HomeMy WebLinkAbout2013 Local Road and Street ReportState Form 54400 (8 -10) City and Town Form Number 225
Prescribed by State Board of Accounts County Form Number 16
ST JOSEPH COUNTY, INDIANA
CITY OF SOUTH BEND
(City or Town) (Name of Unit)
(City and Town Form 225 Only)
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
(IC 8- 17 -4.1)
FOR THE YEAR ENDED
DECEMBER 31, 2013
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION I - FINANCIAL STATEMENT
Cash and Investments - January 1
Operating Receipts:
Taxes
Intergovernmental
Charges for Services
Operating Transfers In
Other Receipts
Total Operating Receipts
Bonds Proceeds
Other Receipts
Interfund Loan Proceeds
Investments Matured or Sold
Total Receipts
Operating Disbursements:
Highway and Streets
Administration
Maintenance and Repair
Construction and Reconstruction
General Undistributed
Debt Service
Total Operating Disbursements
Other Disbursements
Interfund Loan Payments
Interfund Loans Made
Investments Purchased
Total Disbursements
Excess
Over (Under) Total Disbursements
Cash and Investments - December 31
Motor
Local
Total
Vehicle
Road &
Cumulative
Other
All
Highway
Street
Bridge
Funds
Funds
$2,271,733
$1,714,297
$0
$8,057,622
$12,043,652
2,045,213
0
0
1,078,091
3,123,304
3,006,122
1,001,871
0
0
4,007,993
437,486
0
0
350
437,836
3,626,882
0
0
0
3,626,882
23,421
7,072
0
506,415
536,908
9,139,124
1,008,943
0
1,584,856
11,732,923
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
9,139,124
1,008,943
0
1,584,856
11,732,923
0
404,838
0
650,044
1,054,882
6,441,774
0
0
109,537
6,551,311
1,288,218
377,030
0
1,253,938
2,919,186
0
0
0
0
0
0
0
0
190,461
190,461
7,729,992
781,868
0
2,203,980
10,715,840
950
0
0
0
950
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
7,730,942
781,868
0
2,203,980
10,716,790
0
1,408,182 227,075 0 (619,124) 1,016,133
$3,679,915 $1,941,372 $0 $7,438,498 $13,059,785
Douglas Rd TIF
Major Moves
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION la - DETAIL OF OPERATING RECEIPTS FOR COMMON FUNDS
Motor Local Total of All Total
Vehicle Road & Cumulative Other All
Highway Street Bridge Funds Funds (1)
Operating Receipts:
Taxes, list source((s)
Wheel Tax
Property Tax
Other Taxes
Total Taxes (2)
Distribution from State Auditors Office
Intergovernmental, list source(s)
Gasoline Tax
Major Moves
State Operating Grant
Total Intergovernmental (2)
Charges for Services, list service(s)
Internal Charges for Servies
Traffic Signal Maintenance
Sale of Scrap Metal
Sale of Signs
Total Charges for Services (2)
Other, list source(s)
Interest on Investments
Interfund Operating Transfer
Local Grant
Local Loan
Miscellaneous Reimbursements
Total Other (2)
Total Operating Receipts
Note: 1 From Section lb
2 Totals to Section I
2,045,213
0
0
0
2,045,213
0
0
0
1,078,091
1,078,091
0
0
0
0
0
2,045,213
0
0
1,078,091
3,123,304
3,006,122
1,001,871
0
0
4,007,993
0
0
0
0
0
0
0
0
0
0
3,006,122
1,001,871
0
0
4,007,993
97,551
0
0
0
97,551
324,494
0
0
0
324,494
2,702
0
0
0
2,702
12,739
0
0
350
13,089
437,486
0
0
350
437,836
11,791
6,247
0
26,675
44,713
3,626,882
0
0
0
3,626,882
0
0
0
0
0
0
0
0
0
0
11,630
825
0
479,740
492,195
3,650,303
7,072
0
506,415
4,163,790
9,139,124
1,008,943
0
1,584,856
11,732,923
ANNUAL OPERATIONAL REPORT
109,187
0
0
0
0
0
FOR LOCAL ROADS AND STREETS
1,078,091
0
0
0
0
0
SECTION lb - DETAIL OF OPERATING RECEIPTS FOR OTHER FUNDS
0
0
0
644,965
109,187
0
0
412
430
426
420
324
435
General General
0
DCI
DCI
DCI
DCI
DCI Total
Fund Fund
Major
SSDA #1
Central
SBCDA
Airport
Douglas Road All
Enaineerina T &L
Moves
TIF
Medical TIF
TIF
TIF
TIF Funds(
Operating Receipts:
Taxes, list source((s)
Property Taxes
Other
Total Taxes
Distribution from State Auditors Office
Intergovernmental, list source(s)
Major Moves
Total Intergovernmental
Charges for Services, list service(s)
Sale of Scrap Metal
Sale of Signs
Total Charges for Services
Other, list source(s)
Miscellaneous Reimbursement
Local Grant
Local Loan
Sale Scrap Metal
Interest on Investments
Total Other
Total Operating Receipts (1)
644,965
109,187
0
0
0
0
0
323,939
1,078,091
0
0
0
0
0
0
0
0
0
644,965
109,187
0
0
0
0
0
323,939
1,078,091
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
350
0
0
0
0
0
0
350
0
350
0
0
0
0
0
0
350
5,079
0
474,661
0
0
0
0
0
479,740
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
26,221
0
0
0
0
454
26,675
5,079
0
500,882
0
0
0
0
454
506,415
650,044
109,537
500,882
0
0
0
0
324,393
1,584,856
Note: 1 Totals to Section la; Total of All Other Funds Column
ANNUAL OPERATIONAL REPORI
FOR LOCAL ROADS AND STREETS
SECTION Ila - DETAIL OF OPERATING DISBURSEMENTS OF COMMON FUNDS
Motor
Local
Total of All
Total
Vehicle
Road &
Cumulative
Other
All
Highway
Street
Bridge
Funds(1)
Funds
Administration:
Personal Services
0
0
0
305,681
305,681
Supplies
0
397,338
0
9,607
406,945
Other Services and Charges
0
7,500
0
334,756
342,256
Capital Outlay
0
0
0
0
0
Total Administration (2)
0
404,838
0
650,044
1,054,882
Maintenance and Repair:
Personal Services
3,461,071
0
0
0
3,461,071
Supplies
1,144,000
0
0
108,173
1,252,173
Other Services and Charges
1,740,856
0
0
1,364
1,742,220
Capital Outlay
95,847
0
0
0
95,847
Total Maintenance and Repair (2)
6,441,774
0
0
109,537
6,551,311
Construction and Reconstruction:
Personal Services
0
0
0
0
0
Supplies (Paving /Concrete)
1,288,218
0
0
0
1,288,218
Other Services and Charges
0
0
0
257
257
Capital Outlay
0
377,030
0
1,253,681
1,630,711
Total Construction and Reconstruction (2)
1,288,218
377,030
0
1,253,938
2,919,186
General and Undistributed:
Personal Services
0
0
0
0
0
Supplies
0
0
0
0
0
Other Services and Charges
950
0
0
0
950
Capital Outlay
0
0
0
0
0
Total General and Undistibuted (2)
950
0
0
0
950
Debt Service:
Payments of Principal and Interest (2)
0
0
0
190,461
190,461
Total Operating Disbursements
7,730,942
781,868
0
2,203,980
10,716,790
Note: 1 From Section IIb
2 Totals to Section I
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ilb - DETAIL OF OPERATING DISBURSEMENTS FOR OTHER FUNDS
Debt Service:
Payments of Principal and Interest 0 0 0 0 0 0 0 190,461 190,461
Total Operating Disbursements 650,044 109,537 1,253,681 0 0 0 0 190,718 2,203,980
Note: 1 Totals to Section Ila; Total of All Other Funds Column
General
General
DCI
DCI
DCI
DCI
DCI
Total
Fund
Fund
Major
SSDA #1
Central
SBCDA
Airport
Douglas Road
All
Engineering
T &L
Moves
TIF
Medical TIF
TIF
TIF
TIF
Funds (1)
Administration:
Personal Services
305,681
0
0
0
0
0
0
0
305,681
Supplies
9,607
0
0
0
0
0
0
0
9,607
Other Services and Charges
334,756
0
0
0
0
0
0
0
334,756
Capital Outlay
0
0
0
0
0
0
0
0
0
Total Administration
650,044
0
0
0
0
0
0
0
650,044
Maintenance and Repair:
Personal Services
0
0
0
0
0
0
0
0
0
Supplies
0
108,173
0
0
0
0
0
0
108,173
Other Services and Charges
0
1,364
0
0
0
0
0
0
1,364
Capital Outlay
0
0
0
0
0
0
0
0
0
Total Maintenance and Repair
0
109,537
0
0
0
0
0
0
109,537
Construction and Reconstruction:
Personal Services
0
0
0
0
0
0
0
0
0
Supplies
0
0
0
0
0
0
0
0
0
Other Services and Charges
0
0
0
0
0
0
0
257
257
Capital Outlay
0
0
1,253,681
0
0
0
0
0
1,253,681
Total Construction and Reconstruction
0
0
1,253,681
0
0
0
0
257
1,253,938
General and Undistributed:
Personal Services
0
0
0
0
0
0
0
0
0
Supplies
0
0
0
0
0
0
0
0
0
Other Services and Charges
0
0
0
0
0
0
0
0
0
Capital Outlay
0
0
0
0
0
0
0
0
0
Total General and Undistibuted
0
0
0
0
0
0
0
0
0
Debt Service:
Payments of Principal and Interest 0 0 0 0 0 0 0 190,461 190,461
Total Operating Disbursements 650,044 109,537 1,253,681 0 0 0 0 190,718 2,203,980
Note: 1 Totals to Section Ila; Total of All Other Funds Column
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section II, with additional information on individual projects.
2013 Paving
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
From
Road /Street
To
Road /Street
Length
(ft)
Width
(ft)
C
o
U
m
O
(„)
;
z
O
m
a
t
of
C
•"
'
of
E
E
N
F
U
U)
N
i6
U)
U
1--
a
w
a
Q
m
v
LL
co
0
U
@
E
U
N
@
N
0
¢
a
a
J
Q
a
c
N
_E
W
¢
a
O
U
m
Lafayette St.
Western Ave.
South St.
910
57
X
$ 57,391.33
$ 57,391
Washington St.
St Joseph St.
Main St.
784
46
X
$ 28,799.05
$ 28,799
Bendix St.
Huron
Ford St.
1280
30
X
$ 17,196.78
$ 17,197
Bendix St.
Dunham St.
Sample St.
665
30
X
$ 13,339.51
$ 13,340
Liberty St.
Ford St.
Sample St.
1300
30
X
$ 27,782.56
$ 27,783
Fairway St.
Sample St.
Greenview St.
525
26
X
$ 11,106.58
$ 11,107
Greenview St.
Silver Ln.
Sample St.
800
26
X
$ 18,450.46
$ 18,450
Dorothy St.
Ewing St.
So. to Dead End
178
30
X
$ 4,891.64
$ 4,892
Revere PI.
Kentucky St.
E. to Cul De Sac
500
26
X
$ 7,838.94
$ 7,839
Stull St.
Main St.
Lafayette St.
800
40
X
$ 10,425.09
$ 10,425
Chicago St.
Western Ave.
Ford St.
1300
30
X
$ 29,761.45
$ 29,761
Kaley St.
Fisher St.
Ford St.
1150
30
X
$ 24,391.07
$ 24,391
Fisher St.
Kaley St.
Bendix St.
273
28
X
$ 8,053.58
$ 8,054
Birchwood Ave.
Meadow Ln.
Sample St.
1160
26
X
$ 20,077.59
$ 20,078
Sample St.
Mayflower Rd.
West to 5414
494
50
X
$ 18,458.45
$ 18,458
Kentucky St.
Sample St.
Ford St.
1300
30
X
$ 39,381.04
$ 39,381
Chippewa Dr.
Main St.
West 615 Ft.
1800
40
X
$ 36,362.00
$ 36,362
Berkley PI.
Woodlawn Blvd.
Beverly PI.
1990
30
X
$ 39,252.31
$ 39,252
Inglewood PI.
Lathrop St.
Oakwood St.
912
30
X
$ 17,467.73
$ 17,468
Sheridan Ave.
Ardmore Trl.
Westmore St.
600
60
X
$ 24,795.17
$ 24,795
Eclipse PI.
Elwood Ave.
N. to Dead End
206
30
X
$ 12,655.04
$ 12,655
Portage Ave.
Van Buren Ave.
Yukon Ave.
2169
34
X
$ 55,155.00
$ 55,155
Riverside Dr.
Angela Blvd.
Leland Ave.
2134
1 29
X
$ 58,260.69
$ 58,261
St Joseph St.
St Vincent St.
Napolean St.
440
28
X
$ 8,207.80
$ 8,208
Esther St.
Bader Ave.
McKinley Ave.
895
29
X
$ 22,286.51
$ 22,287
Salem Dr.
Manchester Dr.
Woodcliff Dr.
1140
29
X
$ 21,659.81
$ 21,660
Angela Blvd.
Michigan St.
Pokagon St.
1900
1 36
X
$ 76,480.55
$ 76,481
28th St.
Hastings St.
No. to R.R. Tracks
706
1 30
X
$ 14,451.09
$ 14,451
34th St.
Wall St.
Hastings St.
653
30
X
$ 15,219.30
$ 15,219
Bellevue Ave.
Mishawaka Ave.
Ruskin St.
516
30
X
$ 9,870.02
$ 9,870
Corby Blvd.
Notre Dame Ave.
Niles Ave.
2290
31
X
$ 76,628.19
$ 76,628
Hass Dr.
Kettering Dr.
Rose St.
950
28
X
$ 16,408.38
$ 16,408
Cabot Dr.
Winston Dr.
Renck Dr.
625
28
X
$ 11,883.35
$ 11,883
Renck Dr.
Cabot Dr.
Rose St.
550
30
X
$ 11,088.03
$ 11,088
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
From
Road /Street
To
Road /Street
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
_m
a
t
X,
C
•�
'
�
E
N
F
U
>
N
i6
fn
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
a
a
c
N
_E
L
¢
a
O
U
m
Hastings St.
Ironwood Dr.
24th St.
900
29
X
$ 13,957.39
$ 13,957
31 st St.
Mishawaka Ave.
Wall St.
630
35
X
$ 17,810.88
$ 17,811
Caroline St.
Southbrook Dr.
Ridgedale Rd.
900
29
X
$ 18,089.52
$ 18,090
Woodmont Dr.
Brookmede Dr.
Springbrook Dr.
1200
29
X
$ 23,757.74
$ 23,758
Woodside Blvd.
Twyckenham Dr.
Miami St.
988
40
X
$ 29,664.97
$ 29,665
Finch Dr.
Larkspur Ln.
Fredrickburg Dr.
1412
26
X
$ 25,256.98
$ 25,257
Miami St.
Oakside St.
Ridgedale Rd.
1730
40
X
$ 59,428.87
$ 59,429
Bronson St.
Marietta St.
Lincolnway East
230
41
X
$ 11,022.03
$ 11,022
Honan Dr.
Erskine Manor Hill
W. to Cul De Sac
1960
25
X
$ 25,186.96
$ 25,187
Olivia Cir.
Honan Dr.
Honan Dr.
571
20
X
$ 6,462.65
$ 6,463
Oldham Ct.
Riding Mall
N. to Cul De Sac
348
22
X
$ 4,648.75
$ 4,649
Exeter Ct.
Riding Mall
S. to Cul De Sac
597
22
X
$ 11,073.00
$ 11,073
Donald St.
Columbia St.
Michigan St.
1200
30
X
$ 26,856.60
$ 26,857
Lathrop St.
Portage Ave.
Olive St.
X
$ 21,905.80
$ 21,906
Kessler Blvd.
Woodlawn Blvd.
1903 Kessler Blvd.
X
$ 7,895.01
$ 7,895
Otsego Ave.
Ostemo PI.
Alley Approach
X
I
$ 2,572.08
$ 2,572
Knoblock St.
Voorde Dr.
Lincolnway West
X
$ 9,964.75
$ 9,965
Cleveland Rd.
at Ameritech Dr.
Intersection
X
$ 2,459.55
$ 2,460
Angela Blvd.
at Notre Dame Ave.
Intersection
X
$ 1,710.42
$ 1,710
Washington St.
33rd St.
34th St.
X
I
$ 3,091.75
$ 3,092
Wall St.
28th St.
29th St.
X
$ 3,895.75
$ 3,896
Victoria St.
Fellows St.
St Joseph St.
X
$ 13,780.79
$ 13,781
–1—
F
Ti—
M-11-
I
I
TOTAL MVH FUNDS FOR ROAD /STREET CONSTRUCTION AND RECONSTRUCTION $
$1,205,968
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section II, with additional information on individual projects.
2013 Alley Grading
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
C
o
U
m
O
(„)
;
z
O
m
a
t
W
C
•"
'
W
E
E
N
F
U
U)
N
i6
U)
U
1--
a
w
a
Q
m
v
a
LL
co
0
U
@
E
U
N
@
N
0
¢
a
a
J
Q
a
c
N
_E
W
¢
O
U
m
Foster
1121
SIDE
X
$ 146.04
$ 146
Napoleon
516
SIDE
X
$ 146.04
$ 146
St.Vincent
1006
SIDE
X
$ 146.04
$ 146
Corby
613
SIDE
X
$ 146.04
$ 146
Corby
613
REAR
X
$ 146.04
$ 146
Hill
1020
SIDE
X
$ 146.04
$ 146
Hill
1017
SIDE
X
$ 146.04
$ 146
Talbot
1040
SIDE
X
$ 146.04
$ 146
Talbot
1040
REAR
X
$ 146.04
$ 146
Foster
1121
REAR
X
$ 146.04
$ 146
Ironwood
213
REAR
X
$ 146.04
$ 146
Marine
1741
REAR
X
$ 146.04
$ 146
Milton
1114
SIDE
X
$ 146.04
$ 146.04
$ 146
Calvert
1114
SIDE
X
$ 146
Bowman
1114
SIDE
X
$ 146.04
$ 146
Dubail
1114
SIDE
X
$ 146.04
$ 146
Fox
1112
SIDE
X
$ 146.04
$ 146
Ewing
1112
SIDE
X
$ 146.04
$ 146
Ewing
1112
REAR
I
X
1
$ 146.04
$ 146
Cedar
1237
REAR
X
$ 146.04
$ 146
Cedar
1257
SIDE
X
$ 146.04
$ 146
Cedar
1316
SIDE
X
$ 146.04
$ 146
Cedar
1316
REAR
X
$ 146.04
$ 146
Madison
1438
REAR
X
$ 146.04
$ 146
McKinley
1404
REAR
X
$ 146.04
$ 146
LaSalle
1440
REAR
X
$ 146.04
$ 146
Hawthorne
301
REAR
X
$ 146.04
$ 146
Hawthorne
105
REAR
X
$ 146.04
$ 146
Ellsworth
122
REAR
X
$ 146.04
$ 146
Emerson
916
REAR
X
$ 146.04
$ 146
Emerson
1001
REAR
X
$ 146.04
$ 146
Emerson
1201
SIDE
X
$ 146.04
1 $ 146
Bellevue
1105
REAR
I
X
$ 146.04
$ 146
113ellevue
1105
SIDE
I
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
St.Joe
5116
SIDE
X
$ 146.04
$ 146
South
416
REAR
X
$ 146.04
$ 146
South
416
SIDE
X
$ 146.04
$ 146
Haney
119
REAR
X
$ 146.04
$ 146
Broadway
204
REAR
I X
I
$ 146.04
$ 146
Broadway
514
REAR
X
$ 146.04
$ 146
Broadway
626
REAR
X
$ 146.04
$ 146
Broadway
626
SIDE
X
$ 146.04
$ 146
Ewing
1210
REAR
I X
I
$ 146.04
$ 146.04
$ 146
Broadway
718
REAR
X
$ 146
Broadway
718
SIDE
X
$ 146.04
$ 146
Fellows
1512
SIDE
X
$ 146.04
$ 146
Michigan
1612
SIDE
I X
I
$ 146.04
$ 146
Dubail
529
REAR
X
$ 146.04
$ 146
Marietta
1614
REAR
X
$ 146.04
$ 146
Dale
1617
SIDE
X
$ 146.04
$ 146
Dayton
902
REAR
I X
I
$ 146.04
$ 146
High
2015
REAR
X
$ 146.04
$ 146
Donald
904
SIDE
X
$ 146.04
$ 146
Dale
1914
SIDE
X
$ 146.04
$ 146
Dale
1914
REAR
I X
I
$ 146.04
$ 146
Bowman
834
REAR
X
$ 146.04
$ 146
Bowman
834
SIDE
X
$ 146.04
$ 146
Fox
1002
REAR
X
$ 146.04
$ 146
Ewing
738
REAR
I X
I
$ 146.04
$ 146
Ewing
638
REAR
X
$ 146.04
$ 146
Ewing
302
REAR
X
$ 146.04
$ 146.04
$ 146
Altgeld
635
SIDE
X
$ 146
Ewing
418
REAR
I X
I
$ 146.04
$ 146
Ewing
202
REAR
X
$ 146.04
$ 146
Altgeld
114
REAR
X
$ 146.04
$ 146
Altgeld
114
SIDE
X
$ 146.04
$ 146
Altgeld
702
SIDE
I X
I
$ 146.04
$ 146
Altgeld
702
REAR
X
$ 146.04
$ 146
Victoria
730
REAR
X
$ 146.04
$ 146
Victoria
730
SIDE
X
$ 146.04
$ 146
Victoria
518
REAR
X
$ 146.04
$ 146
Victoria
518
SIDE
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(it)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
Fairview
110
REAR
X
$ 146.04
$ 146
Fairview
302
REAR
X
$ 146.04
$ 146
Fairview
518
REAR
X
$ 146.04
$ 146
Fairview
518
SIDE
X
$ 146.04
$ 146
Oakside
111
REAR
X
$ 146.04
$ 146
Woodside
202
REAR
X
$ 146.04
$ 146
Woodside
302
REAR
X
$ 146.04
$ 146
Donmoyer
202
REAR
X
$ 146.04
$ 146
Addison
3811
REAR
X
$ 146.04
$ 146.04
$ 146
Addison
4011
SIDE
X
$ 146
Eckman
622
SIDE
X
$ 146.04
$ 146
Eckman
622
REAR
X
$ 146.04
$ 146
Eckman
502
REAR
X
$ 146.04
$ 146
Hilde
1611
SIDE
X
$ 146.04
$ 146
Haney
1217
SIDE
X
$ 146.04
$ 146
Haney
1220
SIDE
X
$ 146.04
$ 146
Leer
1506
SIDE
X
$ 146.04
$ 146
Indiana
1223
SIDE
X
$ 146.04
$ 146
Indiana
1223
REAR
X
$ 146.04
$ 146
Dubail
1211
SIDE
X
$ 146.04
$ 146
Leer
1619
REAR
I X
$ 146.04
$ 146
Leer
1619
SIDE
X
$ 146.04
$ 146
LWE
1202
REAR
X
$ 146.04
$ 146
Indiana
1330
REAR
X
$ 146.04
$ 146
Dayton
1352
SIDE
I X
I
$ 146.04
$ 146
Dayton
1352
REAR
X
$ 146.04
$ 146
Bowman
1211
SIDE
X
I $ 146.04
$ 146
Donald
1224
REAR
X
$ 146.04
$ 146
Donald
1224
SIDE
I X
I
$ 146.04
$ 146
Ewing
1111
SIDE
X
$ 146.04
$ 146
Ewing
1111
REAR
X
I $ 146.04
$ 146
Ewing
1311
REAR
X
$ 146.04
$ 146
Ewing
1311
SIDE
I X
I
$ 146.04
$ 146
Ewing
1326
REAR
X
$ 146.04
$ 146
Altgeld
1149
REAR
X
I $ 146.04
$ 146
Altgeld
1150
REAR
X
$ 146.04
$ 146
Altgeld
1150
SIDE
X
$ 146.04
$ 146
Altgeld
1204
REAR
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
W
¢
a
O
U
m
Altgeld
1302
REAR
X
$ 146.04
$ 146
Victoria
1302
REAR
X
$ 146.04
$ 146
Fox
1945
SIDE
X
$ 146.04
$ 146
Fox
1945
REAR
X
$ 146.04
$ 146
Fox
1821
REAR
X
$ 146.04
$ 146
Fox
1821
SIDE
X
$ 146.04
$ 146
Fox
1737
REAR
X
$ 146.04
$ 146
Fox
1649
REAR
X
$ 146.04
$ 146
Fox
1503
REAR
X
$ 146.04
$ 146.04
$ 146
Donald
1505
REAR
X
$ 146
Donald
1675
REAR
X
$ 146.04
$ 146
Donald
1675
SIDE
X
$ 146.04
$ 146
Bowman
1706
REAR
X
$ 146.04
$ 146
Ewing
1902
REAR
X
$ 146.04
$ 146
Ewing
1802
REAR
X
$ 146.04
$ 146
Ewing
1702
REAR
X
$ 146.04
$ 146
Ewing
1602
REAR
I X
I
I $ 146.04
$ 146
Calvert
1824
SIDE
X
$ 146.04
$ 146
Calvert
1823
SIDE
X
$ 146.04
$ 146
Calvert
1823
REAR
X
$ 146.04
$ 146
Calvert
1927
REAR
I X
I
I $ 146.04
$ 146
Arnold
1201
REAR
X
$ 146.04
$ 146
Arnold
725
SIDE
X
$ 146.04
$ 146
Arnold
713.5
SIDE
X
$ 146.04
$ 146
Ford
1212
SIDE
I X
I
I $ 146.04
$ 146
Poland
729
REAR
X
$ 146.04
$ 146
Poland
1338
SIDE
X
$ 146.04
$ 146.04
$ 146
Poland
1320
SIDE
X
$ 146
Walnut
502
REAR
I X
$ 146.04
$ 146
Walnut
505
REAR
X
$ 146.04
$ 146
Harris
415
REAR
X
$ 146.04
$ 146
Harris
501
REAR
X
$ 146.04
$ 146
Pulaski
409
SIDE
I X
$ 146.04
$ 146
Pulaski
433
SIDE
X
$ 146.04
$ 146
Jackson
435
SIDE
X
$ 146.04
$ 146
Jackson
451
REAR
X
$ 146.04
$ 146
Jackson
413
SIDE
X
$ 146.04
$ 146
Brookfield
415
SIDE
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
Grant
415
SIDE
X
$ 146.04
$ 146
Warren
417
SIDE
X
$ 146.04
$ 146
Carlisle
415
SIDE
X
$ 146.04
$ 146
Phillipa
415
SIDE
X
$ 146.04
$ 146
Warren
453
REAR
X
$ 146.04
$ 146
Phillipa
451
REAR
X
$ 146.04
$ 146
Phillipa
437
SIDE
X
$ 146.04
$ 146
Olive
516
SIDE
X
$ 146.04
$ 146
Phillipa
609
REAR
I X
I
$ 146.04
$ 146.04
$ 146
Phillipa
533
SIDE
X
$ 146
Phillipa
701
REAR
X
$ 146.04
$ 146
Meade
502
REAR
X
$ 146.04
$ 146
Monroe
2415
SIDE
I X
I
$ 146.04
$ 146
Monroe
2421
REAR
X
$ 146.04
$ 146
Monroe
2513
REAR
X
$ 146.04
$ 146
Fisher
2614
REAR
X
$ 146.04
$ 146
Fisher
2632
SIDE
I X
I
$ 146.04
$ 146
Monroe
2627
REAR
X
$ 146.04
$ 146
Kaley
417
SIDE
X
$ 146.04
$ 146
Western
2812
REAR
X
$ 146.04
$ 146
Ewing
1710
REAR
I X
I
$ 146.04
$ 146
Homeland
1
SIDE
X
$ 146.04
$ 146
Homeland
10
SIDE
X
$ 146.04
$ 146
Eclipse
1236
REAR
X
$ 146.04
$ 146
Eclipse
1212
SIDE
I X
I
$ 146.04
$ 146
Kemble
1643
REAR
X
$ 146.04
$ 146
Angela
325
REAR
X
$ 146.04
$ 146.04
$ 146
Angela
417
REAR
X
$ 146
Angela
505
SIDE
I X
I
$ 146.04
$ 146
Angela
521
REAR
X
$ 146.04
$ 146
Angela
607
SIDE
X
$ 146.04
$ 146
Angela
631
REAR
X
$ 146.04
$ 146
Angela
717
SIDE
I X
I
$ 146.04
$ 146
Angela
729
REAR
X
$ 146.04
$ 146
Angela
809
REAR
X
$ 146.04
$ 146
Altgeld
546
SIDE
X
$ 146.04
$ 146
Altgeld
702
SIDE
X
$ 146.04
$ 146
Fairview
646
SIDE
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
Fairview
1018
SIDE
X
$ 146.04
$ 146
Fairview
1022
REAR
X
$ 146.04
$ 146
Eckman
622
SIDE
X
$ 146.04
$ 146
Woodside
1022
SIDE
X
$ 146.04
$ 146
Oakside
830
SIDE
X
$ 146.04
$ 146
Victoria
1160
REAR
X
$ 146.04
$ 146
Altgeld
1236
REAR
X
$ 146.04
$ 146
E Fox
1709
REAR
X
$ 146.04
$ 146
Madison
419
SIDE
X
$ 146.04
$ 146.04
$ 146
Madison
419
REAR
X
$ 146
Sancome
419
REAR
X
$ 146.04
$ 146
Lawndale
419
SIDE
X
$ 146.04
$ 146
Portage
419
SIDE
I X
I
$ 146.04
$ 146
Cushing
419
REAR
X
$ 146.04
$ 146
Cushing
419
REAR
X
$ 146.04
$ 146
Cottage Grove
419
REAR
X
$ 146.04
$ 146
Cottage Grove
419
REAR
I X
I
$ 146.04
$ 146
LWW
1003
REAR
X
$ 146.04
$ 146
Harrison
619
REAR
X
$ 146.04
$ 146
Harrison
901
SIDE
X
$ 146.04
$ 146
Sherman
1030
REAR
I X
I
$ 146.04
$ 146
Scott
527
SIDE
X
$ 146.04
$ 146
Cottage Grove
711
REAR
X
$ 146.04
$ 146
Cottage Grove
823
REAR
X
$ 146.04
$ 146
Allen
901
SIDE
I X
I
$ 146.04
$ 146
Lawndale
830
REAR
X
$ 146.04
$ 146
Lawndale
736
REAR
X
$ 146.04
$ 146.04
$ 146
Lamonte
430
SIDE
X
$ 146
Forest
812
REAR
I X
I
$ 146.04
$ 146
Golden
914
SIDE
X
$ 146.04
$ 146
Golden
906
REAR
X
$ 146.04
$ 146
Portage
1030
REAR
X
$ 146.04
$ 146
Portage
1102
REAR
I X
I
$ 146.04
$ 146
Woodward
1232
REAR
X
$ 146.04
$ 146
Ostemo
657
SIDE
X
$ 146.04
$ 146
Marquette
614
REAR
X
$ 146.04
$ 146
Marquette
752
REAR
X
$ 146.04
$ 146
Prast
2019
SIDE
1 $ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
;
z
C
O
m
a
t
of
C
•�
�'
of
E
N
F
U
in
>
i6
fn
U
i.-
w
Q
m
v
LL
5
@
c
U
N
u
N
0
Q
a
a
w
Q
a
c
N
E
_
W
Q
I
O
U
m
Meade
1418
REAR
X
$ 146.04
$ 146
Meade
1522
REAR
X
$ 146.04
$ 146
Wilber
1421
REAR
X
$ 146.04
$ 146
Wilber
153
REAR
X
$ 146.04
$ 146
Angela
833
REAR
X
$ 146.04
$ 146
Angela
717
REAR
X
$ 146.04
$ 146
Angela
717
SIDE
X
$ 146.04
$ 146
Angela
549
REAR
X
$ 146.04
$ 146
Angela
607
REAR
X
$ 146.04
$ 146.04
$ 146
Angela
607
SIDE
X
$ 146
Angela
709
SIDE
X
$ 146.04
$ 146
Angela
709
REAR
X
$ 146.04
$ 146
Beale
613
SIDE
X
$ 146.04
$ 146
23rd
617
REAR
X
$ 146.04
$ 146
23rd
601
SIDE
X
$ 146.04
$ 146
Ostemo
627
REAR
X
$ 146.04
$ 146
Carlisle
1624
REAR
X
$ 146.04
$ 146
24th
601
SIDE
X
$ 146.04
$ 146
Rockne
1322
REAR
X
$ 146.04
$ 146
Hollywood
2176
REAR
X
$ 146.04
$ 146
Hollywood
2240
REAR
X
$ 146.04
$ 146
Colfax
923
REAR
X
$ 146.04
$ 146
Colfax
839
REAR
X
$ 146.04
$ 146
LaSalle
1047
SIDE
X
$ 146.04
$ 146
Harrison
425
REAR
X
$ 146.04
$ 146
Harrison
505
SIDE
X
$ 146.04
$ 146
Harrison
515
REAR
X
$ 146.04
$ 146.04
$ 146
Harrison
507
SIDE
X
$ 146
Beale
925
REAR
X
$ 146.04
$ 146
Beale
925
SIDE
X
$ 146.04
$ 146
Beale
821
SIDE
X
$ 146.04
$ 146
Beale
821
REAR
X
$ 146.04
$ 146
Bryon
829
REAR
X
$ 146.04
$ 146
Bryon
829
SIDE
X
$ 146.04
$ 146
Bryon
929
REAR
X
$ 146.04
$ 146
Bryon
1133
REAR
X
$ 146.04
$ 146
Oak
731
SIDE
X
$ 146.04
$ 146
Allen
425
SIDE
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
W
¢
a
O
U
m
Diamond
629
SIDE
X
$ 146.04
$ 146
Diamond
645
REAR
X
$ 146.04
$ 146
LWW
1318
REAR
X
$ 146.04
$ 146
LWW
1402
REAR
X
$ 146.04
$ 146
Iww
1518
SIDE
X
$ 146.04
$ 146
LWW
702
REAR
X
$ 146.04
$ 146
Walnut
306
REAR
X
$ 146.04
$ 146
Walnut
420
REAR
X
$ 146.04
$ 146
Walnut
526
REAR
X
$ 146.04
$ 146.04
$ 146
Walnut
517
SIDE
X
$ 146
Bertrand
2013
REAR
X
$ 146.04
$ 146
Bertrand
2117
REAR
X
$ 146.04
$ 146
Angela
801
SIDE
I X
I
$ 146.04
$ 146
Angela
810
SIDE
X
$ 146.04
$ 146
Johnson
1419
REAR
X
$ 146.04
$ 146
King
1314
REAR
X
$ 146.04
$ 146
Birdsall
218
REAR
I X
I
$ 146.04
$ 146
Hine
1314
SIDE
X
$ 146.04
$ 146
Brookfield
844
REAR
X
$ 146.04
$ 146
Brookfield
847
REAR
X
$ 146.04
$ 146
Birdsall
401
SIDE
I X
I
$ 146.04
$ 146
Florence
1602
REAR
X
$ 146.04
$ 146
Linden
1901
REAR
X
$ 146.04
$ 146
Johnson
321
SIDE
X
$ 146.04
$ 146
Johnson
309
REAR
I X
I
$ 146.04
$ 146
Kenwood
2001
REAR
X
$ 146.04
$ 146
Kenwood
2115
REAR
X
$ 146.04
$ 146
Kenwood
2325
REAR
X
$ 146.04
$ 146
Kenwood
2205
REAR
I X
I
$ 146.04
$ 146
Bertrand
2321
REAR
X
$ 146.04
$ 146
Bertrand
2205
REAR
X
$ 146.04
$ 146
Orange
2501
REAR
X
$ 146.04
$ 146
Orange
2517
SIDE
I X
I
$ 146.04
$ 146
Linden
2503
REAR
X
$ 146.04
$ 146
Linden
2519
SIDE
X
I $ 146.04
$ 146
Longley
2317
REAR
X
$ 146.04
$ 146
Huey
727
SIDE
X
$ 146.04
$ 146
Olive
802
REAR
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
Elmer
829
REAR
X
$ 146.04
$ 146
Elmer
921
REAR
X
$ 146.04
$ 146
Elmer
916
REAR
X
$ 146.04
$ 146
Elmer
838
SIDE
X
$ 146.04
$ 146
Elmer
826
REAR
X
$ 146.04
$ 146
Elmer
920
SIDE
X
$ 146.04
$ 146
Prast
2629
SIDE
X
$ 146.04
$ 146
Prast
2601
REAR
X
$ 146.04
$ 146
Prast
2729
REAR
X
$ 146.04
$ 146.04
$ 146
Fredrickson
2701
SIDE
X
$ 146
Fredrickson
2917
REAR
X
$ 146.04
$ 146
Fredrickson
2805
REAR
X
$ 146.04
$ 146
Fredrickson
3029
SIDE
X
$ 146.04
$ 146
Fredrickson
2922
REAR
X
$ 146.04
$ 146
Fredrickson
2802
REAR
X
$ 146.04
$ 146
Prast
3029
SIDE
X
$ 146.04
$ 146
Bonds
3002
REAR
X
$ 146.04
$ 146
Bonds
2901
REAR
X
$ 146.04
$ 146
Elliott
1047
REAR
X
$ 146.04
$ 146
Goodland
1215
REAR
X
$ 146.04
$ 146
Elliott
1212
REAR
I X
$ 146.04
$ 146
Humboldt
2805
REAR
X
$ 146.04
$ 146
Eclipse
1212
SIDE
X
$ 146.04
$ 146
Eclipse
1248
REAR
X
$ 146.04
$ 146
Kaley
1248
REAR
I X
I
$ 146.04
$ 146
Meade
1302
REAR
X
$ 146.04
$ 146
Elmer
1031
SIDE
X
$ 146.04
$ 146.04
$ 146
Elmer
1053
REAR
X
$ 146
Elmer
1102
REAR
I X
I
$ 146.04
$ 146
Huey
1150
REAR
X
$ 146.04
$ 146
Brookfield
1102
REAR
X
$ 146.04
$ 146
College
1106
REAR
X
$ 146.04
$ 146
Brookfield
1046
REAR
I X
I
$ 146.04
$ 146
Brookfield
1026
SIDE
X
$ 146.04
$ 146
College
1002
REAR
X
$ 146.04
$ 146
College
1022
SIDE
X
$ 146.04
$ 146
Adams
1006
REAR
X
$ 146.04
$ 146
Adams
818
SIDE
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
Adams
926
REAR
X
$ 146.04
$ 146
Blaine
1202
REAR
X
$ 146.04
$ 146
King
1338
REAR
X
$ 146.04
$ 146
Medora
1621
REAR
X
$ 146.04
$ 146
Adams
1602
REAR
X
$ 146.04
$ 146
Adams
1414
REAR
X
$ 146.04
$ 146
Adams
1530
REAR
X
$ 146.04
$ 146
Wilbur
1417
SIDE
X
$ 146.04
$ 146
O'Brien
1415
REAR
X
$ 146.04
$ 146.04
$ 146
O'Brien
1525
REAR
X
$ 146
O'Brien
1605
REAR
X
$ 146.04
$ 146
Huey
1609
REAR
X
$ 146.04
$ 146
N Olive
1602
REAR
X
$ 146.04
$ 146
N Olive
1712
REAR
X
$ 146.04
$ 146
26th
513
REAR
X
$ 146.04
$ 146
26th
525
SIDE
X
$ 146.04
$ 146
26th
617
REAR
X
$ 146.04
$ 146
25th
729
SIDE
X
$ 146.04
$ 146
25th
844
SIDE
X
$ 146.04
$ 146
26th
846
SIDE
X
$ 146.04
$ 146
26th
826
REAR
I X
$ 146.04
$ 146
28th
725
SIDE
X
$ 146.04
$ 146
28th
709
REAR
X
$ 146.04
$ 146
28th
834
REAR
X
$ 146.04
$ 146
28th
621
REAR
I X
I
$ 146.04
$ 146
28th
601
SIDE
X
$ 146.04
$ 146
28th
29th
509
REAR
X
I $ 146.04
$ 146.04
$ 146
845
SIDE
X
$ 146
29th
505
REAR
I X
I
$ 146.04
$ 146
29th
529
SIDE
X
$ 146.04
$ 146
29th
615
REAR
X
I $ 146.04
$ 146
30th
725
SIDE
X
$ 146.04
$ 146
30th
713
REAR
I X
I
$ 146.04
$ 146
29th
830
REAR
X
$ 146.04
$ 146
31 st
817
REAR
X
I $ 146.04
$ 146
30th
842
SIDE
X
$ 146.04
$ 146
Mishawaka
3616
REAR
X
$ 146.04
$ 146
36th
938
REAR
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
34th
1019
REAR
X
$ 146.04
$ 146
34th
1121
REAR
X
$ 146.04
$ 146
32nd
1230
REAR
X
$ 146.04
$ 146
32nd
1322
REAR
X
$ 146.04
$ 146
32nd
1214
SIDE
X
$ 146.04
$ 146
31st
1106
SIDE
X
$ 146.04
$ 146
31 st
1012
REAR
X
$ 146.04
$ 146
31 st
1102
REAR
X
$ 146.04
$ 146
32nd
915
SIDE
X
$ 146.04
$ 146.04
$ 146
32nd
933
REAR
X
$ 146
30th
1011
REAR
X
$ 146.04
$ 146
28th
1010
SIDE
X
$ 146.04
$ 146
28th
1022
REAR
X
$ 146.04
$ 146
26th
1102
SIDE
X
$ 146.04
$ 146
26th
1009
REAR
X
$ 146.04
$ 146
26th
1023
SIDE
X
$ 146.04
$ 146
26th
1115
REAR
X
$ 146.04
$ 146
25th
1208
REAR
X
$ 146.04
$ 146
Angela
102
REAR
X
$ 146.04
$ 146
Pokagon
408
REAR
X
$ 146.04
$ 146
Napoleon
410
REAR
I X
I
$ 146.04
$ 146
Napoleon
418
REAR
X
$ 146.04
$ 146
Napoleon
422
SIDE
X
I $ 146.04
$ 146
St.Peters
1116
SIDE
X
$ 146.04
$ 146
St.Louis
1018
SIDE
I X
I
$ 146.04
$ 146
St.Louis
1028
REAR
X
$ 146.04
$ 146
Angela
208
REAR
X
$ 146.04
$ 146.04
$ 146
Angela
310
REAR
X
$ 146
Peashway
305
REAR
I X
I
$ 146.04
$ 146
Peashway
201
REAR
X
$ 146.04
$ 146
Peashway
115
REAR
X
$ 146.04
$ 146
Napoleon
315
REAR
X
$ 146.04
$ 146
Napoleon
405
REAR
I X
I
$ 146.04
$ 146
Howard
1228
SIDE
X
$ 146.04
$ 146
Corby
1245
REAR
X
$ 146.04
$ 146
Corby
1346
REAR
X
$ 146.04
$ 146
Bartlett
210
REAR
X
$ 146.04
$ 146
Riverside
715
REAR
X
$ 146.04
1 $ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
Riverside
617
REAR
X
$ 146.04
$ 146
Navarre
221
REAR
X
$ 146.04
$ 146
Navarre
218
REAR
X
$ 146.04
$ 146
St.Louis
720
REAR
X
$ 146.04
$ 146
South Bend
725
REAR
X
$ 146.04
$ 146
Frances
618
REAR
X
$ 146.04
$ 146
Frances
724
REAR
X
$ 146.04
$ 146
St.Louis
122
SIDE
X
$ 146.04
$ 146
St.Louis
130
REAR
X
$ 146.04
$ 146.04
$ 146
Corby
1326
SIDE
X
$ 146
Chalfant
1322
SIDE
X
$ 146.04
$ 146
Chalfant
1338
REAR
X
$ 146.04
$ 146
Chalfant
1234
REAR
X
$ 146.04
$ 146
Chalfant
1222
SIDE
X
$ 146.04
$ 146
Chalfant
1134
REAR
X
$ 146.04
$ 146
Chalfant
1122
SIDE
X
$ 146.04
$ 146
Sorin
1136
REAR
X
$ 146.04
$ 146
Sorin
1218
REAR
X
$ 146.04
$ 146
Sorin
1342
REAR
X
$ 146.04
$ 146
Minor
1314
REAR
X
$ 146.04
$ 146
Sorin
1414
REAR
I X
$ 146.04
$ 146
Minor
1336
REAR
X
$ 146.04
$ 146
Minor
1142
REAR
X
$ 146.04
$ 146
Walsh
414
SIDE
X
$ 146.04
$ 146
Walsh
426
SIDE
I X
I
$ 146.04
$ 146
Sunnyside
423
REAR
X
$ 146.04
$ 146
Madison
1417
REAR
X
$ 146.04
$ 146
McKinley
1333
REAR
X
$ 146.04
$ 146
Colfax
1317
SIDE
I X
I
$ 146.04
$ 146
Colfax
1327
REAR
X
$ 146.04
$ 146
Ironwood
117
REAR
X
$ 146.04
1 $ 146
Mishawaka
1347
REAR
X
$ 146.04
$ 146
Mishawaka
1425
REAR
I X
I
$ 146.04
$ 146
Wall
1421
REAR
X
$ 146.04
$ 146
Wall
1333
REAR
X
$ 146.04
$ 146
Emerson
805
REAR
X
$ 146.04
$ 146
Twyckenham
729
REAR
X
$ 146.04
$ 146
Mishawaka
1616
REAR
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
Mishawaka
1520
REAR
X
$ 146.04
$ 146
Mishawaka
1437
SIDE
X
$ 146.04
$ 146
Mishawaka
1363
SIDE
X
$ 146.04
$ 146
Roberts
830
REAR
X
$ 146.04
$ 146
21 st
1013
REAR
X
$ 146.04
$ 146
21st
1102
SIDE
X
$ 146.04
$ 146
River
553
REAR
X
$ 146.04
$ 146
Michigan
702
SIDE
X
$ 146.04
$ 146
Tuft
121
SIDE
X
$ 146.04
$ 146
Broadway
713
REAR
X
$ 146.04
$ 146
Broadway
605
REAR
X
$ 146.04
$ 146
Broadway
721
SIDE
X
$ 146.04
$ 146
Broadway
613
SIDE
I X
I
I $ 146.04
$ 146
Broadway
533
REAR
X
$ 146.04
$ 146
Broadway
513
SIDE
X
$ 146.04
$ 146
Chalfant
1518
REAR
X
$ 146.04
$ 146
Michigan
1514
REAR
I X
I
I $ 146.04
$ 146
Haney
122
REAR
X
$ 146.04
$ 146
Virgina
1533
SIDE
X
$ 146.04
$ 146
Virgina
1525
REAR
X
$ 146.04
$ 146
Virgina
1519
SIDE
I X
I
I $ 146.04
$ 146
Miami
1323
REAR
X
$ 146.04
$ 146
Miami
1417
REAR
X
$ 146.04
$ 146
Indiana
709
REAR
X
$ 146.04
$ 146
Indiana
717
SIDE
I X
I
I $ 146.04
$ 146
Haney
622
SIDE
X
$ 146.04
$ 146
Haney
612
REAR
X
$ 146.04
$ 146.04
$ 146
Indiana
718
SIDE
X
$ 146
Dubail
620
REAR
I X
$ 146.04
$ 146
Dayton
218
REAR
X
$ 146.04
$ 146
Dubail
522
REAR
X
$ 146.04
$ 146
Dayton
602
REAR
X
$ 146.04
$ 146
Dayton
524
REAR
I X
I
$ 146.04
$ 146
Dayton
618
SIDE
X
$ 146.04
$ 146
Bowman
235
REAR
X
$ 146.04
$ 146
Bowman
129
REAR
X
$ 146.04
$ 146
Donald
114
SIDE
X
$ 146.04
$ 146
Donald
120
REAR
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
Donald
234
REAR
X
$ 146.04
$ 146
Fox
320
REAR
X
$ 146.04
$ 146
Fox
222
REAR
X
$ 146.04
$ 146
Ewing
917
REAR
X
$ 146.04
$ 146
Ewing
823
REAR
X
$ 146.04
$ 146
Ewing
811
SIDE
X
$ 146.04
$ 146
Ewing
901
SIDE
X
$ 146.04
$ 146
Altgeld
1021
SIDE
X
$ 146.04
$ 146
Altgeld
1015
REAR
I X
I
$ 146.04
$ 146.04
$ 146
Ewing
522
REAR
X
$ 146
Ewing
604
REAR
X
$ 146.04
$ 146
Altgeld
545
SIDE
X
$ 146.04
$ 146
Altgeld
222
REAR
I X
I
$ 146.04
$ 146
Erskine
2413
REAR
X
$ 146.04
$ 146
Victoria
1013
REAR
X
$ 146.04
$ 146
Victoria
1021
SIDE
X
$ 146.04
$ 146
Fairview
921
REAR
I X
I
$ 146.04
$ 146
Fairview
817
REAR
X
$ 146.04
$ 146
Fairview
901
SIDE
X
$ 146.04
$ 146
Victoria
410
REAR
X
$ 146.04
$ 146
Victoria
314
REAR
I X
I
$ 146.04
$ 146
Irvington
1021
SIDE
X
$ 146.04
$ 146
Irvington
1009
REAR
X
$ 146.04
$ 146
High
2601
REAR
X
$ 146.04
$ 146
Fairview
830
SIDE
I X
I
$ 146.04
$ 146
Fairview
914
REAR
X
$ 146.04
$ 146
Fairview
822
REAR
X
$ 146.04
$ 146.04
$ 146
Irvington
124
REAR
X
$ 146
Irvington
222
REAR
I X
I
$ 146.04
$ 146
Michigan
3114
SIDE
X
$ 146.04
$ 146
Michigan
3106
REAR
X
$ 146.04
$ 146
Michigan
3218
REAR
X
$ 146.04
$ 146
Michigan
3210
SIDE
I X
I
$ 146.04
$ 146
Addison
3521
REAR
X
$ 146.04
$ 146
Addison
3615
REAR
X
$ 146.04
$ 146
Addison
3711
REAR
X
$ 146.04
$ 146
Brookfield
1330
REAR
X
$ 146.04
$ 146
Brookfield
1316
SIDE
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
Oakside
918
REAR
X
$ 146.04
$ 146
Woodside
901
SIDE
X
$ 146.04
$ 146
Oakside
1022
SIDE
X
$ 146.04
$ 146
30th
601
REAR
X
$ 146.04
$ 146
30th
521
REAR
X
$ 146.04
$ 146
30th
529
SIDE
X
$ 146.04
$ 146
Donmoyer
905
REAR
X
$ 146.04
$ 146
Donmoyer
901
SIDE
X
$ 146.04
$ 146
Donmoyer
815
REAR
I X
I
$ 146.04
$ 146.04
$ 146
Dayton
1211
SIDE
X
$ 146
Dayton
1219
SIDE
X
$ 146.04
$ 146
Dubail
1216
REAR
X
$ 146.04
$ 146
Dubail
1312
SIDE
I X
I
$ 146.04
$ 146
Dubail
1320
REAR
X
$ 146.04
$ 146
Dubail
1313
SIDE
X
$ 146.04
$ 146
Dubail
1319
REAR
X
$ 146.04
$ 146
Dayton
1335
REAR
I X
I
$ 146.04
$ 146
Dayton
1401
SIDE
X
$ 146.04
$ 146
Randolph
1215
REAR
X
$ 146.04
$ 146
Twyckenham
1705
REAR
X
$ 146.04
$ 146
Milton
1126
REAR
I X
I
$ 146.04
$ 146
Ford
2414
SIDE
X
$ 146.04
$ 146
Ford
2514
SIDE
X
$ 146.04
$ 146
Ford
2614
SIDE
X
$ 146.04
$ 146
Ford
2630
SIDE
I X
I
$ 146.04
$ 146
Kaley
709
REAR
X
$ 146.04
$ 146
Bendix
735
REAR
X
$ 146.04
$ 146.04
$ 146
Liberty
721
REAR
X
$ 146
Dundee
731
REAR
I X
I
$ 146.04
$ 146
Liberty
518
REAR
X
$ 146.04
$ 146
Liberty
610
REAR
X
$ 146.04
$ 146
Lake
725
REAR
X
$ 146.04
$ 146
Kentucky
524
REAR
I X
I
$ 146.04
$ 146
Kentucky
612
REAR
X
$ 146.04
$ 146
Kenmore
735
REAR
X
$ 146.04
$ 146
Willington
525
REAR
X
$ 146.04
$ 146
Willington
609
REAR
X
$ 146.04
$ 146
Illinois
513
REAR
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
C
(„)
;
z
C
O
(6
a
t
of
C
•V
�'
of
E
N
F
U
in
>
(6
fn
E
i.-
w
Q
m
v
LL
U
N
c
U
N
U
N
0
2
Q
a
a
J
Q
a
c
N
_E
L
Q
I
O
U
m
Illinois
605
REAR
X
$ 146.04
$ 146
Lake
749
REAR
X
$ 146.04
$ 146
Albert
733
REAR
X
$ 146.04
$ 146
Albert
821
REAR
X
$ 146.04
$ 146
Gladstone
836
REAR
X
$ 146.04
$ 146
Gladstone
718
REAR
X
$ 146.04
$ 146
Caroline
1811
REAR
X
$ 146.04
$ 146
Caroline
1705
REAR
X
$ 146.04
Is 146
Caroline
1733
REAR
X
$ 146.04
$ 146.04
$ 146
Calvert
1615
SIDE
X
$ 146
Randolph
1619
REAR
X
$ 146.04
$ 146
Randolph
1615
SIDE
X
$ 146.04
$ 146
Caroline
1617
REAR
X
$ 146.04
$ 146
Caroline
1625
SIDE
X
$ 146.04
$ 146
Webster
820
SIDE
X
$ 146.04
$ 146
Webster
830
SIDE
X
$ 146.04
$ 146
Webster
838
REAR
X
$ 146.04
$ 146
Arnold
829
SIDE
X
$ 146.04
$ 146
Grace
1224
REAR
X
$ 146.04
$ 146
Grace
1306
REAR
X
$ 146.04
$ 146
Ford
1332
SIDE
X
$ 146.04
$ 146
Ford
1318
SIDE
X
$ 146.04
$ 146
Ford
1312
REAR
X
$ 146.04
$ 146
Dunham
1529
SIDE
X
$ 146.04
$ 146
Dunham
1525
REAR
X
$ 146.04
$ 146
Dunham
1513
SIDE
X
$ 146.04
$ 146
Sample
2017
SIDE
X
$ 146.04
$ 146.04
$ 146
Sample
2009
REAR
X
$ 146
Sample
1619
REAR
X
$ 146.04
$ 146
Sample
1517
SIDE
I
X
$ 146.04
$ 146
Walnut
729
SIDE
X
$ 146.04
$ 146
Walnut
717
SIDE
X
$ 146.04
$ 146
Kosciuszko
509
REAR
X
$ 146.04
$ 146
Kosciuszko
523
SIDE
I
X
$ 146.04
$ 146
Kosciuszko
601
SIDE
X
$ 146.04
$ 146
Kosciuszko
613
REAR
X
$ 146.04
$ 146
Pulaski
515
REAR
X
$ 146.04
$ 146
Pulaski
526
SIDE
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
W
¢
a
O
U
m
Pulaski
535
SIDE
X
$ 146.04
$ 146
Pulaski
617
REAR
X
$ 146.04
$ 146
Grant
738
REAR
X
$ 146.04
$ 146
Jackson
511
REAR
X
$ 146.04
$ 146
Jackson
815
SIDE
X
$ 146.04
$ 146
Jackson
609
REAR
X
$ 146.04
$ 146
Brookfield
517
REAR
X
$ 146.04
$ 146
Brookfield
611
REAR
X
$ 146.04
$ 146
Brookfield
714
REAR
X
$ 146.04
$ 146.04
$ 146
Grant
423
REAR
X
$ 146
Elwood
2307
SIDE
X
$ 146.04
$ 146
Olive
1522
REAR
X
$ 146.04
$ 146
Warren
614
REAR
X
$ 146.04
$ 146
Warren
522
REAR
X
$ 146.04
$ 146
Warren
716
REAR
X
$ 146.04
$ 146
Carlisle
722
REAR
X
$ 146.04
$ 146
Warren
609
REAR
X
$ 146.04
$ 146
Warren
525
REAR
X
$ 146.04
$ 146
Carlisle
619
REAR
X
$ 146.04
$ 146
Carlisle
513
REAR
X
$ 146.04
$ 146
Carlisle
727
REAR
I X
$ 146.04
$ 146
Dunham
2511
REAR
X
$ 146.04
$ 146
Dunham
2505
SIDE
X
$ 146.04
$ 146
Dunham
2423
REAR
X
$ 146.04
$ 146
Dunham
2414
REAR
I X
I
$ 146.04
$ 146
Dunham
2510
SIDE
X
$ 146.04
$ 146
Dunham
2514
SIDE
X
$ 146.04
$ 146.04
$ 146
Meade
826
REAR
X
$ 146
Fisher
2629
SIDE
I X
I
$ 146.04
$ 146
Fisher
2621
REAR
X
$ 146.04
$ 146
Fisher
2615
SIDE
X
$ 146.04
$ 146
Poland
2630
SIDE
X
$ 146.04
$ 146
Poland
2622
REAR
I X
I
$ 146.04
$ 146
Bendix
818
REAR
X
$ 146.04
$ 146
Sample
2813
REAR
X
$ 146.04
$ 146
Liberty
810
REAR
X
$ 146.04
$ 146
Liberty
821
REAR
X
$ 146.04
1 $ 146
Sample
2901
REAR
X
$ 146.04
1 $ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
Dundee
833
REAR
X
$ 146.04
$ 146
Sample
3227
REAR
X
$ 146.04
$ 146
Sample
3119
REAR
X
$ 146.04
$ 146
Sample
3309
REAR
X
$ 146.04
$ 146
Kentucky
829
REAR
X
$ 146.04
$ 146
Lake
817
REAR
X
$ 146.04
$ 146
Sample
3421
REAR
X
$ 146.04
$ 146
Kentucky
418
SIDE
X
$ 146.04
$ 146
Kentucky
426
REAR
I X
I
$ 146.04
$ 146.04
$ 146
Western
3410
REAR
X
$ 146
Lake
433
REAR
X
$ 146.04
$ 146
Falcon
437
REAR
X
$ 146.04
$ 146
Western
3622
REAR
I X
I
$ 146.04
$ 146
Kenmore
427
REAR
X
$ 146.04
$ 146
Illinois
443
REAR
X
$ 146.04
$ 146
Illinois
428
REAR
X
$ 146.04
$ 146
Washington
917
REAR
I X
I
$ 146.04
$ 146
LaPorte
127
REAR
X
$ 146.04
$ 146
Arnold
2214
REAR
X
$ 146.04
$ 146
Franklin
2217
REAR
X
$ 146.04
$ 146
Franklin
2214
REAR
X
$ 146.04
$ 146
Franklin
2113
REAR
X
$ 146.04
$ 146
Franklin
2206
REAR
X
$ 146.04
$ 146
Franklin
2128
REAR
X
$ 146.04
$ 146
Franklin
2002
REAR
X
$ 146.04
$ 146
Franklin
1906
REAR
X
$ 146.04
$ 146
S.Main
3116
REAR
X
$ 146.04
$ 146.04
$ 146
Navarre
501
REAR
X
$ 146
Leland
624
REAR
X
$ 146.04
$ 146
Portage
615
REAR
X
$ 146.04
$ 146
Angela
306
REAR
X
$ 146.04
$ 146
Angela
418
REAR
X
$ 146.04
$ 146
Cottage Grove
712
REAR
X
$ 146.04
$ 146
Cottage Grove
715
REAR
X
$ 146.04
$ 146
Portage
1047
REAR
X
$ 146.04
$ 146
Sherman
1014
SIDE
X
$ 146.04
$ 146
Sherman
1022
REAR
X
$ 146.04
$ 146
Diamond
813
REAR
X
1
1$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(it)
Width
(it)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
W
¢
a
O
U
m
Diamond
918
REAR
X
$ 146.04
$ 146
Medora
1621
REAR
X
$ 146.04
$ 146
Elmer
730
REAR
X
$ 146.04
$ 146
Longley
2211
REAR
X
$ 146.04
$ 146
Illinois
1414
SIDE
X
$ 146.04
$ 146
Wellington
833
SIDE
X
$ 146.04
$ 146
Albert
845
REAR
X
$ 146.04
$ 146
Sheridan
840
SIDE
X
$ 146.04
$ 146
Chicago
845
SIDE
I X
I
$ 146.04
$ 146.04
$ 146
Kenmore
834
SIDE
X
$ 146
Kenmore
818
REAR
X
$ 146.04
$ 146
Chestnut
111
REAR
X
$ 146.04
$ 146
Chestnut
122
REAR
I X
I
$ 146.04
$ 146
Main
2817
SIDE
X
$ 146.04
$ 146
Main
2809
REAR
X
$ 146.04
$ 146
Main
2829
SIDE
X
$ 146.04
$ 146
Wellington
832
SIDE
I X
I
$ 146.04
$ 146
Edison
845
SIDE
X
$ 146.04
$ 146
Laurel
128
SIDE
X
$ 146.04
$ 146
Napier
1111
REAR
X
$ 146.04
$ 146
Napier
1018
SIDE
I X
I
$ 146.04
$ 146
Napier
1029
SIDE
X
$ 146.04
$ 146
Jefferson
1220
REAR
X
$ 146.04
$ 146
S.Main
1201
REAR
X
$ 146.04
$ 146
S.Main
1313
REAR
I X
I
$ 146.04
$ 146
S.Main
1149
REAR
X
$ 146.04
$ 146
S.Main
1121
SIDE
X
$ 146.04
$ 146.04
$ 146
Angela
506
REAR
X
$ 146
Angela
548
SIDE
I X
I
$ 146.04
$ 146
Angela
626
REAR
X
$ 146.04
$ 146
Angela
702
REAR
X
$ 146.04
$ 146
Angela
714
SIDE
X
$ 146.04
$ 146
Hollywood
2214
REAR
I X
I
$ 146.04
$ 146
Elwood
1914
REAR
X
$ 146.04
$ 146
Elmer
1714
REAR
X
$ 146.04
$ 146
Elmer
809
REAR
X
$ 146.04
$ 146
Olive
338
SIDE
X
$ 146.04
$ 146
Fox
901
SIDE
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
W
¢
a
O
U
m
Victoria
826
REAR
X
$ 146.04
$ 146
Victoria
902
SIDE
X
$ 146.04
$ 146
Victoria
912
REAR
X
$ 146.04
$ 146
Oakside
906
SIDE
X
$ 146.04
$ 146
Oakside
918
REAR
X
$ 146.04
$ 146
Oakside
1022
SIDE
X
$ 146.04
$ 146
Oakside
1022
REAR
X
$ 146.04
$ 146
Indiana
1812
REAR
X
$ 146.04
$ 146
Indiana
1812
SIDE
X
$ 146.04
$ 146.04
$ 146
27th
1302
SIDE
X
$ 146
College
1126
REAR
X
$ 146.04
$ 146
Jennings
113
SIDE
X
$ 146.04
$ 146
Addison
3509
REAR
X
$ 146.04
$ 146
Addison
3615
REAR
X
$ 146.04
$ 146
Addison
3707
REAR
X
$ 146.04
$ 146
Addison
3811
REAR
X
$ 146.04
$ 146
Addison
3915
REAR
X
$ 146.04
$ 146
Addison
4001
REAR
X
$ 146.04
$ 146
Addison
4005
REAR
X
$ 146.04
$ 146
Victoria
902
SIDE
X
$ 146.04
$ 146
Elmer
1729
REAR
I X
$ 146.04
$ 146
Olive
1862
REAR
X
$ 146.04
$ 146
Elmer
1611
REAR
X
$ 146.04
$ 146
Grant
1801
REAR
X
$ 146.04
$ 146
Warren
1718
REAR
I X
I
$ 146.04
$ 146
Ewing
214
REAR
X
$ 146.04
$ 146
Ewing
306
REAR
X
$ 146.04
$ 146.04
$ 146
Ewing
410
REAR
X
$ 146
Ewing
522
REAR
I X
I
$ 146.04
$ 146
Ewing
604
REAR
X
$ 146.04
$ 146
Ewing
902
SIDE
X
$ 146.04
$ 146
Altgeld
902
SIDE
X
$ 146.04
$ 146
Altgeld
5456
SIDE
I X
I
$ 146.04
$ 146
Eckman
622
SIDE
X
$ 146.04
$ 146
Michigan
122
REAR
X
$ 146.04
$ 146
Taylor
413
SIDE
X
$ 146.04
$ 146
Taylor
414
SIDE
X
$ 146.04
$ 146
Portage
316
SIDE
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
LWW
337
SIDE
X
$ 146.04
$ 146
LWW
415
REAR
X
$ 146.04
$ 146
LWW
525
REAR
X
$ 146.04
$ 146
Leland
623
REAR
X
$ 146.04
$ 146
Leland
529
REAR
X
$ 146.04
$ 146
Leland
529
SIDE
X
$ 146.04
$ 146
Scott
542
SIDE
X
$ 146.04
$ 146
Cottage Grove
526
REAR
X
$ 146.04
$ 146
Cottage Grove
624
REAR
X
$ 146.04
$ 146.04
$ 146
Cottage Grove
730
REAR
X
$ 146
Prast
2817
REAR
X
$ 146.04
$ 146
Prast
2915
REAR
X
$ 146.04
$ 146
Allen
739
REAR
X
$ 146.04
$ 146
Cleveland
740
REAR
X
$ 146.04
$ 146
Cleveland
708
SIDE
X
$ 146.04
$ 146
Sherman
1022
SIDE
X
$ 146.04
$ 146
Portage
1035
REAR
I X
I
$ 146.04
$ 146
Sherman
820
REAR
X
$ 146.04
$ 146
Sherman
912
REAR
X
$ 146.04
$ 146
Cleveland
740
REAR
X
$ 146.04
$ 146
Diamond
724
SIDE
I X
I
$ 146.04
$ 146
Cleveland
1015
REAR
X
$ 146.04
$ 146
Cleveland
921
REAR
X
$ 146.04
$ 146
Roosevelt
921
SIDE
X
$ 146.04
$ 146
Beale
902
SIDE
I X
I
$ 146.04
$ 146
Roosevelt
814
REAR
X
$ 146.04
$ 146
Roosevelt
938
REAR
X
$ 146.04
$ 146.04
$ 146
Roosevelt
802
SIDE
X
$ 146
Roosevelt
922
SIDE
I X
I
$ 146.04
$ 146
Beale
1006
REAR
X
$ 146.04
$ 146
Beale
1118
REAR
X
$ 146.04
$ 146
Twyckenham
2202
SIDE
X
$ 146.04
$ 146
College
1126
REAR
I X
I
$ 146.04
$ 146
Angela
702
REAR
X
$ 146.04
$ 146
Angela
630
REAR
X
$ 146.04
$ 146
Angela
506
REAR
X
$ 146.04
$ 146
Angela
702
SIDE
X
$ 146.04
$ 146
Angela
417
REAR
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
W
¢
a
O
U
m
Angela
545
REAR
X
$ 146.04
$ 146
Marquette
710
REAR
X
$ 146.04
$ 146
Marquette
626
REAR
X
$ 146.04
$ 146
Queen
1128
REAR
X
$ 146.04
$ 146
Kinyon
1134
REAR
X
$ 146.04
$ 146
Kinyon
1018
REAR
X
$ 146.04
$ 146
Roosevelt
1033
SIDE
X
$ 146.04
$ 146
Roosevelt
1121
REAR
X
$ 146.04
$ 146
Roosevelt
Roosevelt
1009
REAR
X
$ 146.04
$ 146.04
$ 146
917
REAR
X
$ 146
Roosevelt
803
REAR
X
$ 146.04
$ 146
Jackson
1918
REAR
X
$ 146.04
$ 146
Jackson
1726
REAR
X
$ 146.04
$ 146
Wellington
1627
REAR
X
$ 146.04
$ 146
Kinyon
1013
REAR
X
$ 146.04
$ 146
Kinyon
1127
REAR
X
$ 146.04
$ 146
Rose
1001
REAR
X
$ 146.04
$ 146
Rose
1105
REAR
X
$ 146.04
$ 146
Roosevelt
813
REAR
X
$ 146.04
$ 146
Roosevelt
909
REAR
X
$ 146.04
$ 146
Miami
2801
REAR
I X
$ 146.04
$ 146
Eckman
907
SIDE
X
$ 146.04
$ 146
28th
745
REAR
X
$ 146.04
$ 146
Johnson
1419
SIDE
X
$ 146.04
$ 146
Johnson
1423
REAR
I X
I
$ 146.04
$ 146
Johnson
1517
REAR
X
$ 146.04
$ 146
LaPorte
719
SIDE
X
$ 146.04
$ 146.04
$ 146
LaPorte
727
REAR
X
$ 146
Sancome
719
REAR
I X
I
$ 146.04
$ 146
LWW
1422
REAR
X
$ 146.04
$ 146
Glen
2218
SIDE
X
$ 146.04
$ 146
Ewing
1924
SIDE
X
$ 146.04
$ 146
Ewing
1908
REAR
I X
I
$ 146.04
$ 146
Ewing
1802
REAR
X
$ 146.04
$ 146
Ewing
1710
REAR
X
$ 146.04
$ 146
Ewing
1608
REAR
X
$ 146.04
$ 146
Kenwood
2206
REAR
X
$ 146.04
$ 146
Kenwood
2310
REAR
X
1
1$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
rn
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
W
¢
a
O
U
m
Werwinski
621
SIDE
X
$ 146.04
$ 146
O'Brien
711
REAR
X
$ 146.04
$ 146
Johnson
619
SIDE
X
$ 146.04
$ 146
Roger
2121
REAR
X
$ 146.04
$ 146
Roger
2017
REAR
I X
I
$ 146.04
$ 146
Johnson
629
REAR
X
$ 146.04
$ 146
Roger
2217
REAR
X
$ 146.04
$ 146
Roger
2309
REAR
X
$ 146.04
$ 146
Elmer
713
SIDE
I X
I
$ 146.04
$ 146.04
$ 146
Elmer
733
REAR
X
$ 146
Johnson
727
REAR
X
$ 146.04
$ 146
Bonds
2525
REAR
X
$ 146.04
$ 146
Bonds
2415
REAR
I X
I
$ 146.04
$ 146
Prast
2805
REAR
X
$ 146.04
$ 146
Prast
2917
REAR
X
$ 146.04
$ 146
Johnson
1214
REAR
X
$ 146.04
$ 146
Johnson
1306
SIDE
I X
I
$ 146.04
$ 146
Johnson
1338
REAR
X
$ 146.04
$ 146
Johnson
1350
SIDE
X
$ 146.04
$ 146
Johnson
1116
REAR
X
$ 146.04
$ 146
Johnson
1022
SIDE
I X
I
$ 146.04
$ 146
Johnson
1010
REAR
X
$ 146.04
$ 146
LWW
1917
SIDE
X
$ 146.04
$ 146
30th
741
REAR
X
$ 146.04
$ 146
Johnson
929
SIDE
I X
I
$ 146.04
$ 146
Johnson
1017
REAR
X
$ 146.04
$ 146
Johnson
1125
REAR
X
$ 146.04
$ 146
Johnson
1213
REAR
X
$ 146.04
$ 146
Johnson
1335
REAR
I X
I
$ 146.04
$ 146
Johnson
1621
REAR
X
$ 146.04
$ 146
LaSalle
1148
REAR
X
$ 146.04
$ 146
LaSalle
1228
REAR
X
$ 146.04
$ 146
26th
1205
REAR
I X
I
$ 146.04
$ 146
28th
834
REAR
X
$ 146.04
$ 146
Johnson
1717
REAR
X
$ 146.04
$ 146
Johnson
1809
REAR
X
$ 146.04
$ 146
Johnson
1919
REAR
X
$ 146.04
$ 146
Johnson
2007
REAR
X
1
1 $ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
W
¢
a
O
U
m
Johnson
2025
SIDE
X
$ 146.04
$ 146
Fairview
629
REAR
X
$ 146.04
$ 146
Brookfield
1857
REAR
X
$ 146.04
$ 146
Brookfield
1749
REAR
X
$ 146.04
$ 146
Brookfield
1649
REAR
X
$ 146.04
$ 146
Meade
1522
REAR
X
$ 146.04
$ 146
Meade
1402
REAR
X
$ 146.04
$ 146
Meade
1650
REAR
X
$ 146.04
$ 146
Huey
1805
REAR
I X
I
$ 146.04
$ 146.04
$ 146
30th
834
REAR
X
$ 146
30th
842
SIDE
X
$ 146.04
$ 146
Sample
1545
REAR
X
$ 146.04
$ 146
Johnson
1754
REAR
I X
I
$ 146.04
$ 146
Kenmore
1513
REAR
X
$ 146.04
$ 146
Kenmore
1421
REAR
X
$ 146.04
$ 146
26th
833
SIDE
X
$ 146.04
$ 146
30th
838
REAR
I X
I
$ 146.04
$ 146
Prairie
2621
REAR
X
$ 146.04
$ 146
Prospect
2024
REAR
X
$ 146.04
$ 146
Prospect
1912
REAR
X
$ 146.04
$ 146
Meade
1922
REAR
I X
I
$ 146.04
$ 146
Meade
2014
REAR
X
$ 146.04
$ 146
Wabash
1916
REAR
X
$ 146.04
$ 146
Wabash
2022
REAR
X
$ 146.04
$ 146
Phillipa
1820
REAR
I X
I
$ 146.04
$ 146
Phillipa
1718
REAR
X
$ 146.04
$ 146
Carlisle
2014
REAR
X
$ 146.04
$ 146.04
$ 146
Carlisle
1910
REAR
X
$ 146
Carlisle
1816
REAR
I X
I
$ 146.04
$ 146
Prairie
1631
SIDE
X
$ 146.04
$ 146
Ewing
1702
REAR
X
$ 146.04
$ 146
Ewing
1610
REAR
X
$ 146.04
$ 146
Ewing
1622
SIDE
I X
I
$ 146.04
$ 146
32nd
1218
REAR
X
$ 146.04
$ 146
23rd
725
SIDE
X
$ 146.04
$ 146
23rd
843
SIDE
X
$ 146.04
$ 146
24th
601
REAR
X
$ 146.04
$ 146
24th
601
SIDE
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
24th
808
REAR
X
$ 146.04
$ 146
26th
731
REAR
X
$ 146.04
$ 146
26th
731
SIDE
X
$ 146.04
$ 146
27th
537
SIDE
X
$ 146.04
$ 146
27th
537
REAR
X
$ 146.04
$ 146
27th
729
REAR
X
$ 146.04
$ 146
27th
729
SIDE
X
$ 146.04
$ 146
27th
842
SIDE
X
$ 146.04
$ 146
27th
842
REAR
X
$ 146.04
$ 146.04
$ 146
28th
728
REAR
X
$ 146
28th
730
SIDE
X
$ 146.04
$ 146
30th
529
REAR
X
$ 146.04
$ 146
30th
529
SIDE
X
$ 146.04
$ 146
31 st
601
REAR
X
$ 146.04
$ 146
31 st
530
REAR
X
$ 146.04
$ 146
31st
530
SIDE
X
$ 146.04
$ 146
31st
726
SIDE
X
$ 146.04
$ 146
32nd
841
REAR
X
$ 146.04
$ 146
32nd
842
SIDE
X
$ 146.04
$ 146
Warren
426
REAR
X
$ 146.04
$ 146
Fisher
2615
SIDE
I X
$ 146.04
$ 146
Meade
518
SIDE
X
$ 146.04
$ 146
Meade
518
REAR
X
$ 146.04
$ 146
Meade
610
SIDE
X
$ 146.04
$ 146
Meade
610
REAR
I X
I
$ 146.04
$ 146
Ford
2415
SIDE
X
$ 146.04
$ 146
Olive
610
REAR
X
I $ 146.04
$ 146.04
$ 146
33rd
730
SIDE
X
$ 146
33rd
730
REAR
I X
I
$ 146.04
$ 146
34th
726
REAR
X
$ 146.04
$ 146
34th
726
SIDE
X
I $ 146.04
$ 146
34th
532
REAR
X
$ 146.04
$ 146
34th
602
SIDE
I X
I
$ 146.04
$ 146
34th
602
REAR
X
$ 146.04
$ 146
36th
601
SIDE
X
I $ 146.04
$ 146
36th
601
REAR
X
$ 146.04
$ 146
Pleasant
3610
SIDE
X
$ 146.04
$ 146
Pleasant
3513
SIDE
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
Pleasant
3513
REAR
X
$ 146.04
$ 146
Pleasant
3415
REAR
X
$ 146.04
$ 146
Pleasant
3415
SIDE
X
$ 146.04
$ 146
34th
946
REAR
X
$ 146.04
$ 146
34th
945
REAR
X
$ 146.04
$ 146
32nd
1213
REAR
X
$ 146.04
$ 146
31 st
1214
REAR
X
$ 146.04
$ 146
31st
1214
SIDE
X
$ 146.04
$ 146
Pleasant
2905
SIDE
X
$ 146.04
$ 146.04
$ 146
Pleasant
2813
SIDE
X
$ 146
30th
1337
SIDE
X
$ 146.04
$ 146
30th
1215
SIDE
X
$ 146.04
$ 146
30th
1257
SIDE
X
$ 146.04
$ 146
30th
1317
SIDE
X
$ 146.04
$ 146
29th
1215
SIDE
X
$ 146.04
$ 146
26th
927
SIDE
X
$ 146.04
$ 146
26th
927
REAR
X
$ 146.04
$ 146
23rd
1023
SIDE
X
$ 146.04
$ 146
Niles
1122
SIDE
X
$ 146.04
$ 146
Niles
1014
SIDE
X
$ 146.04
$ 146
Niles
922
SIDE
I X
$ 146.04
$ 146
Howard
310
SIDE
X
$ 146.04
$ 146
Corby
1307
SIDE
X
$ 146.04
$ 146
Corby
1307
REAR
X
$ 146.04
$ 146
Corby
1228
SIDE
I X
I
$ 146.04
$ 146
St.Louis
801
REAR
X
$ 146.04
$ 146
Notre Dame
821
REAR
X
$ 146.04
$ 146.04
$ 146
St.Louis
621
SIDE
X
$ 146
St.Louis
621
REAR
I X
I
$ 146.04
$ 146
St.Peter
616
REAR
X
$ 146.04
$ 146
Miner
945
REAR
X
$ 146.04
$ 146
Frances
321
SIDE
X
$ 146.04
$ 146
Frances
321
REAR
I X
I
$ 146.04
$ 146
Washington
716
SIDE
X
$ 146.04
$ 146
Campeau
1125
REAR
X
$ 146.04
$ 146
Campeau
1209
REAR
X
$ 146.04
$ 146
Sorin
1325
REAR
X
$ 146.04
1 $ 146
Sorin
1325
SIDE
X
$ 146.04
1 $ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
Bissell
1202
REAR
X
$ 146.04
$ 146
Eddy
418
REAR
X
$ 146.04
$ 146
Eddy
418
SIDE
X
$ 146.04
$ 146
Cedar
1231
REAR
X
$ 146.04
$ 146
Arthur
426
SIDE
X
$ 146.04
$ 146
LaSalle
1259
SIDE
X
$ 146.04
$ 146
LaSalle
1315
SIDE
X
$ 146.04
$ 146
LaSalle
1315
REAR
X
$ 146.04
$ 146
LaSalle
1531
REAR
X
$ 146.04
$ 146.04
$ 146
Wayne
913
SIDE
X
$ 146
Frances
310
SIDE
X
$ 146.04
$ 146
Frances
124
SIDE
X
$ 146.04
$ 146
Quimby
1023
SIDE
I X
I
$ 146.04
$ 146
Longfellow
1216
SIDE
X
$ 146.04
$ 146
Emerson
911
REAR
X
$ 146.04
$ 146
Roberts
1122
REAR
X
$ 146.04
$ 146
Hildreth
1516
REAR
I X
I
$ 146.04
$ 146
Hildreth
1516
SIDE
X
$ 146.04
$ 146
Bellevue
1002
REAR
X
$ 146.04
$ 146
River
639
SIDE
X
$ 146.04
$ 146
Broadway
113
SIDE
I X
I
$ 146.04
$ 146
Broadway
201
SIDE
X
$ 146.04
$ 146
Broadway
401
SIDE
X
$ 146.04
$ 146
Broadway
113
REAR
X
$ 146.04
$ 146
High
1502
SIDE
I X
I
$ 146.04
$ 146
High
1502
REAR
X
$ 146.04
$ 146
high
1514
SIDE
X
$ 146.04
$ 146.04
$ 146
Dubail
225
SIDE
X
$ 146
Dubail
225
REAR
I X
I
$ 146.04
$ 146
Dubail
603
REAR
X
$ 146.04
$ 146
Dubail
817
REAR
X
$ 146.04
$ 146
Dubail
817
REAR
X
$ 146.04
$ 146
Dubail
822
SIDE
I X
I
$ 146.04
$ 146
Dayton
136
REAR
X
$ 146.04
$ 146
Calvert
804
REAR
X
$ 146.04
$ 146
Calvert
930
REAR
X
$ 146.04
$ 146
Bowman
301
REAR
X
$ 146.04
1 $ 146
Bowman
417
REAR
X
$ 146.04
1 $ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(it)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
St.Joe
136
REAR
X
$ 146.04
$ 146
Donald
211
REAR
X
$ 146.04
$ 146
Ewing
123
REAR
X
$ 146.04
$ 146
Ewing
119
SIDE
X
$ 146.04
$ 146
Donald
601
REAR
X
$ 146.04
$ 146
Fox
811
SIDE
X
$ 146.04
$ 146
Altgeld
901
REAR
X
$ 146.04
$ 146
Altgeld
901
SIDE
X
$ 146.04
$ 146
Altgeld
902
SIDE
I X
I
$ 146.04
$ 146.04
$ 146
Altgeld
133
SIDE
X
$ 146
Altgeld
133
REAR
X
$ 146.04
$ 146
Victoria
301
REAR
X
$ 146.04
$ 146
Victoria
829
REAR
I X
I
$ 146.04
$ 146
Victoria
622
SIDE
X
$ 146.04
$ 146
Victoria
622
REAR
X
$ 146.04
$ 146
Fairview
201
REAR
X
$ 146.04
$ 146
Fairview
111
REAR
I X
I
$ 146.04
$ 146
Fairview
111
SIDE
X
$ 146.04
$ 146
Fairview
646
REAR
X
$ 146.04
$ 146
Fairview
646
SIDE
X
$ 146.04
$ 146
Eckman
641
REAR
I X
I
$ 146.04
$ 146
Eckman
641
SIDE
X
$ 146.04
$ 146
Eckman
529
REAR
X
$ 146.04
$ 146
Eckman
829
REAR
X
$ 146.04
$ 146
Eckman
829
SIDE
I X
I
$ 146.04
$ 146
Eckman
902
SIDE
X
$ 146.04
$ 146
Eckman
902
REAR
X
$ 146.04
$ 146.04
$ 146
Woodside
1022
SIDE
X
$ 146
Woodside
1022
REAR
I X
I
$ 146.04
$ 146
Woodside
1005
REAR
X
$ 146.04
$ 146
Broadway
1116
REAR
X
$ 146.04
$ 146
Broadway
1112
REAR
X
$ 146.04
$ 146
Broadway
1112
SIDE
I X
I
$ 146.04
$ 146
Indiana
1130
REAR
X
$ 146.04
$ 146
Calvert
1213
SIDE
X
$ 146.04
$ 146
Calvert
1217
SIDE
X
$ 146.04
$ 146
Randolph
1219
SIDE
X
$ 146.04
$ 146
Calvert
1416
REAR
X
$ 146.04
1 $ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
Calvert
1316
SIDE
X
$ 146.04
$ 146
Marine
1903
SIDE
X
$ 146.04
$ 146
Donald
1155
SIDE
X
$ 146.04
$ 146
Donald
1155
REAR
X
$ 146.04
$ 146
Ford
2415
SIDE
X
$ 146.04
$ 146
Ford
2515
SIDE
X
$ 146.04
$ 146
Ford
2617
SIDE
X
$ 146.04
$ 146
Ford
2629
SIDE
X
$ 146.04
$ 146
Kaley
621
REAR
I X
I
$ 146.04
$ 146.04
$ 146
Liberty
600
REAR
X
$ 146
Falcon
626
REAR
X
$ 146.04
$ 146
Kenmore
614
REAR
X
$ 146.04
$ 146
Kenmore
615
REAR
I X
I
$ 146.04
$ 146
Ford
4105
SIDE
X
$ 146.04
$ 146
Bowman
1826
REAR
X
$ 146.04
$ 146
Bowman
1826
SIDE
X
$ 146.04
$ 146
Calvert
1630
SIDE
I X
I
$ 146.04
$ 146
Calvert
1630
REAR
X
$ 146.04
$ 146
Robinson
1826
SIDE
X
$ 146.04
$ 146
Leer
1422
SIDE
X
$ 146.04
$ 146
Bronson
730
SIDE
I X
I
$ 146.04
$ 146
Kosciuszko
532
SIDE
X
$ 146.04
$ 146
Kosciuszko
506
REAR
X
$ 146.04
$ 146
Kosciuszko
416
SIDE
X
$ 146.04
$ 146
Kosciuszko
416
REAR
I X
I
$ 146.04
$ 146
Kosciuszko
415
SIDE
X
$ 146.04
$ 146
Kosciuszko
435
REAR
X
$ 146.04
$ 146.04
$ 146
Kosciuszko
435
SIDE
X
$ 146
Kosciuszko
435
SIDE
I X
I
$ 146.04
$ 146
Western
1106
REAR
X
$ 146.04
$ 146
Western
1106
SIDE
X
$ 146.04
$ 146
Harris
416
SIDE
X
$ 146.04
$ 146
Harris
416
REAR
I X
I
$ 146.04
$ 146
Meade
610
SIDE
X
$ 146.04
$ 146
Phillipa
434
REAR
X
$ 146.04
$ 146
Phillipa
434
SIDE
X
$ 146.04
$ 146
Meade
515
SIDE
X
$ 146.04
1 $ 146
Meade
518
SIDE
X
$ 146.04
1 $ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
W
¢
a
O
U
m
Bendix
414
SIDE
X
$ 146.04
$ 146
Bendix
414
REAR
X
$ 146.04
$ 146
Bendix
413
REAR
X
$ 146.04
$ 146
Bendix
413
SIDE
X
$ 146.04
$ 146
Liberty
413
SIDE
I X
I
$ 146.04
$ 146
Liberty
413
REAR
X
$ 146.04
$ 146
Sheridan
454
REAR
X
$ 146.04
$ 146
Bowman
801
REAR
X
$ 146.04
$ 146
Bowman
440
REAR
I X
I
$ 146.04
$ 146.04
$ 146
Donald
1201
REAR
X
$ 146
Fox
1202
REAR
X
$ 146.04
$ 146
Fox
1201
REAR
X
$ 146.04
$ 146
Ewing
1112
SIDE
I X
I
$ 146.04
$ 146
Eckman
801
REAR
X
$ 146.04
$ 146
Bowman
236
REAR
X
$ 146.04
$ 146
1709 E Fox
1709
SIDE
X
$ 146.04
$ 146
Sampson
1802
REAR
I X
I
I $ 146.04
$ 146
Hoke
1902
REAR
X
$ 146.04
$ 146
Randolph
1320
SIDE
X
$ 146.04
$ 146
Navarre
516
SIDE
X
$ 146.04
$ 146
Portage
733
SIDE
I X
I
I $ 146.04
$ 146
Cottage Grove
907
SIDE
X
$ 146.04
$ 146
Blain
902
REAR
X
$ 146.04
$ 146
Blain
915
REAR
X
$ 146.04
$ 146
McCartney
1214
REAR
I X
I
I $ 146.04
$ 146
Rose
1101
SIDE
X
$ 146.04
$ 146
Rose
1101
REAR
X
$ 146.04
$ 146.04
$ 146
Longley
1822
REAR
X
$ 146
Johnson
738
REAR
I X
I
I $ 146.04
$ 146
Johnson
738
SIDE
X
$ 146.04
$ 146
Johnson
710
REAR
X
$ 146.04
$ 146
Johnson
710
SIDE
X
$ 146.04
$ 146
Johnson
616
REAR
I X
I
I $ 146.04
$ 146
Westmoore
2413
SIDE
X
$ 146.04
$ 146
Westmoore
2413
REAR
X
$ 146.04
$ 146
Westmoore
2529
REAR
X
$ 146.04
$ 146
Fredrickson
2413
REAR
X
$ 146.04
$ 146
Fredrickson
2413
SIDE
X
$ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
Bonds
2415
REAR
X
$ 146.04
$ 146
Bonds
2525
REAR
X
$ 146.04
$ 146
Hartizer
2701
REAR
X
$ 146.04
$ 146
Hartizer
2629
REAR
X
$ 146.04
$ 146
Hartizer
2629
SIDE
X
$ 146.04
$ 146
Fredrickson
2630
REAR
X
$ 146.04
$ 146
Fredrickson
2702
REAR
X
$ 146.04
$ 146
Fredrickson
2702
SIDE
X
$ 146.04
$ 146
Fredrickson
2601
REAR
X
$ 146.04
$ 146.04
$ 146
Fredrickson
2733
REAR
X
$ 146
Goodland
1214
SIDE
X
$ 146.04
$ 146
Goodland
1214
REAR
X
$ 146.04
$ 146
Elliott
1326
REAR
X
$ 146.04
$ 146
23rd
519
SIDE
X
$ 146.04
$ 146
23rd
517
REAR
X
$ 146.04
$ 146
23rd
623
REAR
X
$ 146.04
$ 146
24th
741
REAR
X
$ 146.04
$ 146
24th
725
SIDE
X
$ 146.04
$ 146
25th
621
REAR
X
$ 146.04
$ 146
25th
509
REAR
X
$ 146.04
$ 146
25th
605
SIDE
I X
$ 146.04
$ 146
25th
721
REAR
X
$ 146.04
$ 146
Grant
421
REAR
X
$ 146.04
$ 146
Grant
615
REAR
X
$ 146.04
$ 146
Grant
525
REAR
I X
I
$ 146.04
$ 146
Warren
613
REAR
X
$ 146.04
$ 146
Warren
509
REAR
X
$ 146.04
$ 146.04
$ 146
36th
302
REAR
X
$ 146
31 st
713
REAR
I X
I
$ 146.04
$ 146
31st
725
SIDE
X
$ 146.04
$ 146
32nd
830
REAR
X
$ 146.04
$ 146
32nd
618
REAR
X
$ 146.04
$ 146
32nd
514
REAR
I X
I
$ 146.04
$ 146
32nd
530
SIDE
X
$ 146.04
$ 146
33rd
602
SIDE
X
$ 146.04
$ 146
33rd
618
REAR
X
$ 146.04
$ 146
33rd
814
REAR
X
$ 146.04
1 $ 146
33rd
842
SIDE
X
$ 146.04
1 $ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
34th
842
REAR
X
$ 146.04
$ 146
34th
842
SIDE
X
$ 146.04
$ 146
35th
822
REAR
X
$ 146.04
$ 146
35th
842
SIDE
X
$ 146.04
$ 146
36th
726
REAR
X
$ 146.04
$ 146
36th
520
REAR
X
$ 146.04
$ 146
36th
610
REAR
X
$ 146.04
$ 146
36th
532
SIDE
X
$ 146.04
$ 146
36th
842
SIDE
X
$ 146.04
$ 146.04
$ 146
36th
1213
SIDE
X
$ 146
36th
1217
REAR
X
$ 146.04
$ 146
35th
944
REAR
X
$ 146.04
$ 146
35th
916
SIDE
X
$ 146.04
$ 146
35th
1213
SIDE
X
$ 146.04
$ 146
34th
3409
REAR
X
$ 146.04
$ 146
34th
1215
SIDE
X
$ 146.04
$ 146
33rd
1112
SIDE
X
$ 146.04
$ 146
34th
915
SIDE
X
$ 146.04
$ 146
33rd
913
SIDE
X
$ 146.04
$ 146
Mishawaka
3210
REAR
X
$ 146.04
$ 146
30th
1214
SIDE
I X
$ 146.04
$ 146
Nursery
2903
SIDE
X
$ 146.04
$ 146
Nursery
2903
REAR
X
$ 146.04
$ 146
Nursery
2815
SIDE
X
$ 146.04
$ 146
Vine
2815
SIDE
I X
I
$ 146.04
$ 146
Vine
2815
REAR
X
$ 146.04
$ 146
Vine
2811
SIDE
X
$ 146.04
$ 146.04
$ 146
27th
946
REAR
X
$ 146
25th
925
REAR
I X
I
$ 146.04
$ 146
25th
925
SIDE
X
$ 146.04
$ 146
Vine
2402
SIDE
X
$ 146.04
$ 146
Howard
428
SIDE
X
$ 146.04
$ 146
Howard
427
SIDE
I X
I
$ 146.04
$ 146
Corby
511
SIDE
X
$ 146.04
$ 146
Corby
613
SIDE
X
$ 146.04
$ 146
Notre Dame
1035
REAR
X
$ 146.04
$ 146
Leeper
1208
SIDE
X
$ 146.04
1 $ 146
Duey
1030
SIDE
X
$ 146.04
1 $ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
W
¢
a
O
U
m
Howard
1247
SIDE
X
$ 146.04
$ 146
Howard
1227
REAR
X
$ 146.04
$ 146
Corby
1343
SIDE
X
$ 146.04
$ 146
Howard
1228
SIDE
X
$ 146.04
$ 146
Corby
704
SIDE
I X
I
$ 146.04
$ 146
South Bend
753
REAR
X
$ 146.04
$ 146
St.Louis
712
SIDE
X
$ 146.04
$ 146
St.Louis
733
REAR
X
$ 146.04
$ 146
Minor
837
REAR
I X
I
$ 146.04
$ 146.04
$ 146
Notre Dame
510
SIDE
X
$ 146
Minor
1002
REAR
X
$ 146.04
$ 146
Madison
1023
REAR
X
$ 146.04
$ 146
LaSalle
718
SIDE
I X
I
$ 146.04
$ 146
St.Louis
222
SIDE
X
$ 146.04
$ 146
Colfax
611
SIDE
X
$ 146.04
$ 146
St.Peter
122
SIDE
X
$ 146.04
$ 146
Colfax
516
SIDE
I X
I
$ 146.04
$ 146
Colfax
516
REAR
X
$ 146.04
$ 146
Notre Dame
119
SIDE
X
$ 146.04
$ 146
Washington
913
SIDE
X
$ 146.04
$ 146
Notre Dame
120
SIDE
I X
I
$ 146.04
$ 146
Jefferson
918
SIDE
X
$ 146.04
$ 146
Frances
520
SIDE
X
$ 146.04
$ 146
Frances
436
SIDE
X
$ 146.04
$ 146
Perry
509
REAR
I X
I
$ 146.04
$ 146
Perry
403
REAR
X
$ 146.04
$ 146
Perry
415
SIDE
X
$ 146.04
$ 146.04
$ 146
Bissell
1146
REAR
X
$ 146
Sorin
1125
SIDE
I X
I
$ 146.04
$ 146
Minor
1245
REAR
X
$ 146.04
$ 146
Sorin
1256
SIDE
X
$ 146.04
$ 146
Minor
1462
REAR
X
$ 146.04
$ 146
Minor
1258
SIDE
I X
I
$ 146.04
$ 146
Sommers
418
SIDE
X
$ 146.04
$ 146
Arthur
417
REAR
X
$ 146.04
$ 146
Madison
1201
REAR
X
$ 146.04
$ 146
Walsh
425
REAR
X
$ 146.04
1 $ 146
LaSalle
1125
REAR
X
$ 146.04
1 $ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
LaSalle
1231
REAR
X
$ 146.04
$ 146
LaSalle
1255
REAR
X
$ 146.04
$ 146
Colfax
1227
REAR
X
$ 146.04
$ 146
LaSalle
1260
SIDE
X
$ 146.04
$ 146
Wayne
813
SIDE
I X
I
$ 146.04
$ 146
Jefferson
918
SIDE
X
$ 146.04
$ 146
Wayne
1001
REAR
X
$ 146.04
$ 146
Belmont
1214
REAR
X
$ 146.04
$ 146
Longfellow
1237
SIDE
I X
I
$ 146.04
$ 146.04
$ 146
20th
926
SIDE
X
$ 146
20th
948
REAR
X
$ 146.04
$ 146
Clinton
624
REAR
X
$ 146.04
$ 146
Clinton
616
SIDE
I X
I
$ 146.04
$ 146
South
612
SIDE
X
$ 146.04
$ 146
Rush
614
SIDE
X
$ 146.04
$ 146
Clinton
616
SIDE
X
$ 146.04
$ 146
Bronson
511
SIDE
I X
I
$ 146.04
$ 146
Fellows
618
SIDE
X
$ 146.04
$ 146
Broadway
418
REAR
X
$ 146.04
$ 146
Haney
304
REAR
X
$ 146.04
$ 146
Indiana
302
REAR
I X
I
$ 146.04
$ 146
Fellows
1711
SIDE
X
$ 146.04
$ 146
Fellows
1805
SIDE
X
$ 146.04
$ 146
Carroll
1515
SIDE
X
$ 146.04
$ 146
Dubail
238
REAR
I X
I
$ 146.04
$ 146
St.Joe
1711
SIDE
X
$ 146.04
$ 146
Indiana
Broadway
112
SIDE
X
$ 146.04
$ 146.04
$ 146
518
SIDE
X
$ 146
Haney
518
SIDE
I X
I
$ 146.04
$ 146
Indiana
1010
SIDE
X
$ 146.04
$ 146
Dubail
906
SIDE
X
$ 146.04
$ 146
Dayton
621
SIDE
X
$ 146.04
$ 146
Dubail
522
SIDE
I X
I
$ 146.04
$ 146
Milton
116
SIDE
X
$ 146.04
$ 146
Michigan
1914
REAR
X
$ 146.04
$ 146
Bowman
116
SIDE
X
$ 146.04
$ 146
Dayton
1212
SIDE
X
$ 146.04
$ 146
Dayton
1316
SIDE
X
$ 146.04
1 $ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
Dayton
1324
REAR
X
$ 146.04
$ 146
Randolph
1320
SIDE
X
$ 146.04
$ 146
Randolph
1356
SIDE
X
$ 146.04
$ 146
Calvert
1329
REAR
X
$ 146.04
$ 146
Bowman
1442
REAR
X
$ 146.04
$ 146
Bowman
1328
REAR
X
$ 146.04
$ 146
Calvert
1144
REAR
X
$ 146.04
$ 146
Bowman
1220
SIDE
X
$ 146.04
$ 146
Donald
Fox
1426
REAR
X
$ 146.04
$ 146.04
$ 146
1426
REAR
X
$ 146
Ewing
1149
SIDE
X
$ 146.04
$ 146
Ewing
1229
SIDE
X
$ 146.04
$ 146
Ewing
1229
REAR
I X
I
$ 146.04
$ 146
Ewing
1507
REAR
X
$ 146.04
$ 146
Ewing
1609
REAR
X
$ 146.04
$ 146
Ewing
1729
REAR
X
$ 146.04
$ 146
Ewing
1629
SIDE
I X
I
$ 146.04
$ 146
Ewing
1447
REAR
X
$ 146.04
$ 146
Fox
1945
SIDE
X
$ 146.04
$ 146
Kaley
841
REAR
X
$ 146.04
$ 146
Fishers
2634
SIDE
I X
I
$ 146.04
$ 146
Fishers
2634
REAR
X
$ 146.04
$ 146
Taylor
316
SIDE
X
$ 146.04
$ 146
Laurel
310
SIDE
X
$ 146.04
$ 146
Chapin
315
SIDE
I X
I
$ 146.04
$ 146
Thomas
1001
REAR
X
$ 146.04
$ 146
Thomas
1103
REAR
X
$ 146.04
$ 146.04
$ 146
Main
2818
REAR
X
$ 146
Main
3002
REAR
I X
I
$ 146.04
$ 146
Main
3226
REAR
X
$ 146.04
$ 146
Ewing
902
SIDE
X
$ 146.04
$ 146
Altgeld
832
SIDE
X
$ 146.04
$ 146
Victoria
902
SIDE
I X
I
$ 146.04
$ 146
Erskine
2502
REAR
X
$ 146.04
$ 146
Victoria
518
SIDE
X
$ 146.04
$ 146
Fairview
518
SIDE
X
$ 146.04
$ 146
Fairview
830
SIDE
X
$ 146.04
1 $ 146
Irvington
646
SIDE
X
$ 146.04
1 $ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
L
¢
a
O
U
m
Irvington
204
REAR
X
$ 146.04
$ 146
Woodside
902
SIDE
X
$ 146.04
$ 146
Oakside
830
SIDE
X
$ 146.04
$ 146
Altgeld
1022
SIDE
X
$ 146.04
$ 146
Ewing
1148
SIDE
I X
I
$ 146.04
$ 146
Ewing
1628
SIDE
X
$ 146.04
$ 146
Portage
419
SIDE
X
$ 146.04
$ 146
Portage
629
REAR
X
$ 146.04
$ 146
Lindsey
707
SIDE
I X
I
$ 146.04
$ 146.04
$ 146
Pierce
711
SIDE
X
$ 146
Cottage Grove
519
REAR
X
$ 146.04
$ 146
Lindsey
1036
REAR
X
$ 146.04
$ 146
Van Buren
1036
SIDE
I X
I
$ 146.04
$ 146
Van Buren
1043
SIDE
X
$ 146.04
$ 146
Sherman
1003
REAR
X
$ 146.04
$ 146
Portage
720
REAR
X
$ 146.04
$ 146
Leland
810
REAR
I X
I
$ 146.04
$ 146
Leland
908
REAR
X
$ 146.04
$ 146
Leland
826
SIDE
X
$ 146.04
$ 146
Leland
742
SIDE
X
$ 146.04
$ 146
Leland
911
SIDE
I X
I
$ 146.04
$ 146
Irogouis
1115
SIDE
X
$ 146.04
$ 146
Lafayette
1231
SIDE
X
$ 146.04
$ 146
Parkview
2208
REAR
X
$ 146.04
$ 146
Good
1015
SIDE
I X
I
$ 146.04
$ 146
Blyler
1111
SIDE
X
$ 146.04
$ 146
Inglewood
1246
SIDE
X
$ 146.04
$ 146
Academy
1114
SIDE
X
$ 146.04
$ 146
Vassar
918
SIDE
I X
I
$ 146.04
$ 146
LaSalle
938
SIDE
X
$ 146.04
$ 146
Allen
537
SIDE
X
$ 146.04
$ 146
Allen
503
SIDE
X
$ 146.04
$ 146
Blaine
611
SIDE
I X
I
$ 146.04
$ 146
Cleveland
502
REAR
X
$ 146.04
$ 146
Cleveland
608
REAR
X
$ 146.04
$ 146
Blaine
527
SIDE
X
$ 146.04
$ 146
LaPorte
610
SIDE
X
$ 146.04
$ 146
Diamond
624
SIDE
1 $ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Alley Location
Length
(ft)
Width
(ft)
0
U
m
c
(„)
3
z
C
O
m
a
t
of
C
•�
'
�
E
N
F
U
>
N
i6
U)
U
m
w
'O
Q
m
v
LL
0
U
@
v
N
@
N
0
2
¢
a
a
J
Q
a
c
N
_E
W
¢
a
O
U
m
LaPorte
667
SIDE
X
$ 146.04
$ 146
Studebaker
529
REAR
X
$ 146.04
$ 146
Walnut
509
REAR
X
$ 146.04
$ 146
Walnut
401
REAR
X
$ 146.04
$ 146
Studebaker
602
REAR
X
$ 146.04
$ 146
Linden
1301
REAR
X
$ 146.04
$ 146
Linden
1401
REAR
X
$ 146.04
$ 146
Studebaker
408
SIDE
X
$ 146.04
$ 146
Studebaker
502
SIDE
X
$ 146.04
$ 146.04
$ 146
Wilber
616
SIDE
X
$ 146
Brookfield
624
REAR
X
$ 146.04
$ 146
Brookfield
511
SIDE
X
$ 146.04
$ 146
Brookfield
523
REAR
X
$ 146.04
$ 146
Johnson
517
SIDE
X
$ 146.04
$ 146
Lincoln Way
2020
SIDE
X
$ 146.04
$ 146
O'brien
801
REAR
X
$ 146.04
$ 146
Huey
805
REAR
I X
I
$ 146.04
$ 146
Huey
747
REAR
X
$ 146.04
$ 146
Brookfield
807
REAR
X
$ 146.04
$ 146
Prast
2012
SIDE
X
$ 146.04
$ 146
Johnson
826
SIDE
I X
I
$ 146.04
$ 146
Goodland
1326
SIDE
X
$ 146.04
$ 146
Elliot
1321
REAR
X
$ 146.04
$ 146
Elliot
1326
SIDE
X
$ 146.04
$ 146
Eclipse
1326
SIDE
I X
I
$ 146.04
$ 146
Kaley
1325
REAR
X
$ 146.04
$ 146
Kaley
1326
SIDE
X
$ 146.04
$ 146.04
$ 146
Meade
1361
REAR
X
$ 146
Elmer
1205
REAR
I X
I
$ 146.04
$ 146
Elmer
1149
REAR
X
$ 146.04
$ 146
Elmer
1050
REAR
X
$ 146.04
$ 146
Huey
1029
SIDE
X
$ 146.04
$ 146
Huey
1054
REAR
I X
I
$ 146.04
$ 146
Huey
1014
SIDE
X
$ 146.04
$ 146
O'brien
1011
SIDE
X
$ 146.04
$ 146
College
901
REAR
X
$ 146.04
$ 146
College
901
SIDE
X
$ 146.04
$ 146
College
826
REAR
X
1
1 $ 146.04
$ 146
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
0
E
w
c
U
C
O
C
N
>
N
'O
0
N
@
N
m
c
m
•�
F
i6
Q
N
a
_E
(„)
a
U
U)
U
m
U
@
0
2
J
W
O
U
Length
Width
3
t
'
m
v
¢
Q
¢
m
Road /Street
Address
Alley Location
(ft)
(ft)
z
of
�
LL
v
a
a
a
College
922
REAR
X
$ 146.04
$ 146
Adams
911
SIDE
X
$ 146.04
$ 146
Vassar
1115
SIDE
X
$ 146.04
$ 146
Kinyon
1523
SIDE
X
$ 146.04
$ 146
Johnson
1526
REAR
X
$ 146.04
$ 146
Johnson
1428
REAR
X
$ 146.04
$ 146
Johnson
1412
SIDE
X
$ 146.04
$ 146
Elmer
1528
REAR
X
$ 146.04
$ 146
Elmer
1402
REAR
X
$ 146.04
$ 146.04
$ 146
Bowman
1630
SIDE
X
$ 146
31 st
1005
REAR
X
$ 146.04
$ 146
Irivington
222
REAR
X
$ 146.04
$ 146
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section II, with additional information on individual projects.
2013 Cracksealing MOTOR VEHICLE HIGHWAY FUND
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost Provide this information only if known
o
'15
ac
E
a
w
`
C
m
m
m
a
cc
o
w
m
E
c
c_
U
�
cc
rn
U
N
U
a
42
U
U
E2
2
J
Q
W
V
From
To
Length
Width
3
t
o
°o
c
Q
Q
Q
m
Road /Street
Road /Street
Road /Street
ft
f
z
r
r
i
ti
a
a
a
F
Michigan St.
Chippewa Ave.
Donmoyer Ave.
2625
54
X
$849.25
$849.25
$891.52
Michigan St.
Donmoyer Ave.
Ewing St.
2850
52
X
$891.52
Michigan St.
Ewing St.
Broadway St
3250
53
X
$1,029.17
$1,029.17
$687.97
Michigan St.
Broadway St
Sample St.
1775
66
X
$687.97
$116.02
Creekbank Ln.
Creekview Dr.
Creekwater Ln.
590
30
X
$116.02
$122.93
Creeksedge Dr.
Creekview Dr.
Creekwater Ln.
625
30
X
$122.93
$118.00
Creekwater Ln.
Creeksedge Dr.
Creekwood Dr.
600
30
X
$118.00
$149.48
Creekwood Dr.
Hepler Rd.
Creekview Dr.
760
30
X
$149.48
$0.00
$0.00
$0.00
$0.00
TOTAL MVH FUNDS FOR ROAD /STREET CONSTRUCTION AND RECONSTRUCTION $ $3,964
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section II, with additional information on individual projects.
2013 Curb and Sidewalk MOTOR VEHICLE HIGHWAY FUND
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost Provide this information only if known
Road /Street
Address
Curb
Length ft.
Sidewalk
Length ft.
Driveway
Approach
S r. ft.
o
U
i
c
�j
3
z
C
0_
to
r
�
U
.2
w-2
�
E-
a
.
U)
T
2
-0
N
a
°o
ti
N
o
c
v
m
a
J
a
E
w
a
v
Walnut(ADA)
Northside(ADA)
Sibley St.
Sunnymede Ave.
E. Broadway St.
Longfellow St.
Sunnymede Ave.
Bendix St.
Northshore Dr.
Longfellow St.
Washington St.
Main St.(ADA)
32nd St.
E. Jennings St.
Sunnymede Ave.
Lincolnway West
Belmont St.
Bronson St.
Belmont St.
Sherman St.
S. 24th St.
Hastings St.
O'Brien St.
Laurel St.
Marquette St.
Marquette St.
Wakewa St.
S. 36th St.
Longfellow St.
at Napier
Sample St. to
Ironwood Dr.
1601
1137
222
1235
1212, 1214
601, 613, 615,
530, 602, 606
701
1302
705,711
at Wayne St.
802
205
1448
3221
1246
1120
1138, 1142
614
730,822
2209
727
112
605
633
126
943, 1014
1438, 1442
71
103
30
87
92
72
93
285
360
212
83
30
160
67
74
80
40
58
86
0
92
54
65
45
136
164
52
101
64
23
50
0
92
95
83
93
279
200
200
120
32
120
10
57
0
40
58
86
14
94
77
68
55
120
175
52
105
1 35
0
0
0
0
0
0
0
285
0
0
0
0
320
0
74
0
0
0
0
0
0
0
0
0
0
0
0
0
1 0 11
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
1 X
I
I
I
1 11
$2,648.18
$4,135.59
$1,277.46
$1,464.00
$1,727.08
$986.95
$1,726.57
$5,807.89
$3,790.25
$2,970.01
$1,985.51
$1,329.56
$2,822.14
$294.76
$2,026.13
$992.76
$725.51
$1,270.89
$1,548.76
$469.50
$1,606.20
$1,041.70
$1,452.20
$873.02
$2,443.14
$3,231.54
$1,007.45
$2,006.95
1 $894.69
1
$2,648.18
$4,135.59
$1,277.46
$1,464.00
$1,727.08
$986.95
$1,726.57
$5,807.89
$3,790.25
$2,970.01
$1,985.51
$1,329.56
$2,822.14
$294.76
$2,026.13
$992.76
$725.51
$1,270.89
$1,548.76
$469.50
$1,606.20
$1,041.70
$1,452.20
$873.02
$2,443.14
$3,231.54
$1,007.45
$2,006.95
$894.69
TOTAL MVH FUNDS FOR ROAD /STREET CONSTRUCTION AND RECONSTRUCTION $ $54,556
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section II, with additional information on individual projects.
2013 Pothole Patching
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
o
E
E
w
c
U
O
C
N
N
a
co
0
N
@
N
m
C
_m
'V
F
(6
U)
Q
U
N
(0
a
_E
O
(„)
a
U
U
m
@
J
W
U
From
To
Length
Width
c
¢
Q
¢
m
Road /Street
Road /Street
Road /Street
(ft)
(ft)
z
W
W
U)
1--
LL
a
U
a
a
Season long patching project performed throughout the
$
entire City of South Bend
X
$
Beginning 1/2/13 and Ending 12/23/13
$
RS2 Emulsion for Pothole Patcher
$ 43,334.53
$ 43,335
#11 Slag Stone for Pothole Patcher
$ 5,309.50
$ 5,310
Cold Mix (Special AE -300P)
$ 27,024.40
$ 27,024
Season long Infra Red repairs project performed
$ -
at various locations throughout the City of South Bend
X
$152,902
$ 152,902
Beginning 8/21/13 and Ending 11/16/13
$ -
$
TOTAL MVH FUNDS FOR ROAD /STREET CONSTRUCTION AND RECONSTRUCTION $
$228,571
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Illb - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section II, with additional information on individual projects
LOCAL ROADS AND STREET FUND
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost Provide this information only if known
Road /Street
From
Road /Street
To
Road /Steet
Length
(mi)
Width
(ft)
C
O
U
2
0
3
z
0
o
O
t
W
a,
U
f0t
W
E
E
H
v
U)
T
t3
U)
a
m
H
a
U
v
Q
m
LL
f0
o
m
c
U
6
m
g
Q
a
Q
a
c
N
E
w
Q
a
U
,<o
Western Ave / Laurel St Intersection
0.10
60
X
$128,000
$128,000
Portage Ave / Boland Dr Roundabout
0.10
1
X
$3,775
$3,775
Edison Rd / Gordon Drive Intersection
0.10
4
X
X
X
$363,259
$363,259
TOTAL LRS FUNDS FOR ROAD /STREET CONSTRUCTION AND RECONSTRUCTION $ $495,03
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Illg - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section 11, with additional information on individual projects.
OTHER DESIGNATED FUNDS FOR ROAD / STREET WORK TIF(S)
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost Provide this information only known
Road /Street
From
Road /Street
To
Road/Ste et
Length
mi
Width
(ft
o
C
3
z
O
r
V
N
�
E
~
M
V!
F
v
U
Q
~
U
j
O
76
Q
a
Q
Q
a
c
E
CL
7
Q
a
O
Fu
F
East Bank Sewer Separation Phase III
1
24
X
$2,305,628
$2,305,628
Main St/ Lafay
Ireland Rd
I Chippewa Rd
1
30
X
$3,665,184
$3,665,184
East Bank Sewer Separation Phase IV
1
28
X
$2,556,694
$2,556,694
TOTAL FUNDS FOR ROAD /STREET CONSTRUCTION AND RECONSTRUCTION $
$8,527,506
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION IV - CLASSIFICATION OF HIGHWAY OR STREET EMPLOYEES
Part of State Form 54400 (8 -10)
Work Classification
Number of Employees
Part Time / FTE
Full Time Allocation
Highway Director
0.86
Supervisor(s)
3.00
Assistant Supervisor(s)
Engineer(s)
0.20
Assistant Engineer(s)
0.80
Clerical Assistant(s)
2.59
Foremen
4.00
Truck Drivers
0.81
Equipment Operators
34.00
Garage Mechanics
Laborer(s)
4.74
List others:
Operations Tech
3.00
Signal Tech
3.00
Sign Artist
1.00
Director of Public Works
0.05
Ass't Dir of Public Works
0.05
Construction Manager
0.25
IFTotal
48.00
10.35
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION V - EQUIPMENT INVENTORY
Part of State Form 54400 (8 -10)
STREET DIVISION 2013
Year of
Actual Cost(')
Unit No
Make
Model
Description
Manufacture Purchase
w/o trade
201
FORD
EXPLORER
4X4 SUV
2007
2007
$20,660.00
202
FORD
F250
4X4 PICKUP
2004
2004
$22,720.00
203
FORD
F250
4X4 PICKUP
2004
2004
$22,720.00
204
CHEVROLET
2500
4X4 PICKUP
2002
2002
$24,148.00
204BB
HONDA
GX160
PLATE COMPACTOR
1993
1993
$1,150.00
204R
MAULDIN
4000
2 TON ROLLER
1995
1995
$9,835.00
205A
CHEVROLET
4500
1 TON DUMP
2004
2004
$42,270.00
205BB
HONDA
GX160
PLATE COMPACTOR
1993
1993
$1,150.00
206A
CHEVROLET
4500
1 TON DUMP
2004
2004
$42,270.00
206BB
MBW
AP2000
PLATE COMPACTOR
2002
2002
$1,415.00
206C
INGERSOLL RAND
185
AIR COMPRESSOR
2001
2001
$10,400.00
206D
SULLAIR
MPB90
AIR HAMMER
1989
1989
$1,000.00
206E
SULLAIR
MPB90
AIR HAMMER
1989
1989
$1,000.00
206H
SULLAIR
MPB90
AIR HAMMER
1989
1989
$1,000.00
206HB
FALCON
RME
PATCH BOX
2010
2010
$21,093.00
207
CHEVROLET
2500
4X4 PICKUP
2002
2002
$24,148.00
207A
CHEVROLET
4500
1 TON DUMP
2004
2004
$42,270.00
207E
SULLAIR
MPB90
AIR HAMMER
1989
1989
$1,000.00
207H
SULLAIR
MPB90
AIR HAMMER
1989
1989
$1,000.00
207R
MAULDIN
4000
2 TON ROLLER
2001
2001
$14,850.00
208BB
MBW
AP2000
PLATE COMPACTOR
2003
2003
$1,475.00
209
FORD
F250
3/4 TON 4X4
2011
2011
$26,826.74
209C
INGERSOLL RAND
185
AIR COMPRESSOR
1994
1994
$9,115.00
209D
SULLAIR
MPB90
AIR HAMMER
1992
1992
$2,500.00
209E
SULLAIR
MPB90
AIR HAMMER
1992
1992
$2,500.00
209H
SULLAIR
MPB90
AIR HAMMER
1989
1989
$1,000.00
209HB
FALCON
RME
PATCH BOX
2010
2010
$21,093.00
209R
BEUTHLING
B300
3 TON ROLLER
2003
2003
$16,590.00
210
CHEVROLET
2500
4X4 PICKUP
2006
2006
$23,265.00
210BB
HONDA
GX160
PLATE COMPACTOR
1994
1994
$1,225.00
210C
INGERSOLL RAND
185
AIR COMPRESSOR
1995
1995
$9,400.00
210HB
FALCON
RME
PATCH BOX
2013
2013
$24,942.00
FOR LOCAL ROADS AND STREETS
SECTION V - EQUIPMENT INVENTORY
Part of State Form 54400 (8 -10)
'REET DIVISION 201
Year
of
Actual Cost('
Unit No
Make
Model
Description
Manufacture
Purchase
(w /o trade)
210R
BEUTHLING
B300
3 TON ROLLER
2003
2003
$16,590.00
211
FORD
F450
FLATBED UTILITY
2012
2012
$33,050.00
212A
CHEVROLET
4500
1 TON DUMP
2004
2004
$42,270.00
212C
INGERSOLL RAND
185
AIR COMPRESSOR
2001
2001
$10,400.00
212E
SULLAIR
MPB90
AIR HAMMER
1992
1992
$1,160.00
212H
SULLAIR
MPB90
AIR HAMMER
1989
1989
$1,000.00
212HB
KM
8000T
PATCH BOX
2002
2002
$13,900.00
213
CASE
580
BACKHOE
1996
1996
$53,724.00
214
HYSTER
P50138652LP
FORKLIFT
1987
1987
$8,500.00
214F
YALE
42LFKS
FORKLIFT
1999
1999
$12,900.00
216BB
HONDA
GX160
PLATE COMPACTOR
1995
1995
$1,300.00
217
VOLVO
PF6170
ASPHALT PAVER
2012
2013
$320,193.00
217A
CARLSON
EZ III
PAVER SCREED
2013
2013
N/A
2178
BLAW KNOX
WEDGE LOCK
PAVER SCREED
1993
1993
$40,500.00
217BB
HONDA
GX160
PLATE COMPACTOR
1995
1995
$ 1,300.01
217R
INGERSOLL RAND
DD90
9 TON ROLLER
1994
1994
$75,500.00
217T
EAGER BEAVER
35 TON
PAVER TRAILER
2013
2013
$47,665.00
218R
TAMPO
RS156A
7.5 TON ROLLER
1985
1985
$44,175.00
218T
MILWAUKEE
C2
TRAILER
1981
1981
N/A
220BB
HONDA
GX160
PLATE COMPACTOR
1994
1994
$1,225.00
221
CHEVROLET
4500
FLATBED TRUCK
2003
2003
$30,120.00
222
NEW HOLLAND
LS180
SKID LOADER
2001
2001
$39,981.00
222T
CRONKHITE
55
SKID LOADER TRAILER
2001
2001
$4,785.00
223
WIRTGEN
W1000F
COLD PLANER
2000
2000
$247,857.00
223T
TRAILBOSS
463
TRAILER
2000
2000
$22,100.00
224R
SAKAI
SW850
12 TON ROLLER
2000
2000
$80,200.00
224T
DYNAWELD
24TTA
TRAILER
2001
2001
$14,000.00
227
FORD
TANDEM AXLE
DUMP TRUCK
2006
2006
$104,660.00
227B
VALLEY
TANDEM DUMP
LEAF BOX
1989
1989
$2,500.00
BED
227V
OLD DOMINION BRUSH
XV6000
LEAF VACUUM
2013
2013
$29,328.00
COMPANY
228
INTERNATIONAL
TANDEM AXLE
DUMP TRUCK
2013
2013
$145,917.46
228B
VALLEY
TANDEM DUMP
LEAF BOX
1990
1990
$2,500.00
BED
FOR LOCAL ROADS AND STREETS
SECTION V - EQUIPMENT INVENTORY
Part of State Form 54400 (8 -10)
'REET DIVISION 201
Year
of
Actual Cost('
Unit No
Make
Model
Description
Manufacture
Purchase
(w /o trade)
229
INTERNATIONAL
TANDEM AXLE
DUMP TRUCK
2011
2011
$166,486.45
229B
VALLEY
TANDEM DUMP
LEAF BOX
1990
1990
$2,500.00
BED
229V
TARCO
BIG T VAC
LEAF VACUUM
1989
1989
$14,979.00
230
FREIGHTLINER
TANDEM AXLE
DUMP TRUCK
2008
2008
$125,556.00
230B
VALLEY
TANDEM DUMP
LEAF BOX
1989
1989
$2,500.00
BED
230V
OLD DOMINION BRUSH
XV6000
LEAF VACUUM
2013
2013
$29,328.00
COMPANY
233
INTERNATIONAL
TRACTOR
TRUCK
1990
1990
$52,435.00
233T
EAGER BEAVER
20XTP
TRAILER
1995
1995
$12,300.00
234
FORD
F450
FLATBED TRUCK
2011
2011
$31,674.13
235
FORD
F550
FLATBED TRUCK
2008
2008
$32,168.00
239
INTERNATIONAL
TANDEM AXLE
DUMP TRUCK
2003
2003
$100,815.94
239B
VALLEY
TANDEM DUMP
LEAF BOX
2003
2003
$5,745.00
BED
239V
OLD DOMINION BRUSH
XV6000
LEAF VACUUM
2013
2013
$29,328.00
COMPANY
240
INTERNATIONAL
TANDEM AXLE
DUMP TRUCK
2003
2003
$100,815.94
240B
VALLEY
TANDEM DUMP
LEAF BOX
2003
2003
$5,745.00
BED
240V
OLD DOMINION BRUSH
XV6000
LEAF VACUUM
2013
2013
$29,328.00
COMPANY
241V
OLD DOMINION BRUSH
XV6000
LEAF VACUUM
2013
2013
$29,328.00
COMPANY
242
SWARTZ
WILDCAT
ROADPATCHER
2005
2005
$139,365.00
243
INTERNATIONAL
TANDEM AXLE
DUMP TRUCK
2014
2014
$165,316.43
243B
VALLEY
TANDEM DUMP
TANDEM DUMP BED
1989
1989
$2,500.00
BED
243V
OLD DOMINION BRUSH
XV6000
LEAF VACUUM
2013
2013
$29,328.00
COMPANY
244
INTERNATIONAL
TANDEM AXLE
DUMP TRUCK
2014
2014
$165,316.43
244B
VALLEY
SINGLE
LEAF BOX
1989
1989
$2,500.00
244V
TARCO
BIG T VAC
LEAF VACUUM
1989
1989
$14,979.00
245
ETNYRE
CENTENNIAL
DISTRIBUTOR
2000
2000
$111,494.98
246
SWARTZ
WILDCAT
ROADPATCHER
2001
2001
$129,445.00
248
STERLING
SINGLE AXLE
DUMP TRUCK
2004
2004
$82,461.00
248B
VALLEY
SINGLLEDDUMP
LEAF BOX
1989
1989
$2,500.00
BE
248V
OLD DOMINION BRUSH
XV6000
LEAF VACUUM
2012
2012
$29,328.00
COMPANY
249
INTERNATIONAL
TANDEM AXLE
DUMP TRUCK
1997
1997
$72,005.00
249B
VALLEY
TANDEM DUMP
LEAF BOX
1989
1989
$2,500.00
BED
249V
OLD DOMINION BRUSH
XV6000
LEAF VACUUM
2012
2012
$29,328.00
COMPANY
FOR LOCAL ROADS AND STREETS
SECTION V - EQUIPMENT INVENTORY
Part of State Form 54400 (8 -10)
'REET DIVISION 201
Year
of
Actual Cost('
Unit No
Make
Model
Description
Manufacture
Purchase
(w /o trade)
250
INTERNATIONAL
SINGLE AXLE
DUMP TRUCK
2000
2000
$77,997.00
2508
VALLEY
SINGLE
LEAF BOX
1989
1989
$2,500.00
250V
TARCO
BIG T VAC
LEAF VACUUM
1989
1989
$14,979.00
251
FORD
TANDEM AXLE
DUMP TRUCK
1998
1998
$68,310.00
2518
VALLEY
TANDEM DUMP
LEAF BOX
1989
1989
$2,500.00
BED
251 D
SNOW EQUIPMENT
1600 GAL.
ANTI ICING TANK
2001
2001
$17,231.00
SALES INC
252
FORD
TANDEM AXLE
DUMP TRUCK
1998
1998
$69,010.00
2528
VALLEY
TANDEM DUMP
LEAF BOX
1989
1989
$2,500.00
BED
252D
SNOW EQUIPMENT
1600 GAL.
ANTI ICING TANK
2002
2002
$14,759.00
SALES INC
252V
OLD DOMINION BRUSH
XV6000
LEAF VACUUM
2012
2012
$29,328.00
COMPANY
253
INTERNATIONAL
SINGLE AXLE
DUMP TRUCK
2000
2000
$77,997.00
2538
VALLEY
SINGLLEDDUMP
LEAF BOX
1989
1989
$2,500.00
BE
253V
TARCO
BIG T VAC
LEAF VACUUM
1989
1989
$14,979.00
254
INTERNATIONAL
SINGLE AXLE
DUMP TRUCK
2000
2000
$68,492.00
2548
VALLEY
SINGLLEDDUMP
LEAF BOX
1989
1989
$2,500.00
BE
255
FORD
TANDEM AXLE
DUMP TRUCK
1998
1998
$71,010.00
2558
VALLEY
TANDEM DUMP
LEAF BOX
1989
1989
$2,500.00
BED
255D
SNOW EQUIPMENT
1600 GAL.
ANTI ICING TANK
2002
2002
$14,759.00
SALES INC
256
STERLING
SINGLE AXLE
DUMP TRUCK
2004
2004
$82,461.00
2568
VALLEY
SINGLLEDDUMP
LEAF BOX
1989
1989
$2,500.00
BE
2578
VALLEY
SINGLLEDDUMP
LEAF BOX
1989
1989
$2,500.00
BE
258
FORD
TANDEM AXLE
DUMP TRUCK
1998
1998
$72,810.00
2588
VALLEY
TANDEM DUMP
LEAF BOX
1989
1989
$2,500.00
BED
258D
SNOW EQUIPMENT
1600 GAL.
ANTI ICING TANK
2001
2001
$17,231.00
SALES INC
262
FORD
SINGLE AXLE
DUMP TRUCK
1998
1998
$59,890.00
2628
VALLEY
SINGLLEDDUMP
LEAF BOX
1989
1989
$2,500.00
BE
262V
TARCO
BIG T VAC
LEAF VACUUM
1989
1989
$14,979.00
263
INTERNATIONAL
TANDEM AXLE
DUMP TRUCK
2011
2011
$166,486.45
2638
VALLEY
TANDEM DUMP
LEAF BOX
1989
1989
$2,500.00
BED
263V
TARCO
BIG T VAC
LEAF VACUUM
1989
1989
$14,979.00
264
INTERNATIONAL
TANDEM AXLE
DUMP TRUCK
2013
2013
$145,917.46
2648
VALLEY
TANDEM DUMP
LEAF BOX
1989
1989
$2,500.00
BED
FOR LOCAL ROADS AND STREETS
SECTION V - EQUIPMENT INVENTORY
Part of State Form 54400 (8 -10)
'REET DIVISION 201
Year
of
Actual Cost('
Unit No
Make
Model
Description
Manufacture
Purchase
(w /o trade)
264V
TARCO
BIG T VAC
LEAF VACUUM
1989
1989
$14,979.00
265
FREIGHTLINER
TANDEM AXLE
DUMP TRUCK
2008
2008
$125,556.00
265B
VALLEY
TANDEM DUMP
LEAF BOX
1989
1989
$2,500.00
BED
266B
VALLEY
SINGLE
LEAF BOX
1989
1989
$2,500.00
268
FREIGHTLINER
TANDEM AXLE
DUMP TRUCK
2006
2006
$104,660.00
268B
VALLEY
TANDEM DUMP
LEAF BOX
1989
1989
$2,500.00
BED
268V
OLD DOMINION BRUSH
XV6000
LEAF VACUUM
2012
2012
$29,328.00
COMPANY
275
DISPLAY SOLUTIONS
LED15
ARROW BOARD
2002
2002
$3,895.00
276
DISPLAY SOLUTIONS
LED15
ARROW BOARD
2002
2002
$3,895.00
280A
N/A
N/A
AIR HAMMER
N/A
N/A
N/A
281
FORD
SINGLE AXLE
DUMP TRUCK
1998
1998
$57,090.00
281B
VALLEY
SINGLLEDDUMP
LEAF BOX
1989
1989
$2,500.00
BE
281V
TARCO
BIG T VAC
LEAF VACUUM
1989
1989
$14,979.00
282
INTERNATIONAL
SINGLE AXLE
DUMP TRUCK
1997
1997
$72,005.00
282B
VALLEY
TANDEM DUMP
LEAF BOX
1989
1989
$2,500.00
BED
282D
SNOW EQUIPMENT
1600 GAL.
ANTI ICING TANK
2002
2002
$14,759.00
SALES INC
282V
OLD DOMINION BRUSH
XV6000
LEAF VACUUM
2012
2012
$29,328.00
COMPANY
283
INTERNATIONAL
TANDEM AXLE
DUMP TRUCK
1997
1997
$72,005.00
283B
VALLEY
TANDEM DUMP
LEAF BOX
1990
1990
$2,500.00
BED
283D
SNOW EQUIPMENT
1600 GAL.
ANTI ICING TANK
2002
2002
$14,759.00
SALES INC
283V
OLD DOMINION BRUSH
XV6000
LEAF VACUUM
2013
2013
$29,328.00
COMPANY
284
INTERNATIONAL
TANDEM AXLE
DUMP TRUCK
2013
2013
$145,917.46
284B
VALLEY
TANDEM DUMP
LEAF BOX
1989
1989
$2,500.00
BED
285
CHAMPION
C70A
MAINTAINER
1995
1995
$70,605.00
286
CHAMPION
C70A
MAINTAINER
1997
1997
$78,873.00
289
HUBER
M850A
MAINTAINER
1995
1995
$58,302.00
290
BOMAG
MPH100R
SOIL MIXER
1985
1985
$188,051.00
291T
BECK
MIGHTY MOVER
SKID LOADER TRAILER
1995
1995
$4,235.00
292
NEW HOLLAND
LS180
SKID LOADER
2004
2004
$36,469.00
292T
N/A
N/A
SKID LOADER TRAILER
1996
1996
$3,964.00
293
GEHL
6635DXT
SKID LOADER
1998
1998
$33,564.00
293T
BECK
MIGHTY MOVER
SKID LOADER TRAILER
1998
1998
$4,285.00
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION V - EQUIPMENT INVENTORY
Part of State Form 54400 (8 -10)
STREET DIVISION 2013
Year
of
Actual Cost(')
Unit No
Make
Model
Description
Manufacture
Purchase
(w /o trade)
294
PSI
M413XT
MAINTAINER
2005
2005
$85,600.00
295
STEPP
SMT
CRACK SEALER
2003
2003
$19,375.00
297
STEPP
1200
CRACK SEALER
1998
1998
$23,830.00
298
CASE
821
CASE LOADER
1992
1992
$96,950.00
299
CASE
921C
CASE LOADER
2000
2000
$231,374.00
299B
ACS
GRAPPLER
MULTI - PURPOSE BUCKET
2000
2000
N/A
911B
VALLEY
SINGLE
LEAF BOX
1989
1989
$2,500.00
913B
VALLEY
SINGLLEDDUMP
LEAF BOX
1989
1989
$2,500.00
913V
TARCO
BIG T VAC
LEAF VACUUM
1989
1989
$14,979.00
2270
TENNANT
ATLV4300
LITTER VACUUM
2002
2002
$23,416.00
467B
VELOCITY
TANDEM DUMP
LEAF BOX
2005
2005
$7,656.00
BED
463B
VELOCITY
TANDEM DUMP
LEAF BOX
2005
2005
$7,656.00
BED
417T
LAFARGE
3310701
THERMO MACHINE & TRAILER
2001
2001
$16,605.00
418T
INTERSTATE
INT714SAFS
7X14 UTILITY TRAILER
2006
2007
$1,520.00
418H
GENERAL
210
MOTORIZED POST HOLE AUGER
2005
2005
$705.00
419
CHEVROLET
4500
ROAD STRIPING TRUCK
2001
2001
$96,000.00
419F
ALLIS CHALMER
4900# CAP.
FORKLIFT
1986
1986
$6,500.00
ACC50LPS
419 -2
TITAN
3600
WALK BEHIND LOT STRIPING MACHINE
1992
1992
N/A
419 -3
BINKS
N/A
WALK BEHIND LOT STRIPING MACHINE
1987
1987
$2,700.00
419 -4
GRACO
LINE LAZER IV
WALK BEHIND LOT STRIPING MACHINE
2012
2012
$4,975.00
3900
419 -5
GRACO
GRIND LOAZER
LINE GRINDER
2011
2011
$6,100.00
419 -6
MILWAUKEE
4136
CORE DRILL
2005
2005
$1,553.00
419 -7
SAUBER
4410
STREET /TRAFFIC LIGHT POLE TRAILER
2001
2001
$8,257.00
419 -8
MSI
700# CAP.
STOP SIGN TRAILER
1998
1998
$856.00
419 -9
ONAN
GENSET
2 INCH TRASH PUMP
1985
1985
N/A
419T
INTERSTATE
INT714SAFS
7X14 UTILITY TRAILER
2006
2007
$1,520.00
420
GMC
C5500
BUCKET TRUCK
2009
2009
$117,200.00
421
CHEVROLET
2500
% TON 4X4 PICK UP TRUCK
2005
2005
$23,111.00
422
FORD
F350
1 TON 4X4 UTILITY TRUCK
2014
2014
$39,946.75
424
FORD
F250
Y4 TON 4X4 PICK UP TRUCK
2012
2012
$27,104.00
425
FORD
F250
Y4 TON 4X4 PICK UP TRUCK
2012
2012
$27,104.00
426
CHEVROLET
2500
Y4 TON 4X4 PICK UP TRUCK
2013
2013
$29,739.06
DIVISION
Unit No
427
428
429
430
432
433
434
435
436
437T
Make
CHEVROLET
CHEVROLET
FORD
CHEVROLET
AMERICAN SIGNAL
COMPANY
AMERICAN SIGNAL
COMPANY
AMERICAN SIGNAL
COMPANY
AMERICAN SIGNAL
COMPANY
WACKER NEUSON
KAUFMAN
FOR LOCAL ROADS AND STREETS
SECTION V - EQUIPMENT INVENTORY
Part of State Form 54400 (8 -10)
Model
2500
2500
F450
C4500
CMS -T332
CMS -T332
CMS -T333
CMS -T333
LTN6
FDWT8K22D
Description
Y4 TON 4X4 PICK UP TRUCK
Y4 TON 4X4 PICK UP TRUCK
PLATFORM TRUCK
BUCKET TRUCK
MESSAGE BOARD
MESSAGE BOARD
MESSAGE BOARD
MESSAGE BOARD
PORTABLE LIGHT TOWER
17000# CAPACITY EQUIPMENT TILT TRAILER
Yeai
Manufacture
2002
2002
1999
2004
2005
2005
2012
2013
2012
2013
of
Purchase
2002
2002
1999
2004
2005
2005
2012
2013
2012
2013
201
Actual Cost('
(w /o trade)
$24,148.00
$24,148.00
$70,900.00
$88,163.00
$16,395.00
$16,395.00
$17,122.00
$17,650.00
$7,460.00
$5,590.00
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION VI - CHANGES TO CERTIFIED ROAD /STREET MILEAGE
Part of State Form 54400 (8 -10)
Actual Mileage Change
Surface Type Dec 31 from prior ear Reason (s)
Portland Cement Concrete
72.32
None
No change
Hot or Cold Asphaltic Concrete
408.88
None
No change
Bituminous Surface Treated
Brick and Masonry
17.86
None
No change
Gravel and Stone
Unimproved
Total Miles
499.06
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION VII - REPORT OF FEDERAL AID FUNDS RECEIVED
Part of State Form 54400 (8 -10)
Instructions: Separate each phase of the project on a separate line.
PE should include all expenses paid to consultants for preliminary engineering, early coordination,
soil and site investigations, historical and archeological documentation.
Project Description
Project Phase
Federal Aid Category
Total Amount
Location
No
v
o
_
U)
=
~~Des
n
Q
F7
ui
U
U
Q
0
¢
v
7
a U
F
0
.0
E Z
U
ca
O�
m O
a ?
L��
O
a
ti ?
E
°' ca
ii cn
Edison Rd at Gordon Dr
1005764
X
X
$72,6521
$290,607
$363,259
W Western Ave at S Walnut St
600137
X
X
X
$25,600
$102,400
$128,000
Part of State Form 54400 (8 -10)
DATE:
DATE:
DATE:
DATE
DATE:
DATE:
Submitted by:
20 N/A
Engineer /Director
20 N/A
County Highway Supervisor
Approved:
N/A
20
Board of County Commissioners
Submitted by:
May 30, 20 14
May 30, 20 14
Paul South, P.E., Director of Streets
Approved:
May 30, 20 14
Mark Neal
Mayor or President of Town Council