Loading...
HomeMy WebLinkAbout6E(1) 6 C , SpU TN 8'''c•. mi.„11:0;v: /% z; Department of ol ,Ot � Community Investment 18 Memorandum April 24, 2014 TO: South Bend Redevelopment Commission FROM: David Relos, Economic Resources icY,' SUBJECT: Professional Services Proposal - Jones Petrie Rafinski High & Ireland Engineering Services This professional services proposal from Jones Petrie Rafinski (JPR) is to complete necessary right of way (r/w) legal descriptions for improvements to the High & Ireland intersection, which services the Erskine Plaza Shopping Center. Planned improvements to this intersection are to add dedicated left turn lanes into and out of the Plaza. To do so, r/w is currently being acquired. To accommodate the business' sign that is currently on the southwest corner, the planned permanent and temporary r/w needs to be shifted. By shifting the r/w the sign's setbacks meet current zoning requirements, and a variance would not have to be granted. Additionally, there is a drainage inlet at this corner, and a legal description for an easement to maintain the inlet is needed. As planned originally, the inlet was included in the permanent r/w. Staff requests approval of this professional services agreement in the amount of$750, to allow new legal descriptions to be prepared for the needed r/w and easement on this corner of the High & Ireland Improvement Project. 227 W.JEFFERSON BLVD. SOUTH BEND, IN 46601 I P: 574-235-9371 I FAX: 574-235-9021 I SOUTHBENDIN.GOV JIRJONES PETRIE RAFINSKJ Engineering Planning • GIS • Landscape Architecture • your one single source Surveying • Environmental • Renewable Energy • Architecture April 16, 2014 City of South Bend Community Investment 227 West Jefferson Blvd., Suite 1400 S South Bend, IN 46601 Attention: Mr. David Relos RE: HIGH AND IRELAND R/W ENGINEERING REVISIONS TO PARCEL 5, SOUTH BEND, INDIANA You have requested Jones Petrie Rafinski prepare a revised parcel plat and legal descriptions for Parcel 5 located at the southwest corner of Ireland Road and High Street. JPR will perform the following tasks: • Revise the legal descriptions for the permanent and temporary right of way per the preliminary design plans prepared by Christopher B. Burke Engineering. • Revise the Right of Way Parcel Plat. • Prepare a legal description for easement purposes for the inlet located on the property that is outside the Right of Way of High Street. • Set lath at the revised permanent and temporary right of way locations. JPR estimates the fee for performing these tasks to be $750.00. Work can begin upon receipt of a signed copy of this proposal and is anticipated to be completed within 2 weeks of receiving the signed proposal. Our services will be billed upon completion. Payment is due upon receipt of our invoice. Please confirm that you agree to the above terms of this letter by dating, signing and returning to me a copy of this letter, by fax at 574-232-4333 or email at jbarnes@jpr1source.com. Sincerely, Jeffrey S. Barnes, PS Professional Land Surveyor jprl source.com ,, South Bend IN 46601 574.232.4388 High & Ireland, Parcel 5 Revisions April 16, 2014 Page 2 AUTHORIZATION Proposal for revisions to Parcel 5 at High Street and Ireland Road, South Bend, IN, for a fee of $750.00. Proposal Accepted By: Authorized Signature Date Printed Name, Company Name Phone No. Billing Street Address Fax No. City, State, Zip Email The party that signs this proposal is directly responsible for all charges incurred during the course of our work. J:\Survey\Survey Proposals\City of South Bend120141High and Ireland Revised RW Engineering\2014-04-16 High and Ireland.Prop.doc