RESOLUTION OF THE SOUTH BEND REDEVELOPMENT COMMISSION
APPROVING AND AUTHORIZING THE EXECUTION OF
AN ADDENDUM TO THE MASTER AGENCY AGREEMENT
(Wayne Street Parking Garage Facade)
WHEREAS, effective January 1, 2014, the South Bend Department of
Redevelopment, acting by and through its Redevelopment Commission (the
"Commission") and the South Bend Board of Public Works (the "BPW ") entered into a
Master Agency Agreement which authorized the BPW to act as agent for and on behalf
of the Commission for certain projects during 2014; and
WHEREAS, pursuant to the Master Agency Agreement, the Commission desires
to add the Wayne Street Parking Garage Facade Project to the Master Agency
Agreement by way of this Addendum.
NOW, THEREFORE, BE IT RESOLVED by the South Bend Redevelopment
Commission as follows:
Section 1. The Commission hereby approves the Addendum to Master
Agency Agreement Wayne Street Parking Garage Facade Project and hereby
authorizes its execution in substantially the form attached hereto with such changes as the
Commission may deem necessary or appropriate upon the advice of counsel, said
execution thereof to be conclusive evidence of the Commission's approval of such
changes. The Clerk is hereby directed to file a copy of the Addendum with the BPW.
Section 2. This Resolution shall be in full force and effect after its adoption
by the Commission.
Section 3. Commission staff members are authorized to execute on behalf of
the Commission any documents necessary to carry out the intent of this resolution.
ADOPTED at a meeting of the South Bend Redevelopment Commission held on
February 27, 2014, at 9:30 a.m., in Room 1308, County -City Building, South Bend,
Indiana 46601.
A
i E.'Inks, Secretary
Bend Redevelopment Commission
CITY OF SOUTH BEND,
DEPARTMENT OF
REDEVELOPMENT
Marcia I. Jones, ident
South Bend Redeve pment Commission
ADDENDUM TO
MASTER AGENCY AGREEMENT
(Wayne Street Parking Garage Facade)
This Addendum to Master Agency Agreement (this "Addendum "), made and
entered into as of the 27`h day of February, 2014, by and between the South Bend
Department of Redevelopment, acting by and through its Redevelopment Commission
(the "Commission ") and the City of South Bend, Indiana, a municipal corporation duly
organized and existing pursuant to the laws of the State of Indiana, acting by and through
its Board of Public Works (the "BPW ") for purposes of the Commission designating the
BPW to act as the Commission's agent to undertake the Wayne Street Parking Garage
Facade Project (the "Project ").
WHEREAS, effective January 1, 2014, the Commission and the BPW entered
into a Master Agency Agreement which authorized the BPW to act as agent for and on
behalf of the Commission for certain projects during 2014; and
WHEREAS, pursuant to the Master Agency Agreement, the Commission desires
to add the Wayne Street Parking Garage Facade Project to the Master Agency
Agreement by way of this Addendum.
NOW, THEREFORE, in consideration of the mutual covenants and promises
contained herein, and for other good and valuable consideration, the receipt of which is
hereby acknowledged, the BPW and the Commission agree as follows:
1. The Commission hereby empowers and appoints the BPW, pursuant to the
Master Agency Agreement, to act as the Commission's agent for the limited purpose of
contracting for and managing the completion of the Project, the scope of said Project
being more specifically described in "Exhibit A ", attached hereto and made a part hereof.
2. All of the terms and conditions of the Master Agency Agreement shall
control this appointment and this Addendum shall be attached to the Master Agency
Agreement.
3. Commission members are authorized to execute on behalf of the
Commission any documents necessary to carry out the intent of this Addendum.
IN WITNESS WHEREOF, the undersigned execute this Addendum to Master
Agency Agreement to be effective as of the date first written above.
ATTEST:
South Bend Redevelopment Commission
CITY OF SOUTH BEND,
DEPARTMENT OF
REDEVELOPMENT
South Bend Redevelopment Commission
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
Gary Gilot, President
Kathryn Roos, Member
David Relos, Member
Patrick Henthorn, Member
Brian Pawlowski, Member
ATTEST:
Linda Martin, Clerk
Exhibit "A"
Wayne Street Parking Garage Facade
Proiect Scope and Description:
Retain the services of Alliance Architecture to engineer, design, write bid specs, help
award, and construction oversight for a two phased approach to remove and replace the
pre -cast concrete panels on the Wayne Street Parking Garage; study options to enhance
the fapade for the second phase.
Budget: $60,900
ALLIANCE
February 20, 2014
Mr. David Relos
Economic Resources
City of South Bend
Department of Community Investment
1316 County-City Building
South Bend, IN 46601
RE: PROPOSAL FOR ARCHITECT'S SERVICES
for the
ST. JOSEPH It WAYNE STREET PARKING STRUCTURE
South Bend, Indiana
Dear David:
We thank you for this opportunity to submit to you our Proposal to provide architectural and
engineering consultant services to the City of South Bend (Owner) for the Exterior Facade
Renovation to the St. Joseph /Wayne Street Parking Structure. Alliance Architects (Architect)
shall provide Services as listed herein.
PROJECT UNDERSTANDING
The Project Site is located at the northwest comer of St. Joseph Street and Wayne Street in
downtown South Bend.
The City, in addition to the desired exterior aesthetic improvements, requires a long -term
solution to the on -going deterioration of the existing precast brick veneer system. Alternative
methods of repair and /or replacement of the existing facade system have been submitted to the
City by Carl Walker, Inc. ( Facade Study dated January 23, 2013). The Architect will retain the
consulting services of Carl Walker, Inc.
The City will consider a phased project delivery approach to the renovation in order to eliminate
the concerns of public safety (ie. Phase -1: Encapsulate or remove the deteriorating precast
brick veneer facade system; Phase -2: Design and installation of new facade).
The Project Budget is $650,000.
ARCHITECT SCOPE OF SERVICES
1. PROJECT ADMINISTRATION
a. The Architect shall manage the Architect's services and administer the Project. The
Architect shall consult with designated representatives from the City of South Bend to
929 Lincolnway East, Suite 200 1 South Bend, Indiana 46601 1 Tel 574.288.2052 1 Fax 574.288.2550 1 www.alharch.com
Proposal
Page 2
review the specific objectives, schedule, and construction budget to ascertain the
requirements of the Project.
b. When Project requirements have been sufficiently identified, the Architect shall prepare
and periodically update, a Project Schedule that shall identify milestone dates for design
services furnished by the Architect, completion of design documentation provided by the
Architect, construction procurement, commencement of construction, and Substantial
Completion of the Work.
c. The Architect shall engage the services of Carl Walker, Inc., and shall research Project
Phasing, applicable design criteria, and shall consider the value of alternative materials
and building systems, together with other considerations based on program, budget and
aesthetics in developing the design for the Project.
d. The Architect shall submit design documents to the Owner at intervals appropriate to
the design process for purposes of evaluation and approval by the Owner. The Architect,
upon request of the Owner, shall make a presentation(s) to explain the design of the
Project.
e. The Architect shall assist the Owner in connection with filing documents required for the
approval of government authorities having jurisdiction over the Project, and for
competitively bidding the Project.
2. DESIGN DEVELOPMENT PHASE
a. The Architect shall discuss with the Owner the Owner's program, schedule, budget for
the Cost of the Work, and alternative approaches to design /engineering and
construction of the Project, including the feasibility of incorporating environmentally
responsible design approaches. The Architect shall reach an understanding with the
Owner regarding the Project requirements, including all necessary Phasing to address
public safety concerns of the deteriorating precast brick veneer facade system.
b. Based on the Project requirements, the Architect shall prepare Design Documents
consisting of drawings and other documents appropriate for the Project and a
preliminary estimate of the Cost of the Work for the Owner's approval.
c. The Architect shall submit the Design Documents and preliminary estimate of the Cost of
the Work to the Owner, and request the Owner's approval.
3. CONSTRUCTION DOCUMENT PHASE
a. Based on the Owner's approval of the Design Documents and preliminary estimate, the
Architect shall prepare for the Owner's approval, Construction Documents consisting of
Drawings and Specifications setting forth in detail the requirements for the construction
of the Work.
b. The Architect shall update the estimate for the Cost of the Work.
Proposal
Page 3
c. The Architect shall submit the Construction Documents and estimate to the Owner,
advise the Owner of any adjustments to the estimate, and request the Owner's
approval. The Documents shall be submitted for Owner review at 90% completion.
The Architect, following the Owner's approval of the Construction Documents and the
latest preliminary estimate of Construction Cost, shall assist the Owner with bidding,
awarding, and preparing contracts for construction.
4. BIDDING PHASE
a. The Architect shall assist the Owner with the advertising, bidding, bid evaluation,
awarding, and preparing contracts for construction (Owner - Contractor Agreement).
b. The Architect understands that the possible Phasing of the Project may require separate
Bidding Documents in order to expedite a safe solution to encapsulate or remove the
deteriorating precast brick veneer facade system.
S. CONSTRUCTION PHASE
a. The Architect shall review and certify the amounts due the Contractor.
b. The Architect shall review and approve or take other appropriate action upon the
Contractor's submittals such as RFI's, Shop Drawings, Product Data and Samples.
c. The Architect shall visit the site at intervals appropriate to the stage of construction, to
determine, in general, if the Work observed is being performed in a manner indicating
that the Work, when fully completed, will be in accordance with the Contract
Documents.
d. The Architect shall attend all construction progress meetings.
e. The Architect shall verify that all Project Closeout requirements have been completed,
including punch -list inspection, final inspection, written warranties and final Certificate
for Payment.
BASIS OF COMPENSATION
FEE = Not -to- Exceed Sum of sixty thousand dollars ($60,000).
Progress payments for each Phase of service shall total the following percentages of the total
compensation payable:
Design Development Phase:
30%
Construction Documents Phase:
45%
Bidding Phase:
05%
Construction Phase:
20%
Total Compensation
100%
Proposal
Page 4
Additional Services not specifically identified in the SCOPE OF SERVICES, shall only be
performed with authorization from the Owner. The fee for these services shall be computed on
an hourly rate as follows:
Principal $150 /Hour
Project Architect $105 /Hour
Engineering Consultant $105 /Hour
CADD Technician $ 75 /Hour
Administrative Support $ 55 /Hour
REIMBURSABLE EXPENSES
1. Shall be in addition to the Fee paid to the Architect.
2. Shall include expenses incurred by the Architect and our consultants in the interest of the
Project including printed copies, plotted reproductions and postage, and shall be invoiced at
the rate of 1.10 multiplied times the direct expense incurred.
EXPENSES = Not -to- Exceed Sum of nine hundred dollars ($900).
We trust that these general terms meet your approval. If this Proposal is acceptable to you,
please sign and date the two copies and return one copy to our office. Once we have your
approval, we will complete an American Institute of Architects (AIA) Form of Agreement
Between Owner and Architect (AIA Doc. B104- 2007). We appreciate this opportunity and look
forward to working with you on the successful completion of this Project.
Respectfully submitted,
ALLIANCE ARCHITECTS
1VJJIt* N 1-Z. --
William R. Lamie RA, AIA
Principal
ACCEPTED BY:
DATE: