AN ORDINANCE APPROPRIATING THE SUM OF $583,510.00
FROM THE CUMULATIVE SEWER BUILDING AND SINKING
FUND.
WHEREAS, engineering studies have been completed
outlining certain storm water flood control projects, and
WHEREAS, funds are no
acquisition, design engineering
priority projects, and
needed for appraisals, land
and construction of said first
WHEREAS, a Cumulative Sewer Building and Sinking Fund
has been established.
NOW, THEREFORE, BE IT ORDAINED BY THE COMMON COUNCIL
OF THE CITY OF SOUTH BEND, INDIANA:
SECTION I. That the sum of $583,510.00 be appropriated
from the Cumulative Sewer Building and Sinking Fund for the
projects and in the amounts set forth below:
Project I - 1970
Washington & 36th Street Storm Water
Detention Basin (Lagoon K) $159,960.00
Project II - 1970
Ponsha & 33rd Street Storm Water
Detention Basin (Lagoon A) 113,350.00
Project III - 1970
Sampson & Randolph Street Storm Water
Detention Basin ( #3) 294,000.00
Project IV - 1970
Chippewa & Main Street Storm Water
Improvements 16,200.00
TOTAL: 583,510.00
SECTION II. This ordinance shall be in full force and
effect from and after its passage by the Common Council, its
approval by the Mayor and the fulfillment of all statutory
requirements.
1st & 2nd READING 2 -9 -70
CCARI TEE OF THE WHOLE
PUB'IC 1; 1RI"' 2 -24 -70
3a
2 -24 -70
G ; L- D
PISSED 2 -24 -70
0
Member of the Common Council
FILED IN CLERR'S OFFICE
JAN 2 91970
KATHRYN L. BLOUGH
CITY CLERK, SOUTH BEND, IND.
Tvatmiffrt Uttar#
010 Ot Tom= (Qounril of t4v ( ng of ft d4 tocnd:
Your Committee Of the Whole
February 24, 1970
to whom was referred AN ORDINANCE APPROPRIATING THE SUM OF
$583,510.00 FROM THE CUMULATIVE SEWER
BUILDING AND SINKING FUND.
Respectfully report that they have examined the matter and that in their opinion The Ordinance go to the
Council as favorable.
irman
.n se sees aQML�i. r... ae we co.
January 14, 1969
CITY OF 80UTH BEND, INDIANA -- ENOINURINO DWPARTMENT
Project 01 (1970) Washington & 36th Street
Storm Water Detention Basin (Lagoon K)
estimated Cost
60,000 c.y. excavation A $2.00 $120,000.00
Sodding and seeding slopes 6,000.00
Land acquisition (36 lots) 24,Q00.00
Land acquisition costs 2,400.00
Engineering (6% x $126,000) 7,560.00
Total Estimates Project Goat - - - - $159,960.00
Project #11 (1970) Ponsha & 33rd Street
Storm Water Detention Basin (Lagoon A)
Lagoon Construction Cost including inlet
and outlet pipe 96,040.00
Land Acquisition (15 losts 0 $700 ea.) 10,500.00
Land Acquisition Costs 1,050.00
Wq ineering (6% x $96,040) 5,760.00
$113,350.00
Project VIII (1970) Sampson & Randolph Street
Storm Detention Basin (103)
Lagoon Construction Cost 69,000.00
Sewers in Detention Basin 113 Area 90,000.00
Land Acquisition 110,000.00
Land Acquision Costs 11,000.00
Engineering 14,000.00
$294,x00.00
Project IV (1970) Chippewa -Main Street
Storm Water Improvements
Construction Cost, 15,000.00
Engineering 1,200.00
$16,200.00
✓.�,�V�✓
c
$583,510.00