HomeMy WebLinkAbout11303-26 Amending Chapter 20 of the South Bend Municipal Code to Establish Article 14 Containing Regulations Regarding Electric Vehicle Charging ORDINANCE No . 11303-26
Passed by the Common Council of the City of South Bend, Indiana
August 24, 26
20
Attest: 4VCity Clerk
Bianca L. Tirado
7:-.1
Attest: e72President of Common Council
Presented by me to the Mayor of the City of South Bend, Indiana
August 25, 20 26
l
City Clerk
Bianca L. Tira o
Approved and signed by me AyJ j t )1/ 20 26
it jtit., - Mayor
SoUIR 49 4
03C %�;ll 1f,1/1/'d
,,y' 1865
BILL NO. 51-26
ORDINANCE NO. 11303-26
AN ORDINANCE OF THE COMMON COUNCIL OF THE CITY OF SOUTH BEND,
INDIANA, AMENDING CHAPTER 20 OF THE SOUTH BEND MUNICIPAL CODE TO
ESTABLISH ARTICLE 14 CONTAINING REGULATIONS REGARDING ELECTRIC
VEHICLE CHARGING
STATEMENT OF PURPOSE AND INTENT
The City of South Bend ("City") owns and operates electric vehicle charging stations for
public use and has adopted a Community Electric Vehicle Charging Infrastructure Plan to guide
the equitable, reliable, and orderly expansion of charging infrastructure within the City; and
The City seeks to support access to electric vehicle charging while ensuring that City-
owned charging stations and designated electric vehicle parking spaces remain available for their
intended purpose; and
City-owned charging stations currently provide a limited period of charging at no cost,
hut the existing time limit has not consistently produced sufficient turnover or prevented vehicles
that are not actively charging from occupying designated charging spaces; and
Requiring vehicles occupying designated electric vehicle charging spaces to be actively
charging will promote turnover, improve the availability and efficient use of public charging
infrastructure, and support compliance with posted parking restrictions; and
Vehicles improperly occupying designated electric vehicle charging spaces should be
subject to removal under the City's existing abandoned vehicle and towing procedures; and
The operation of City-owned electric vehicle charging stations creates electricity,
network, administrative, repair, replacement, and maintenance costs for the City; and
A charging rate applied after the first two (2) hours of active charging will permit
reasonable public access while allowing the City to recover costs associated with the continued
operation and maintenance of its charging infrastructure; and
Revenues collected from the use of City-owned electric vehicle charging stations should
be deposited into the designated City fund to support the administration, operation, maintenance,
repair, and replacement of electric vehicle charging infrastructure; and
The installation of privately owned charging equipment within the public right-of-way
may create concerns regarding public ownership and control, utility coordination, maintenance
responsibilities, accessibility, pedestrian and vehicular travel, streetscape planning, and the
orderly use of public property; and
Privately owned electric vehicle charging stations should therefore generally be
prohibited within the public right-of-way in Downtown and Commercial districts, where
placement must remain consistent with coordinated City planning and the public use of streets,
sidewalks, parking areas, and other public infrastructure; and
Limited installations within the right-of-way in residential and mixed-use districts may be
appropriate when a property owner demonstrates hardship and obtains approval from the Board
of Public Works; and
The City should retain authority to approve, by written agreement, a privately funded
charging station in a Downtown or Commercial district when the proposed location is consistent
with City plans and the parties have considered whether the completed station will be transferred
to the City for public ownership and operation; and
These regulations are intended to promote the safe, reliable, equitable, and efficient use
of electric vehicle charging infrastructure; preserve public access to designated charging spaces;
recover reasonable operational and maintenance costs; clarify responsibility for equipment
placed within the public right-of-way; and protect the public health, safety, and welfare.
NOW THEREFORE,BE IT ORDAINED BY THE COMMON COUNCIL OF THE
CITY OF SOUTH BEND, INDIANA as follows:
SECTION I. A new Article 14, Sections 20-140 through 20-143, is hereby added to
Chapter 20, approved and adopted to read in its entirety as follows:
ARTICLE 14: ELECTRIC VEHICLE CHARGING
Sec. 20-140. The following definitions shall apply throughout this Article:
(a) ELECTRIC VEHICLE shall have the meaning set forth in Indiana Code 8-1-43-4, as
amended.
(b) ELECTRIC VEHICLE SUPPLY EQUIPMENT(EVSE) shall mean apparatus
installed specifically for the purpose of transferring energy between the premises wiring
and the Electric Vehicle.
(c) ELECTRIC VEHICLE CHARGING STATION shall mean any facility or EVSE that is
provided for public use specifically designated for use by electric vehicles to charge the
battery or other energy storage device of an electric vehicle.
(d) ELECTRIC VEHICLE(EV)PARKING SPACE shall mean any portion of a street,
parking garage or parking lot that is marked by logo and/or signage that conforms to
Indiana state law, designated specifically for the use of electric vehicle charging.
Sec. 20.141 PARKING IN SPACES DESIGNATED FOR PLUG-IN VEHICLES.
(a) Designated electric charging park spaces shall only be used for those vehicles which are
actively charging.
(b) The following uses are not permitted in designated electric charging spaces:
(1) Parking vehicles which are not actively charging; or
(2) Unauthorized vehicles parking in an electric vehicle parking space for twenty-four
(24)or more continuous hours.
(c) Vehicles are subject to removal under Chapter 20,Article 3 of the Municipal Code if
improperly parked within a designated electric vehicle parking space.
§ 20.142 FEE FOR USE OF CITY-OWNED ELECTRIC VEHICLE CHARGING
STATIONS.
(a) The first two hours of charging at a city-owned electric vehicle charging station will be
permitted at no charge.
(b) Any person using a City-owned electric vehicle charging station beyond the first two (2)
hours of active charging shall pay a rate based on electricity rates, operation, and
maintenance costs as approved by the EV Charging Rate Schedule.
(c) Rates set forth under this Section shall be collected at the time of active charging at a
City-owned charging station.
(d) Funds received by the City pursuant to this Article shall be deposited into Fund#211.
§ 20.143 PRIVATELY-OWNED ELECTRIC VEHICLE CHARGING STATIONS IN THE
RIGHT-OF-WAY.
(a) Except as expressly authorized by the City pursuant to subsection(c), privately-owned
electric vehicle charging stations are prohibited in the right-of-way in (DT) Downtown or
(C) Commercial districts.
(b) Privately-owned electric vehicle charging stations may be permitted in the right-of-way
in residential or mixed-use districts, including SI, S2, UI, U2, U3, UF, and NC, subject
to demonstration of hardship and approval by the Board of Public Works.
(c) The City may authorize the installation of electric vehicle charging stations as set forth in
subsection (a) above through a written agreement approved by the Board of Public
Works. Such agreement may require a property owner to fund, in whole or in part, the
design, installation, or construction of an electric vehicle charging station within the
right-of-way and transfer of ownership and operation of said electric vehicle charging
station to the City upon completion.
SECTION II.This Ordinance shall take effect after adoption by the Common Council and
approval by the Mayor and any publication required by law.
0)"---
Canneth J. Lee, Council President
South Bend Common Council
Attest:
Bianca L. Tirado, ty C rk
Office of the City Cler
Presented by me, the undersigned Clerk of the City of South Bend, to the Mayor of the
City of South Bend, Indiana on the 25th day of August , 2026, at 12_o'clock p.m.
41(411431
Bianca L. Tirado, C. lerk
Office of the City C_erk
n
Approved and signed by me on the 3 1 day of Alt) t- , 2026, at ' o'clock
fm. /
Jam Mueller, Mayor
Cit f South Bend, Indiana