HomeMy WebLinkAboutAppropriating $72,500.00 Sewage Works Improvement FundORDINANCE No. 5811 -75
Passed by the Common Council of the City of South Bend, Indiana.
MARCH 10, �9 75
Clerk
IRENE K. GAMMON
v ' // w+��/y - President of Common Council
Presented by me to the Mayor of the City of South Bend, Indiana
Approved and signed by
MARCH 11
M
75
IRENE K. GAMMON
Clerk
ORDINANCE NO. 5 8 //- 17 5-
An Ordinance appropriating the sum of $72,500.00
from the Sewage Works Improvement Fund for Step
One of the laboratory renovation and enlargement.
WHEREAS: the plant expansion at.the Wastewater Treatment Plant is
nearly complete, and
WHEREAS: this additional plant places increased work loads and spaces
requirements on.our laboratory, and
WHEREAS: there exists a Sewage Works Improvement.Fund set up to.fund
plant improvements as they are needed, and
WHEREAS: Plans and Specifications and Costs Estimates for Step I have
been completed by the Department of.Public Works,
NOW THEREFORE BE IT ORDAINED by-the Common Council of the City of South Bend,
Indiana;
SECTION I: That the.sum of $72,500.00 is hereby appropriated from.the Sewage
Works Improvement.Fund for Step I, relocation of present vehicle
maintenance facilities to make room for laboratory remodeling.
This appropriation is to be administered by the.Bureau of
Sanitation as set forth below.
Fund Account
42 0260.0
Description Amount
Services Contractural $ 72,500.00
SECTION II: This Ordinance shall be in full force and effect from and after its
passage by the Common Council, approval by the Mayor, and the ful-
fillment of all statutory requirements for additional appropriations.
FILED IN CLERK'S OFFICE
1st READING e? -2 44 -7S FEB 19 1975
PUBLIC HEARING 3 - / O - 7 S
2nd READING
NOT APPROVED Irene Gammon
REFERRED CITY CLERK,. SOUTH BEND, IND.
PASSED
Towntarr 3trpurt
(To tllr Tommoa Moumil of the Tit# of 00ut11 lornb:
Your Committee of the Whole
to whom was referred
AN ORDINANCE APPROPRIATING THE SUM OF
$72,500.00 FROM THE SEWAGE WORKS
IMPROVEMENT FUND FOR STEP ONE OF THE
LABORATORY RENOVATION AND ENLARGEMENT.
Respectfully report that they have examined the matter and that in their opinion the Ordinance should be
recommended favorably to the Common Council.
Odell Newburn
Chairman
FRS[ FRFB6 v PUBLISHING CO.
CITY OF SOUTH BEND
South Bend, Indiana 46601
Jerry J. Miller
Mayor
Rollin E. Farrand, Sr., P. E.
Director, Public Works
Members of the Common Council
County /City Building
South Bend, IN 46601
Gentlemen:
Reply To; Department
of Public Works
February 17, 1975
There will be presented for your consideration on February 24, 1975, an
ordinance appropriating the sum of $72,500 from the Sewage Works Improve-
ment Fund for the construction of Phase I of the proposed laboratory
expansion.
If you will recall, this matter was discussed in caucus on December 9,
1975.
Due to the increased work load placed on our present laboratory staff
through more stringent testing and reporting requirements mandated by
the State Board of Health, the Environmental Protection Agency; and
because of the increased physical size of our Plant, our present labo-
ratory space is no longer adequate. With the increased amount of testing
required comes a need for increased floor space to perform the work.
Originally we had approached this problem with an addition to the present
laboratory as the answer. We soon found that this would be extremely
costly. Engineering estimates placed the minimum cost of this approach
at $170,000.
Upon reevaluating our position, it was decided that a more cost effective
approach would be to relocate our present garage facility and use this
structure after remodeling as the laboratory addition. In using this
approach, we are able to update our garage facility and laboratory facility
for less than the original anticipated cost of expanding only the
laboratory.
Members of the Common Council
Page 2
February 17, 1975
Our plans are to construct a steel pre- engineered building to be utilized
as the garage. This type of building will be quite adequate for use as
a vehicle maintenance center. The additional height in ceilings and doors
will enable us to service all of our equipment inside rather than doing
the large equipment outside. We will also be able to furnish adequate
ventilation, heating, and electrical outlets in work areas which now are
a problem. Through using this type of a building, and through Morgan
Peck doing the site and foundation work, we feel that the $72,500 we are
requesting now will be adequate.
Again, we state that this is only Phase I of a two -phase project. Any
funds not expended in the construction of the garage will, of course, be
held and used toward the moving and remodeling of the laboratory. Work-
ing only with the original estimate, this leaves about $92,500 to remodel,
update, and relocate the present laboratory. We would, of course, approach
you again for the second part of this project.
We are requesting the use of the Sewage Works Improvement Fund to accomplish
this project. This fund is supported by sewage rate revenues, and was
specifically set up in the original bond ordinance for capital improvement
projects of this nature. As of January 1, 1975, there was a cash balance
in this fund of approximately $540,000, with approximately $15,000 in
obligations.
Although there is no direct effect at the time of the completion of the
physical plant expansion and pay off by EPA, we estimate there will be a
balance of $500,000 which could be used as payback to the Improvement Fund,
as the laboratory expansion does qualify as a non - reimbursable construction
cost.
If you have any further questions, please feel free to contact either of
the undersigned at your convenience.
Very truly yours,
Rollin E. Farrand, P. E.
Director
Michael L. Vance
Fiscal Officer
REF:MLV:amc