Loading...
HomeMy WebLinkAbout6B(1) Co a O) •'S�UTNB'•�-. /% - Department of : Community Investment Memorandum April 24, 2014 TO: South Bend Redevelopment Commission FROM: David Relos, Economic Resources `-d- ' SUBJECT: Professional Services Proposal - Ziolkowski Construction Inc. State Theatre façade terra cotta repair This professional services proposal from Ziolkowski Construction Masonry Restoration is to complete necessary terra cotta repair to the facade of the State Theatre (State). The attached pictures show two damaged areas, which are limited to the southwest corner of the building and above a second story window. Ziolkowski has done similar repairs to terra cotta on the nearby American Trust Place's south façade, among others. The State was at one time owned by the Commission, and when sold in 1993, a facade easement was retained on the Michigan St. frontage to protect this iconic building. This easement states the Commission agrees to maintain the west exterior façade (Michigan St.). This repair is needed to stabilize the terra cotta, with an epoxy adhesive being used to secure the fractured corner piece, and a patching material with applied finish to infill other missing pieces. Staff requests approval of this professional services agreement in the amount of$1,621, to allow the repair and stabilization of these two areas of the State's facade. 227 W.JEFFERSON BLVD. SOUTH BEND, IN 46601 I P: 574-235-9371 I FAX: 574-235-9021 I SOUTHBENDIN.GOV ZIOLKOWSKI Construction, Inc. 4 , General Construction & Design/Build Building Strong Relationships Since 1974 April 9, 2014 Mr. David Relos RECEIVED APR 10 7014 Department of Community Investment City of South Bend 227 West Jefferson Blvd. South Bend, IN 46601 Reference: State Theater David, Ziolkowski Construction will provide labor, equipment and material to perform the work as follows: Southwest Corner $1,326.00 1. Repair damaged terre cotta at the lower portion of corner with Jahn Stone Patch by Cathedral Stone Company 2. Apply epoxy adhesive to shard and reset 3. Finish to match existing as close as possible * Second Floor Window Head $ 295.00 1. Repair spalled terre cotta at window head with Jahn Stone Patch by Cathedral Stone Company 2. Finish to match existing as close as possible 3. City of South Bend to provide boomlift If Ziolkowski provides boomlift for repairs of second floor window head, add $512.00 for rental, pickup and delivery. Please contact me at 574-287-1811 if you have any questions. Respectfully submitted, ZIOLKOWSKI CONSTRUCTION, INC. idta ct. Brad Dennis Division Manager—Masonry Restoration 4050 Ralph Jones Dr.,South Bend,IN 46628 Phone(574)287-1811 Fax(574)234-0151 Committed to professionalism and excellence for the benefit of our clients,employees,and shareholders.