Loading...
HomeMy WebLinkAboutAppropriating $583,510.00 Cumulative Sewer Building and Sinking FundORDINANCE NO. 5154.70 Passed by the Common Council of the City of South Bend, 24, ,, 70 Presented by me to the Mayor of the City of South Bend, Indiana 24, ,,,70 Clerk )f Common Council Approved and signed by me c � / / 1QZ-0 Clerk 1 DEAL PRESS ORDINANCE NO. 5154 -70 AN ORDINANCE APPROPRIATING THE SUM OF $583,510.00 FROM THE CUMULATIVE SEWER BUILDING AND SINKING FUND. WHEREAS, engineering studies have been completed outlining certain storm water flood control projects, and WHEREAS, funds are no acquisition, design engineering priority projects, and needed for appraisals, land and construction of said first WHEREAS, a Cumulative Sewer Building and Sinking Fund has been established. NOW, THEREFORE, BE IT ORDAINED BY THE COMMON COUNCIL OF THE CITY OF SOUTH BEND, INDIANA: SECTION I. That the sum of $583,510.00 be appropriated from the Cumulative Sewer Building and Sinking Fund for the projects and in the amounts set forth below: Project I - 1970 Washington & 36th Street Storm Water Detention Basin (Lagoon K) $159,960.00 Project II - 1970 Ponsha & 33rd Street Storm Water Detention Basin (Lagoon A) 113,350.00 Project III - 1970 Sampson & Randolph Street Storm Water Detention Basin ( #3) 294,000.00 Project IV - 1970 Chippewa & Main Street Storm Water Improvements 16,200.00 TOTAL: 583,510.00 SECTION II. This ordinance shall be in full force and effect from and after its passage by the Common Council, its approval by the Mayor and the fulfillment of all statutory requirements. 1st & 2nd READING 2 -9 -70 CCARI TEE OF THE WHOLE PUB'IC 1; 1RI"' 2 -24 -70 3a 2 -24 -70 G ; L- D PISSED 2 -24 -70 0 Member of the Common Council FILED IN CLERR'S OFFICE JAN 2 91970 KATHRYN L. BLOUGH CITY CLERK, SOUTH BEND, IND. Tvatmiffrt Uttar# 010 Ot Tom= (Qounril of t4v ( ng of ft d4 tocnd: Your Committee Of the Whole February 24, 1970 to whom was referred AN ORDINANCE APPROPRIATING THE SUM OF $583,510.00 FROM THE CUMULATIVE SEWER BUILDING AND SINKING FUND. Respectfully report that they have examined the matter and that in their opinion The Ordinance go to the Council as favorable. irman .n se sees aQML�i. r... ae we co. January 14, 1969 CITY OF 80UTH BEND, INDIANA -- ENOINURINO DWPARTMENT Project 01 (1970) Washington & 36th Street Storm Water Detention Basin (Lagoon K) estimated Cost 60,000 c.y. excavation A $2.00 $120,000.00 Sodding and seeding slopes 6,000.00 Land acquisition (36 lots) 24,Q00.00 Land acquisition costs 2,400.00 Engineering (6% x $126,000) 7,560.00 Total Estimates Project Goat - - - - $159,960.00 Project #11 (1970) Ponsha & 33rd Street Storm Water Detention Basin (Lagoon A) Lagoon Construction Cost including inlet and outlet pipe 96,040.00 Land Acquisition (15 losts 0 $700 ea.) 10,500.00 Land Acquisition Costs 1,050.00 Wq ineering (6% x $96,040) 5,760.00 $113,350.00 Project VIII (1970) Sampson & Randolph Street Storm Detention Basin (103) Lagoon Construction Cost 69,000.00 Sewers in Detention Basin 113 Area 90,000.00 Land Acquisition 110,000.00 Land Acquision Costs 11,000.00 Engineering 14,000.00 $294,x00.00 Project IV (1970) Chippewa -Main Street Storm Water Improvements Construction Cost, 15,000.00 Engineering 1,200.00 $16,200.00 ✓.�,�V�✓ c $583,510.00 J - y