Special Purchases as defined by Indiana Statutes. An emergency purchase is an example of a Special Purchase situation. 1. Obtaining Quotes For purchases under $74,999, quotes are obtained from vendors specified by the City of South Bend Departments requiring the respective supplies, equipment or services. The following requirements apply; a. Purchases between $25,000 and $74,999 require a formal quote process which includes the completion of the Quote Package (attached). b. Purchases under $25,000 requires a simple quote process as defined in the Bid Matrix. These written quotes can be obtained thru phone requests, email request of written requests. 2. Evaluating Quotes Simple quotes are first evaluated for content to assure that they represent the items or services required at the correct terms and conditions specified by the department. Simple quotes are sorted by price and awarded to lowest price. 14- Annual - Participation- Program - Reports 4 0@ City of South Bend The Formal Quotes are opened at a public Meeting by the Board governing the Department. Formal Quotes are evaluated by the City of South Bend Legal Department to assure the required forms are completed correctly. If the appropriate forms were not correct or were omitted, and /or quoting instructions were not followed, the quote is considered non- responsive. Responsible, responsive quotes are tabulated with the award given to the lowest cost. 3. Obtaining Bids Purchases of $75,000 or more require a formal bid process that includes public advertising of the items or project. A sample bid package is attached. 4. Evaluating Bids The Bids are opened at a public meeting by the Board governing the Department. Bids are evaluated by the City of South Bend Legal Department to assure the required forms are completed correctly. If the appropriate forms were not correct or were omitted, and/ or bidding instructions were not followed, the bid is considered non- responsive. Responsible, responsive bids are tabulated with the award given to the lowest cost. 14-Annual-Participation Program- Reports41 City of South Bend City of South Bend Purchasing Matrix Purchase Order Dollar Value Approvals Required Method Mode Comments /Additional Requirements Less than $2500 Department Approval Preferred Vendor or Phone, Fax, Mail Uses Central Services /Contract Purchasing Approval Open Market Vendor /State QPA/Purchasing Cooperative /Open Market — No Competitive Quote $2500 to $9999 Department Approval Preferred Vendor or Phone, Fax, Mail Uses Central Services /Contract Purchasing Approval Informal Quote on Vendor /State QPA/Purchasing Open Market Cooperative /Open Market — w 2 Informal Quotes $10,000 to $24,000 Department Approval Preferred Vendor or Phone, Fax, Mail Uses Central Services /Contract Purchasing Approval Informal Quote on Vendor /State QPA/Purchasing Open Market Cooperative /Open Market — w/ 3 Informal Quotes $25,000 to $74,999 Department Approval Preferred Vendor or Mailed at least Requires Minimum of Three Purchasing Approval Formal Quote Seven Days prior Written Responses. Opened, Read Approving Board (Written) Quote to Opening at Public Meeting. Award by Process Approving Board Special Purchase Over $49,000 Department Approval Special Purchase of $50,000 or Purchasing Approval more requires Legal Review and Approving Board Board Approval $75,000 or More Department Approval Formal Bid Process Submitted to Formal Bid Process Board opens Purchasing Approval w/ Legal Review and Clerk of Board of Responses and Makes Final Award Approving Board Formal Advertising Public Works or Rejection... oPurchasesanaymot�be(artificiallyadivideddo (avoidTolicy4hresholds.@) @) a Approvingd3oards:@) * AdditionaldZeviews4equireddoroCapital (mnd4Tdtems. @) AllgDurchasesmredimiteddby &udgetmnd@appropriations.0 0 0 0 0 0 0 14- Annual- Partici�0 ation-Program- Reports d 2@) Boardamf4lublicdWorkso Boardamf&arkCommissioners@) RedevelopmentoCommissione City of South Bend ttachment@Sheetkovem Minority@& dVomancBusiness& nterpriseCirectory *Attachement41)@) Summary@of6ection6dNorkforceoAttachment @#2)@) Citya of@ SouthcBenddPurchasingdlolicyoAttachment43 )@) InvitationdoQuotegBoilerplate- Attachmento3a)@) InvitationdocBidoBoilerplate- Attachmentg3b)@) 14- Annual- Particiption-Program- Reports43@) City of South Bend Respectfully Submitted, George King, Purchasing Manager Mandy Gallagher, Diversity Compliance Officer 14- Annual- Partil ation-Program- Reports 44@) Curb & Sidewalk Schedule 2015 Address 1629S Scott retaining wall behind walk, remove drive approach 2014 Property 77.00 70.00 . date 5/21/2015 Completion date 06/11/15 743 Oakside Untonable gas line 2014 Property 57.00 5/26/2015 06/16/15 327 N Hill 2014 Property 30.00 5/28/2015 06/12/15 3214 Salem 1 Stump 99.00 33.00 1 6/3/2015 06/12/15 1314 Chalfant vacant lot 53.00 6/4/2015 06/23/15 302 Walsh left over from 2014 46.00 Add On 06/29/15 1310 Chalfant Sidewalk Only, 28 inch tree 24.00 1 Add On 08/21/15 1322 Chalfant 48.00 6/5/2015 06/23/15 1046 Miner 48" stump 36.00 1 6/10/2015 08/18/15 1119 Miner vacant lot 36.00 6/12/2015 08/21/15 1127 Miner service walk 40.00 6/16/2015 08/21/15 1135 Miner service walk, 1 -32" tree 50.00 1 6/17/2015 08/21/15 1139 Miner 36" stump,service walk 93.00 6/19/2015 08/21/15 1145 Campeau 1 -ADA, 1 -46" tree 55.00 1.00 1 6/23/2015 08/25/15 1217 Campeau Partial Property 20.00 6/23/2015 08/26/15 1221 Campeau Partial Property 30.00 6/23/2015 08/26/15 1225 Campeau 47.00 6/24/2015 08/26/15 1235 Campeau service walk, Drive appproach 78.00 6/30/2015 08/21/15 1321 Campeau large stump 50.00 1 7/3/2015 09/02/15 513 Aurther drive approach,2- ADA 55.00 2.00 7/7/2015 06/25/15 236S Notre Dame 2- ADA 6'W alk 106.00 7/10/2015 EAST BANK 102/106 St Louis service walk, 6' walk 172.00 7/16/2015 07/03/15 212 St Peter drive approach 74.00 7/21/2015 EAST BANK 810 E Wayne 6' Walk 36.00 7/22/2015 EAST BANK 710 E Washington Trip Hazare 6' walk 12.00 7/22/2015 07/03/15 2821 Mishawaka Ave 1- ADA combination curb & walk 139.00 139.00 7/29/2015 08/14/15 1709 Leer 1- 30" tree Disabled resident 95.00 7/31/2015 1605 Leer 4 trees 48 ", 30 ", 28 ",18" Demolition Property? 114.00 114.00 4 8/6/2015 1601 Leer 1 ADA Indiana combination Curb and Sidewalk 162.00 162.00 1.00 8/13/2015 1909 E Calvert combination curb & Sidewalk 38.00 38.00 8/14/2015 07/17/15 1905 E Calvert combination curb & Sidewalk 41.00 41.00 8/19/2015 07/17/15 1901 E Calvert combination curb & Sidewalk 41.00 41.00 8/21/2015 07/17/15 1908 E Calvert combination curb & Sidewalk 40.00 40.00 8/26/2015 07/17/15 1902 E Calvert combination curb & Sidewalk 38.00 38.00 8/28/2015 07/17/15 1332 Dayton 1 -24" tree 1 -stump 45.00 20.00 2 9/3/2015 923 33rd 48.00 40.00 9/4/2015 07/22/15 606S 29th combination curb & Sidewalk 68.00 68.00 9/11/2015 07/28/15 502S 28th 46.00 9/16/2015 07/31/15 1017S 27th 60.00 9/17/2015 08/07/15 753S 25th stump 40.00 1 9/18/2015 07/31/15 713S 24th 15.00 40.00 9/23/2015 08/05/15 Dushane Court 1 -tree 1 -ADA 105.00 105.00 1.00 1 9/29/2015 Anderson 22- drive approach 264.00 2.00 10/2/2015 23 1920 Kessler Storm damage 10.00 1010 Rose Not on list 44.00 37.00 10/8/2015 09/15/15 1016 Rose 1- 22 ",1 -32 "tree 50.00 50.00 2 10/9/2015 09/15/15 1022 Rose Not on list 52.00 52.00 10/15/2015 09/15/15 2213 Hollywood Trees may be OK 1- 26 ",1 -32" 56.00 2 10/16/2015 09/17/15 1845 Brookfield 1 -28 "tree 45.00 1 10/20/2015 09/24/15 1849 Brookfield 1 -48" tree 38.00 1 10/22/2015 09/24/15 1505 Huey 1 -12" tree 45.00 1 10/23/2015 09/24/15 1758 N Olive 18'x11' drive 1- ADA 255.00 252.00 10/30/2015 *In Progress 1013 Yukon 1 -18" tree 7.00 40.00 1 11/4/2015 WITHDRAWN 2101 Berkley Pl. Repair from 2014 45.00 10.00 09/17/15 1091 Riverside 1 -30" tree 100.00 1 11/5/2015 256 Sheridan 60.00 11/6/2015 305S Falcon 36.00 142.00 11/13/2015 110 Lake 2 -36" tree 1- stump 20.00 200.00 3 11/20/2015 218 Pokagon 150.00 11/25/2015 306 Pokagon 40.00 12/1/2015 3646 1 2002.00 1 261 1 EAST BANK - Locations removed due to East Bank Phase 5 Project *SCHEDULED COMPLETION WEEK OF 9/28/15 1013 Yukon, Resident withdrew from program due to Tree 24