HomeMy WebLinkAboutAppropriating $85,000 Cumulative Sewer Building and SinkingORDINANCE No. 5852 -75
Passed by the Common Council of the City of South Bend,
JULY 14, xq 75
'< A'—'" City Clerk
IRENE K. GAMMON
Presented by me to the Mayotlof the City of South Bend, Ind'ana
JULY 15
President of Common Council
4 - °z i City Clerk
IRENE K. GAMMON
ORDINANCE NO. S8sa- s
AN ORDINANCE APPROPRIATING THE SUM OF $85,000.00
FROM THE CUMULATIVE SEWER BUILDING AND SINKING
FUND FOR PROJECT CS -2 -MODEL CITIES SEWER SEPARATION
WHEREAS, engineering plans and specifications are needed to
construct the following project; and
WHEREAS, additional funds are now needed for these engineering
plans and specifications; and
WHEREAS, a Cumulative Sewer Building and Sinking Fund has been
established,
NOW, THEREFORE, BE IT ORDAINED by the Common Council of the City of
South Bend, Indiana,
1st READING
PUBLIC HEARING
2nd READING
NOT APPROVED
REFERRED
PASSED
Section I. That the sum of $85,000.00 be appropriated
from the Cumulative Sewer Building and Sinking Fund for
the project described below:
CS -2 Model Cities Sewer Separation $85,000.00
(52.0000.0 502 11)
Section II. This Ordinance shall be in full force and effect
from and after its passage by the Common Council, approval
by the Mayor, and the fulfillment of all statutory require-
ments for emergency funding.
G- ,2s -7S
-7- i'4 -75'-
- 7- /A-1 -'7S
-7 -7y - '7 s
11114 77
Member of the D �� ��.
0I signed only to provide an opportunity
for public discussion and Council action
on the issue.
FILED IN CLERK'S OFFICE
AN 18 1975
Irene Gammon
CITY CLERK, SOUTH BEND, IND.
(gatnmtttrr AIrpart
Xo tke tdomm u Mounrtl of the Tq of OvW4 11rna:
Your Committee Of the Whole
to whom was referred
AN ORDINANCE APPROPRIATING THE SUM OF
$85,000.00 FROM THE CUMULATIVE SEWER
BUILDING AND SINKING FUND FOR PROJECT
CS -2, MODEL CITIES SEWER SEPARATION.
Respectfully report that they have examined the matter and that in their opinion the Ordinance Should be
recommended favorably to the Common Council.
Odell Newburn
Chairman
......... .ueu..... m.
CITY OF SOUTH BEND
South Bend, Indiana 46601
Jerry J. Miller
Mayor
Rollin E. Farrand, Sr., P. E.
Director, Public Works
Members of the Common Council
441 County -City Building
South Bend, Indiana 46601
Subject: Model Cities Sewer Separation
Engineering Contract
Dear Sirs:
Reply To: Department
of Public Works
June 11, 1975
The contract for this design project was signed by the Board of Public
Works on October 27, 1972. This contract called for a fee based on a
percentage of the construction cost, the fee to be determined by a fee
curve which was made part of the contract.
The total estimated construction cost of this project is $2,438,913.30.
You may recall that a Federal grant of approximately $540,000 has been
made available for this construction.
Based upon the above referenced construction cost and a fee of 6.08 %, a
total engineering fee for this design work is estimated to be approximately
$148,285.93.
The original appropriation for this design contract was in the amount of
$66,000. We are now asking that the remaining portion of this fee, $85,000,
be appropriated so that the consultant can be paid.
Right -of -way is currently being purchased out of a previous appropriation
of approximately $100,000. It is anticipated that plans will be complete
and the project ready for construction advertising by the time the right -
of -way purchasing is completed.
Very truly yours,
Rollin E. Farrand, P. E.
Director
REF:der