HomeMy WebLinkAboutApproving the Contract between Board of Public Works & Safety and Indepedent Concrete Pipe Corp.ORDINANCE No. 3.3 V"-1
Passed by the Common Council of the City of South Bend,
s
Presented by me to the Mayor of the City of South Bend,
Approved and signed by
0610-7
U
Clerk
Of Common Council
Clerk
ORDINANCE NO. 33 �Z�
Be it ordained by the Common Council of the City
of South Bend, Indiana:
SECTION I.
That a Contract entered into by and between the
Board of Public works and Safety, City of South Bend,
Indiana, on the 9th day of September, 1940, by the terms of
which the Independent Concrete Pipe Corporation, Incorporated,
agrees to furnish the City One Hundred Forty (140) Feet,
more or less, of 36" Reinforced Concrete Pipe, American
Society Testing Materials specifications C 76 - Table 1,
at a price of Two & 65/100 (;2.65) Dollars per foot, and
Eleven Hundred Sixty (1160) Feet, more or less, of 36"
Reinforced Concrete Pipe, American society Testing Materials
specifications C 76 - Table 2, at a price of Two & 85/100
0;"2.85) Dollars per foot, a copy of which contract is attached
hereto and marked Exhibit "A ".
Be and the sane is hereby in all dzings confirmed,
ratified and approved.
SECTION II.
This Ordinance shall be in full force and effect
from. ^nd after its
IN & 2nd READING
OOMMITTEE OF THE WNOU
PUBLIC HEARING ,
2rd READING /�llL
NOT APPROVED
REFERRED
PASSED
and approval by the I +iayor.
C O N T R A C T
This agreement entered into by and between the
City of South Bend, by and through its Board of Public V�orks
and Safety, hereinafter referred to as the City, and the
Independent Concrete Pipe Corporation, Incorporated, herein-
after referred to as t he Contractor,
VVITITESSETH:
Thet the Contractor hereby agrees to f urnish to the
City of South Bend One Hundred Forty (140) Feet, more or less,
of Thirty -six inch (36 ") Concrete Pipe, American Society
Testing Materials Standard C 76- Table 1, which pipe is to be
furnished tot he City on or before September 19th, 1940, and
is to be delivered to the North Michigan Street Sewer Project.
The City agrees to pay the Contractor the sum of
Two & 65/100 02.65) Dollars per foot for said pipe within
thirty days after delivery and acceptance.
It is further agreed that the Contractor will
furnish the City of South Bend Eleven Hundred Sixty (1160)
Feet, more or less, of Thirty-six inch (36 ") reinforced
Concrete Pipe, American Society Testing Materials Standard
C 76 - Table 2,a at a price of Two & 85/100 (w2.85) Dollars
per foot. Said pipe to be delivered on the North Tichigan
Street Sewer Project as directed by the City Engineer.
The Contractor agrees to deliver said pipe at the
rate of not less than fifty (50) feet per day, beginning on
23 rd '(C.EwJ
the -G&t4!i day of September, 1940, and continuing until the
entire pipe is delivered.
Payment is to be made by the City of South Bend
within thirty (30) days after delivery and acceptance.
It is agreed by and between the parties that all
pipe must meet specifications herein specified and such
additional specifications as are required by the City Engineer,
City of South Bend, and that no pipe will be accepted or paid
2
for until it has been tested by the City Lngineer, or his
assistants.
In Witness whereof the parties hereto have set their
hands and seals this 9th day of September, 1940.
Attest:
CITY OF SOUTH BEND, INDIANA
INDEPEPdCO N PIPE CORP. INC.
s • '
Sm.l
i.'
14
Attest:
CITY OF SOUTH BEND, INDIANA
INDEPEPdCO N PIPE CORP. INC.