Memorandum
Monday, January 27, 2014
TO: Redevelopment Commission
FROM: Ann Kolata & Chris Dressel
SUBJECT: Proposal from Hull regarding Environmental Delineation and Sampling in the area of
Ignition Park
Attached is a proposal from Hull for additional environmental work in the area of Ignition
Park. Ignition Park has been enrolled in the Indiana Department of Environmental
Management's (IDEM) Voluntary Remediation Program (VRP) for a number of years. While
much of the soil and groundwater has been previously sampled, additional work is needed
in order to prepare a revised Remediation Work Plan for the VRP project. This proposal
addresses a number of tasks that must be completed including:
Preparation of a Sampling and Analysis Plan for on- and off -site soil and groundwater
sampling.
Preparation of an updated Health and Safety Plan and Quality Assurance Project Plan
as requested by IDEM.
Coordination with IDEM regarding next steps for moving through the VRP process.
Some additional soil sampling.
Coordinate evaluation of any potential vapor intrusion issues.
Installation of temporary and permanent groundwater sampling points and sampling of
the groundwater.
Conduct quarterly groundwater monitoring for eight quarters.
Evaluate groundwater remedies (depending on results of groundwater sampling)
Restrict use of groundwater through establishment of an Administrative Control Area
under St. Joseph County Code limiting the installation of private drinking wells.
Since the area is already served by the City of South Bend water department
this will not cause problems within the area.
The proposal from Hull provides additional detail on each of these items. The work will be
billed as tasks are performed and has a "not to exceed" cap of $300,778. The final cost
could be less depending on the results of the soil groundwater sampling. The extent of this
work has been anticipated for several years and the funds are available as part of the
Studebaker /Oliver project.
227 W. JEFFERSON BLVD. SOUTH BEND, IN 46601 1 P: 574- 235 -9371 1 FAX: 574 - 235 -9021 1 SOUTHBENDIN.GOV
Hull is prepared to move forward as soon as this proposal is approved and expects to have
the groundwater sampling completed by the end of February. The rest of the work will take
place after the results of the sampling are known, analyzed and discussed with IDEM.
227 W. JEFFERSON BLVD. SOUTH BEND, IN 46601 1 P: 574 - 235 -9371 1 FAX: 574- 235 -9021 1 SOUTHBENDIN.GOV
January 27, 2014
Mr. Chris Dressel
Planner and Bicycle Coordinator
City of South Bend Department of Community Investment
227 West Jefferson Blvd, 13"' Floor
South Bend, Indiana 46601
RE: DRAFT Proposal to Conduct On- and Off -Site Groundwater Delineation and Sampling,
Coordination of Any Potential Vapor Intrusion Evaluations, and Other Necessary Steps for
Additional Assessment Activities at Ignition Park (the Former Studebaker Manufacturing Complex)
Located Near Sample Street and Prairie Avenue, South Bend, Indiana; SB1072.400.0002.
Dear Mr. Dressel:
Hull & Associates, Inc. (Hull) is pleased to present the City of South Bend (Client) the following proposal to
provide professional engineering services for the above - referenced project. The purpose of this document
is to establish the Scope of Work as we understand it and to provide a fee schedule for the project. This
SrRSRZC6rH4-hV0!HuQ& A\XRFIDVW ,nF.'V(Hu(W rHcommendations for additional tasks needed to conduct
additional assessment activities and prepare an amended Indiana Voluntary Remediation Program (VRP)
Remediation Work Plan (RWP) for land at Ignition Park (the Site, also known as Area A and /or the former
Studebaker manufacturing complex) and additional off -site properties.
Site Physical Setting and Background
The Site is comprised of several parcels totaling approximately 79.5 acres (H / -) of land located southeast
of the intersection of Sample Street and Prairie Avenue in South Bend, Indiana.
Operations under Studebaker Corporation, from as early as 1927 to the early 1960s, consisted of a
foundry, lumberyard, and manufacturing facilities, primarily dedicated to the manufacture of automobiles.
) R(MwwlnJ Wl`f FHVeD\)Vn RI 6N6&E DN+'VRSHrD\LVnVDVYhe Site, the majority of the Site was subdivided and
sold to various business entities. Although the City is in the process of establishing new parcels at the Site,
all former parcels but one comprising the Site are currently vacant. Various stages of infrastructure
improvements (e.g., road construction and utility installation) have occurred or are occurring in an area
generally limited to the southern third of the Site, and Hull understands that one or more parcels along
Sample Street may be redeveloped in 2014.
Multiple environmental assessments have been conducted at the Site. These assessments included sampling
and testing of surface and subsurface soils and groundwater for chemicals of concern (COCs) including
volatile organic compounds (VOCs), total petroleum hydrocarbons (TPH), semivolatile organic compounds
(SVOCs; also herein referred to as polynuclear aromatics (PNAs)), Resource Conservation and Recovery
Act (RCRA) metals, Target Analyte List (TAL) metals and /or polychlorinated biphenyls (PCBs).
During the process of conducting the additional environmental assessments, IDEM requested in 2003 -2004
that the City submit a RWP to address impacts in soil identified at the Site. Despite suggestions from the
City and Hull that a RWP for soils was premature in the absence of a complete understanding of the
distribution of impacts to soils at the Site, Hull submitted a RWP for soils in April 2004. Following the
submittal of the April 2004 RWP, IDEM requested additional assessment for soils and groundwater.
Additional on- and off -Site assessment activities continued through 2011 -2012.
8470 Allison Pointe Boulevard, Suite 124, Indianapolis, Indiana 46250
800.241.7173 614.793.9070 fax www.hullinc.corn
Mr. Chris Dressel
SB1072.400.0002
January 27, 2014
Page 2
In September 2012, following further discussions with IDEM, Hull submitted a Comprehensive Environmental
Summary Report for the Site that summarized all environmental assessment work completed at the Site to
date. The summary report acknowledged that additional off -Site assessment of groundwater would be
necessary and presented a general path forward for that additional assessment. While the direction of
the future remedial approach for groundwater is yet to be determined, it currently appears that the main
driver for the remedial approach will center upon ensuring that the groundwater to indoor air exposure
pathway for both existing and future structures is incomplete for both on- and off -Site receptors. Minor
historical detections of COCs in soils in isolated areas across the Site may require additional assessment
and /or handling during future unspecified redevelopment activities, but are not expected to materially
impact the overall remedial strategy for the Site.
In April 2013, IDEM responded with comments to the Comprehensive Environmental Summary Report. The
City and Hull have engaged in verbal and electronic mail correspondence with IDEM on the path forward,
but have not yet fully and formally responded to IDEM'VP RVWHFHn\NYrNft FRrrespondence. In general
terms, IDEM, the City, and Hull agree that additional on- and off -Site assessment activities to evaluate the
vertical and horizontal distribution of VOCs in groundwater are necessary prior to the submittal of a RWP.
However, the extent to which those assessment activities are necessary has not been resolved, as discussed
below.
This current proposal presents, on a time and materials, not -to- exceed basis, a scope of work and costs to
implement steps that will likely be necessary to complete additional assessment activities, prepare an
amended RWP, and, once approved by IDEM, implement the RWP to ultimately receive from IDEM a
Covenant Not to Sue pursuant to the VRP. This current proposal also incorporates tasks required to
evaluate any potential vapor intrusion issues on- and off -Site. The following additional activities are
proposed:
Task 1 Prepare Various IDEM VRP Documents
A Sampling and Analysis Plan (SAP) detailing the locations, sampling methods, and laboratory analyses
proposed for the next stages of on- and off -Site soil and groundwater sampling must be prepared and
approved by IDEM. The SAP will explain field activities that will be completed in Tasks 3 and 4 as
described below. IDEM has also requested that an updated Health and Safety Plan (HASP) and n uality
Assurance Project Plan (n APP) be submitted for their review and approval. Hull proposes to submit
revised versions of the existing SAP and existing n APP firMRr ,D(0 'V FRnV- G+D\Jyn, Y" I ROw wLW/Dn
updated HASP prior to the initiation of field activities.
This task includes communication with the IDEM regarding next steps for additional assessment activities at
the Site, strategic discussions to efficiently further guide the Site through the IDEM VRP, and meetings with
the City to discuss approaches for evaluating any potential vapor intrusion issues at on- and off -Site
properties as necessary.
Task 2 Coordinate Evaluation of Any Potential Vapor Intrusion Issues
Hull proposes to coordinate efforts with the City, the IDEM, and other interested parties to evaluate any
potential completeness of the groundwater to indoor air exposure pathway that may exist on- or off -Site.
Hull assumes that our coordination efforts will entail attendance at meetings, written and telephone
correspondence, and communication with IDEM as deemed appropriate.
Hull proposes a comprehensive scope of work to evaluate whether any potentially complete exposure
pathway may exist at current or future on- or off -Site structures.
Mr. Chris Dressel
SB1072.400.0002
January 27, 2014
Page 3
Should any potentially complete vapor intrusion exposure pathways be identified, depending upon the
nature and extent of the potential vapor intrusion i%H, Hu®V\f+vLFHVP Dy InFOO-i V1H I R(MwwlnJ W"..
a. Task 1: Enaineerina review of facility systems at current or future structures: This task
would primarily consist of an in -depth review of available structural documentation,
including architectural and mechanical design /construction documentation.
b. Task 2a• Interview current operations & mainWMDnFH V491 I DnG RwnHr'V rHSrHV+\DNb1 -V
This task would include interviews of any designers, staff, and /or appropriate
maintenance service providers to clarify current or proposed heating, ventilation, and air
conditioning (HVAC) system operations..
C. Task 2b• Validate current or proposed HVAC control conditions: This task may include an
evaluation of the proposed HVAC system, or functional tests of an existing HVAC system
to evaluate technical details such as air supply and exhaust quantities.
d. Task 2c• Measure and validate existing HVAC airflow quantities: If appropriate for an
existing HVAC system, for this task, Hull may measure, through industry standard
procedures, the facility outside air and exhaust airflow quantities.
e. Task 2d• Measure and validate existing_ building pressures: If appropriate for an existing
structure, this task would entail detailed evaluations such as measurement of current
building pressure relative to the outdoors at both minimum and maximum outside air
operational conditions.
f. Task 2e• Determination of Beneficial Outside Air n uantity: If data collected during Task
2d at an existing structure suggest that an HVAC system may be enhanced to maintain an
industry accepted positive building pressure, Hu ®P Dy FRP S(EWt' 7D\N 2H DVVM &LWV
discretion.
Hull will conduct Tasks 1 and 2a. through 2d. above in a step -wise manner to control costs and realize
efficiencies where feasible. Hull will initially complete Tasks 1 and 2a above, should any potential current
or future vapor intrusion issues be identified. Next, as deemed appropriate, Hull will conduct Task 2b
above, should the results gained from the completion of Tasks 1 and 2a suggest that Task 2b will provide
meaningful results. Finally, Hull will complete Tasks 2c, 2d, and 2e above should they be deemed
necessary and meaningful, and only subject to specific prior written authorization by the City. Should
they be identified as necessary, Hull offers that the costs to complete Tasks 2c, 2d, and 2e concurrently
could result in relatively significant savings by realizing efficiencies from a single mobilization, reduced per
diem costs, etc. Should it be deemed that Tasks 2c, 2d, and 2e are necessary, Hull commits to evaluating
the most reasonable, cost - effective, and meaningful approach with the City prior to seeking authorization
for Tasks 2c, 2d, and 2e.
Task 3 Install Temporary and Permanent Groundwater Sampling Points
This Task will begin with a Site visit to evaluate the presence and condition of all on -site monitoring wells,
as well as to mark boring locations before public utility locators are contacted.
Additional on -Site groundwater sampling (through the installation of permanent monitoring wells, as
presented below) to evaluate the potential impact from COCs associated with the former Studebaker
operations is required. Also, as we have discussed, an evaluation of the extent to which off -Site sources
may have impacted groundwater underlying the Site is necessary. The installation and sampling of a
series of temporary groundwater monitoring points in the vicinity of the area generally bounded by
hendall Street (and alley to the west), Edward Street, Scott Street, and Indiana Avenue south and west of
the Site (i.e., across the upgradient sectlRn RI J rRunGwDWIF I nW%lnJ V1H 61]WV\Ru\%H`MDrFH (PwIJ(MIJG1n
Mr. Chris Dressel
S61072.400.0002
January 27, 2014
Page 4
evaluating where off -Site sources may be contributing to the groundwater impacts that have been
observed at the Site.
In addition, groundwater samples from nested temporary locations at up to eight additional locations
downgradient (i.e., north and east of the Site) are proposed to be collected from within City right -of -way
in Lafayette Boulevard and in the vicinLWRI \W ",vy 7RwHr" SrRSHrWDnd from within City right -of -way in
Main Street between the railroad tracks and Monroe Street to evaluate the downgradient distribution of
chlorinated VOCs.
In general, our proposed approach entails defining the vertical extent of chlorinated volatile organic
compounds (VOCs) upgradient of AMW -1 S (shallow), AMW -11 (intermediate), and AMW -1 D (deep)
(located at the immediate southwest corner of the Site) by installing four relatively shallow, intermediate,
and relatively deeper temporary sampling points (installed at four nested sampling locations) within the
area generally bounded by hendall Street (and alley to the west), Edward Street, Scott Street, and
Indiana Avenue south and west of the Site; then installing relatively shallow and relatively deeper
temporary sampling points in the vicinity of Lafayette Boulevard (4 nested sampling points) and Main
Street (4 nested sampling points) as discussed above.
This task will begin with the advancement of temporary screens using direct -push technologies (e.g., a ST-
15 Hydropunch) to a shallow depth (i.e., 26 to 30 feet below ground surface (bgs)), an intermediate depth
of approximately 35 to 39 feet bgs, and, for upgradient locations, at a deeper depth of approximately
45 to 49 feet bgs, subject to approval of these IocationVlrRP V1N &O-bVVBRDrGRI 3uEU : RrIW(B3: ).
The locations may be adjusted slightly in the field based on field observations such as utility locations, etc.
Hull will work with the drilling subcontractor and the appropriate City and St. Joseph County authorities to
arrange for access for the work and to clear utilities and to prepare appropriate permits for drilling in the
right -of -way. Adjacent property owners will be notified by certified mail prior to the initiation of any
drilling activities. Drill cuttings and sample purge and decontamination water will be containerized and
placed at a location designated by the City.
At each location where groundwater sampling is to be conducted, the borehole will initially be advanced
to the deepest depth proposed for that location, at which point the outer casing of the sampling system will
be withdrawn to expose a four foot long stainless steel wire wrapped screen. Once the screen is exposed,
Hull will measure the static water level and lower a decontaminated Waterra foot -valve sampling pump or
peristaltic pump to purge the equivalent of five well volumes of water to develop the aquifer surrounding
the screen. Following extraction of each well volume, Hull will measure pH, temperature and conductivity
to demonstrate that representative groundwater is being samplHd. ,n addition, Hull's rHprHsH ntativH will
note if there is a visible sheen on the extracted water. After development, the temporary well will be
allowed rest for approximately 20 minutes prior to sample collection. Following purging, Hull will collect
groundwater samples that will be pumped through the Waterra or bladder pump tubing at a flow rate of
less than 100 ml/min. pamples will be transferred directly into laboratory - preserved sample containers
and placed on ice in a cooler.
Following collection of each sample, Hull will retrieve and decontaminate the Waterra foot -valve pump by
washing it with Alconox and water and rinsing it with deionized water. In addition, the sample tubing will
be replaced between each sampling interval. The groundwater sample in the upper portions of the
aquifer (i.e., shallow and intermediate, as appropriate) will be collected by withdrawing the screen to the
appropriate depth and purging and collecting a groundwater sample as described above. The process
for purging and collecting the relatively shallower groundwater sample will then be completed as
Mr. Chris aressel
pB1072.400.0002
gcinuary 27, 2014
rrage 5
described above. Between each of the sampling locations, the drilling rods and well screen will be
decontaminated by washing with Alconox and water solution and rinsing with deionized water.
r p to 28 groundwater samples plus 20 n A/n C samples, collected from the temporary boreholes using
direct -push technologies, will be analyzed for s I Cs. Five field blanks and five trip blanks will also be
analyzed for s I Cs. Costs for the laboratory analyses assume i evel Is data packages will be provided
by the laboratory, as required by the IaEM s om
Following installation of the temporary sampling points, eight deep and shallow nested monitoring wells
will be installed on -pite to further evaluate the potential presence of Cl Cs in groundwater along the
western perimeter of the pite (along prairie Avenue /Chapin ptreet); and off -pite to further evaluate the
downgradient distribution of s I Cs north and east of the pite. Final locations of permanent monitoring
wells will be determined during proposed meetings with the City, its outside counsel, and Mr. Ed ptefanek
of t eaver -Boos Consultants. poil borings associated with the proposed monitoring wells will be drilled
using 4.25 -in., inside - diameter hollow -stem augers and continuously sampled using 24 -in. split -spoon
samplers to the appropriate depth (i.e., either 30 feet bgs or 45 feet bgs). pimilar to the locations of the
direct -push sampling points, the final locations of the monitoring wells may be modified based on field
observations. Although the deeper boring at each location will be continuously sampled, soil samples are
not proposed to be submitted for laboratory analyses as part of the monitoring well installation.
Monitoring wells will be constructed of pchedule 40 rm C slotted screens and risers. I nce the targeted
depth has been reached, the well column will be slowly lowered to the base of the borehole. A clean silica
quartz sand filter pack will be placed around the screen and will extend no more than two feet above the
top of the screen. podium bentonite chips or pellets will then be placed on top of the sand pack. Above
the chips or pellets, a thick bentonite slurry will be pumped into the annular space using a tremie pipe to a
depth of approximately three feet below ground surface. The remaining three feet will be filled with
concrete to anchor a flush -mount manhole.
Monitoring wells will be developed following installation to remove fines that may have entered the well
screen or filter pack during installation. t ell development activities will continue until pH, temperature,
and conductivity have stabilized for three consecutive well volumes, or until five well volumes have been
removed, whichever is greater. aevelopment waters will be collected and stored in a al T approved 55-
gallon drum. Costs to remove, transport, and dispose of approximately 52 55- gallon drums of
containerized groundwater and drill cuttings (which are presumed to be non - hazardous) are included in
this task.
Following the installation of these newer monitoring wells, the top of casing and ground elevations of the
new wells will be surveyed so that the groundwater elevations measured in these wells can be compared
relative to the other wells in the monitoring network.
Task 4 Conduct Quarterly Groundwater Monitoring
Following the installation of new monitoring wells, a routine of quarterly groundwater sample collection
from all monitoring wells is proposed. This will establish a baseline and, after several quarters, will begin
to allow for seasonal trend analysis. After four to six quarters, a sufficient trend should be established to
allow for an analysis of whether certain monitoring wells can be removed from the quarterly sampling
routine, with IaEM concurrence.
Mr. Chris aressel
pB1072.400.0002
gcinuary 27, 2014
rrage 6
In the meantime, however, this estimate assumes that quarterly groundwater samples will be collected from
all existing and newly - installed monitoring wells on- and off -pite (an estimated total of 37 monitoring
wells) for 8 quarters.
d roundwater samples will be collected from all newly installed monitoring wells and submitted to the
laboratory for s I C analysis using r .p. En-4 Method 8260. auplicate samples will be collected at
randomly selected monitoring well locations. Field /equipment blanks will also be collected and submitted
along with a trip blank for analysis as part of n A/n C of field procedures. rrurge and decontamination
waters will be collected and stored in r .p. al T- approved 55- gallon drums. Costs to remove, transport,
and dispose of eight 55- gallon drums of containerized groundwater and drill cuttings (which are presumed
to be non - hazardous) are included in this task.
For the proposed sampling events, in lieu of traditional low -flow sampling methods that have been
employed at the pite previously, Hull proposes to deploy passive diffusion bag (ma B) samplers in all
monitoring wells, which are a significantly more cost - effective sampling methodology that has been
accepted by IaEM. rraBs are polyethylene bags filled with analyte -free water that are hung in monitoring
wells for approximately 14 days. Field personnel return to the monitoring well, retrieve the sampler, and
collect the sample by filling sampling vials in the same manner as traditional methods. pignificant savings
are realized by reducing mobilization, purging, and sampling time; by minimizing the volume (and thereby
cost and environmental footprint) of field materials such as low -flow tubing; and by eliminating most
equipment rental costs. iaboratory analytical subcontractor costs for this Task include the cost of moBs for
each well, and for i evel Is n A/n C reporting by the laboratory. This estimate assumes that the City and
Hull will succeed in gaining IaEM approval to cease sampling groundwater for metals, which should be
acceptable given the proposed restriction of groundwater use as discussed in Task 5 below. A brief draft
letter report documenting the results of each quarterly sampling event will be prepared and submitted to
the Client for review. I nce the draft letter report is reviewed by the Client and finalized by Hull, a copy
will be submitted to the IaEM s om
Task 5 Evaluate GW Remedies Restrict GW Use, and Amend the RWP
I nce the extent of downgradient groundwater impacts, the current status of groundwater impacts on -pite,
and the potential off -pite [i.e., south and southwest (upgradient)] sources that may be contributing to
groundwatHr HntHring thH 6itH's southHrn Eoundary arH better understood by the activities to be completed
in steps 3 and 4 above, the prior remedy (i.e., EOST") that was pilot tested at the nearby I liver Industrial
3ark — and shown to EH HI I I -FtivH — will EH Hvaluated for additional applications. As the groundwater in-
situ treatment technology market has evolved in the last 3 -4 years, we will commit to evaluating similar
chemistries that may offer a cost and /or effectiveness advantage. aepending upon the results of the
groundwater sampling proposed herein, the actual necessity of a groundwater remedy (i.e., beyond
engineering and /or institutional controls) will be evaluated first and foremost prior to the recommendation
of any groundwater remediation technology.
As we have discussed previously, Hull recommends that the City effectively render incomplete the
groundwater ingestion exposure pathway at and in the vicinity of the pite by ensuring that pt. g:)seph
County Code 52, pection 52.042 is enforced, which prohibits the installation of wells for potable use where
a municipal water source is available, and pection 52.043 is implemented for the vicinity of the pite, which
governs the establishment of an Administrative Control Area (ACA). The language of pection 52.043,
whereby an ACA is established, contains additional relatively far- reaching yet flexible provisions to
further restrict exposure to groundwater when a threat to human health may be present. Hull and the
City's outsidH FounsH haves alrHady HngagHd thH 6t. gDseph County Health aepartment to begin the
process of establishing an ACA, and will continue to pursue this effort. t e are confident that once the
Mr. Chris aressel
pB1072.400.0002
gunuary 27, 2014
rrage 7
ACA is established, the groundwater ingestion exposure pathway will officially be rendered incomplete,
thereby eliminating the need to sample groundwater on- and off -pite for any metals concentrations.
The results of the evaluation of the proposed groundwater remedy, the extent to which a future remedy is
necessary based on the additional groundwater delineation and monitoring, and the progress of
establishing the ACA will be summarized in a of m A draft of the forthcoming amended of m will be
provided to the City and its outside counsel prior to finalization and submittal to IaEM.
SCHEDULE
Hull can begin coordinating the additional groundwater investigation and evaluation of any potential
vapor intrusion issues immediately, subject to your approval of this proposal. Assuming our drilling
subcontractor remains reasonably available, we anticipate all drilling and initial groundwater sampling
activities will be completed by the end of February 2014.
COMPENSATION
A breakdown of costs is attached as Table 1. The fees represent a time and materials, not -to- exceed fee
structure basis, and have been developed based on our estimate of hours for each labor category
expected to be involved in the project. The project will be billed on a four -week basis with payment due
to Hull within thirty days after receipt of an invoice.
ADDITIONAL WORK
Additional work beyond the pcope of t ork defined herein shall not be performed until such time as an
amendment to this proposal, including the scope of the additional work and associated costs, has been
prepared in writing to address the additional work and said amendment has been approved by the Client
in writing.
ppecific items not within the pcope of t ork on this project include, but are not limited to the following:
1. collection of more than 59 groundwater samples (including n A/n C samples) to be
analyzed for s I Cs in accordance with r .p. Em4 Method 8260 per quarterly sampling
event;
2. collection of indoor air and /or sub -slab vapor samples as may be deemed appropriate
by Hull Task 2 above; and
3. disposal of groundwater or soil that is determined to be hazardous.
k o amendment to this proposal shall be required in situations where additional work may be necessary, as
a result of unanticipated or unidentified conditions including, but not limited to, the presence of unidentified
or mislocated buried utilities, structures, or objects and unanticipated hazardous materials and /or
hazardous or dangerous circumstances, to complete previously identified tasks. Hull shall be compensated
for the actual time spent performing this additional work and other direct expenses and subcontractor fees
at the billing rates outlined in Table 2.
STANDARD OF CARE AND LIMITATIONS
Hull shall perform its services using that degree of care and skill ordinarily exercised under similar
conditions by reputable members of its profession practicing in the same or similar locality at the time of
Mr. Chris Dressel
S131072.400.0002
January 27, 2014
Page 8
service. No other warranty, expressed or implied, is made or intended by our proposal or by our oral or
written reports. The work will not attempt to evaluate past or present compliance with federal, state, or
local environmental or land use laws or regulations. Conclusions presented by Hull regarding the Site to
be investigated shall be consistent with the Scope of Work, level of effort specified, and investigative
techniques employed. Reports, opinions, letters, and other documents will not evaluate the presence or
absence of any compound or parameter not specifically analyzed and reported. The presence of
radiation, radon, lead, electromagnetic fields, and indoor air pollution will not be investigated, unless
specifically stated in the scope of work. Hull makes no guarantees regarding the completeness or
accuracy of any information obtained from public or private files or information provided by
subcontractors.
Again, thank you for the opportunity to conduct additional Phase II ESA activities at and off -Site of Ignition
Park. Please call me at (800) 241 -7173 or (317) 517 -6506 if you have any questions. If you approve
of this proposal, please sign the attached Task Order form and return it to my attention.
Respectfully Submitted,
Douglas G. Stuart, CHMM
Sr. Project Manager
CC: Lance Turley, Hull
Dan Cory, Plews Shadley Racher & Braun LLP
File
TASK ORDER
TO
PROPOSAL FOR PROFESSIONAL SERVICES
HULL & ASSOCIATES, INC.
TASK ORDER NO: 001
HULL PROJECT CODE: SBI072
PROPOSAL NUMBER: SB1072.400.0002
Subject to the terms and conditions of the above referenced Contract, the Consultant agrees to perform the
following Scope of Work as follows:
Coordinate activities of subcontractor to evaluate potential vapor intrusion issues off -Site; conduct
additional groundwater sampling to delineate the on- and off -Site plume at Ignition Park located near
Prairie Avenue and West Sample Street, South Bend, Indiana; and further amend the existing Remediation
Work Plan as further described in Hull document number SB1072.400.0001 dated January 21, 2014.
Task 1:
Document Preparation
$9,555
Task 2:
Vapor Intrusion Evaluation
$116,395
Task 3:
Install Temp. & Perm. GW Sampling Points
$77,685
Task 4:
Conduct 8 Quarterly GW Sampling Events
$85,814
Task 5:
Evaluate GW Remedy, ACA, Amend RWP
$11,330
Subtotal
$300,778
NO. OF COPIES OF DELIVERABLE: 2 hard copies 1 CD additional electronic copies as needed.
ESTIMATED TOTAL COST: $300,778
HULL & ASSOCIATES, INC. PROJECT CONTACT: Doug Stuart
CLIENT PROJECT CONTACT: Mr. Chris Dressel
CLIENT AUTHORIZATION:
DATE:
(Please return one signed original to HuQ& $VoRFLDW,/, (F.'V3LRMFV&Rntact and retain one signed original
I R U &OK),V UlFR 04.
HULL & ASSOCIATES, INC. JANUARY 2014
INDIANAPOLIS, INDIANA S131072.400.0002
TABLES
HULL & ASSOCIATES, INC. JANUARY 2014
INDIANAPOLIS, INDIANA SBI072.400.0002
TABLE 1
ON- and OFF -SITE PHASE II ENVIRONMENTAL SITE ASSESSMENT, etc.
CITY OF SOUTH BEND, INDIANA
IGNITION PARK/AREA A /FORMER STUDEBAKER SITE
Task 1 Document Preparation (Summary Letter, SAP, HASP, QAPP, etc.)
Estimated Cost
Labor $ 9,230
Miscellaneous Costs $ 325
Task 1 Subtotal $ 9,555
Task 2 Vapor Intrusion Evaluation
Labor $ 7,920
Subcontractor Costs (including markup) $ 107,800
Miscellaneous Costs $ 675
Task 2 Subtotal $ 116,395
Task 3 Install Temporary & Permanent GW Sampling Points
Labor $ 21,620
Subcontractor Costs (including markup) $ 50,722
Equipment $ 830
Supplies $ 513
Miscellaneous Costs $ 4,000
Task 3 Subtotal $ 77,685
Task 4 Conduct Quarterly GW Sampling Events (per event)
Labor
$
3,110
Subcontractor Costs (including markup)
$
6,006
Equipment
$
300
Supplies
$
911
Miscellaneous Costs
$
400
Task 4 Subtotal (per event)
$
10,727
Task 4 Subtotal (for 8 quarterly events)
$
85,814
Task 5 Evaluate GW Remedy, Assist with ACA & Prepare VAP RWP
Labor
$
11,080
Miscellaneous Costs
$
250
Task 5 Subtotal $ 11,330
TOTAL PROJECT BUDGET $ 300,778
HULL & ASSOCIATES, INC. JANUARY 2014
INDIANAPOLIS, INDIANA SBI072.400.0002.xls
:I.HULL
TABLE 2
MANAGEMENT STAFF
Principal................................ ............................... $180
Senior Project Manager .... ............................... $150
Project Manager ................. ............................... $125
Government & Community Relations ............. $110
ENGINEER
$100
Senior Engineer ................... ...............................
$140
Project Engineer .................. ...............................
$110
Engineer2 ............................... ...............................
$95
Engineer1 .................................. ............................$80
Senior Designer ......................... ............................$90
Designer................................... ............................... $75
HYDROGEOLOGIST
Senior Hydrogeologist ....... ............................... $140
Project Hydrogeologist ...... ............................... $110
Hydrogeologist 2 ...................... ............................$90
Hydrogeologist 1 ...................... ............................$75
2014 BILLING RATE
SCHEDULE
SCIENTIST
Senior Scientist ................. ............................... $140
Project Scientist ................ ............................... $110
Scientist2 ............................. ............................... $90
Scientist1 ............................. ............................... $75
SUPPORT STAFF
Senior GIS Specialist ...... ...............................
$100
GIS Specialist ..................... ............................... $75
SeniorTechnician ................ ............................... $70
Technician2 ......................... ............................... $60
Technician1 ......................... ............................... $50
Project Administrative Assistant ...................... $50
NOTES:
1. Hourly billing rates for personnel apply to actual time spent in meetings concerning the project,
preparing for such meetings, project coordination time, design activities, field and office
investigations, and travel time when job - related.
2. If personal vehicles are utilized, travel mileage is billed at the federal mileage reimbursement
rate. If company -owned vehicles are utilized, rental rates of $100 /day, $350 /week, or
$1,000 /month are used in lieu of travel mileage. If rental vehicles are utilized, the actual cost of
the rental and gasoline will be billed directly with no mark -up.
3. Air transportation fees are billed directly with no mark -up. Travel time is typically billed only for
that time actually spent flying to /from the project location and does not include layovers, delays,
etc.
4. Project reimbursable expenses such as reproduction by vendors, overnight shipping, meals, and
lodging associated with travel or extended field activities, etc. are billed directly with no mark -up.
5. Field equipment rented from outside vendors is billed directly with no mark -up. Field equipment
owned by Hull, including individual equipment items or groupings of equipment such as sampling
kits, are billed at competitive market - equivalent rates for daily or weekly rental.
6. 6uE FRC WF\AkY I HHVDLH E pled to the Client at a rate equal to the subcontractor fee multiplied by
1.1 WLHFRYHUHu(WFRCWF\6DOWEL(Wrisk and associated operational expense.
HULL & ASSOCIATES, INC. JANUARY 2014
INDIANAPOLIS, INDIANA SB1072.400.0002