Loading...
HomeMy WebLinkAboutRWDA Reimbursement from PSCDA for Four Winds Field Design - SignedSouth Bend Redevelopment Commission 215 S. Dr. Martin Luther King, Jr. Blvd., Room 301, South Bend, Indiana Redevelopment Commission Agenda Item DAT E : 8/20/2026 FROM: Joseph Molnar, Deputy Director DCI SUBJECT: PSCDA Reimbursement for River West TIF Four Winds Field Expansion Funding Source* (circle) River West; River East; South Side; Douglas Road; West Washington; RDC General; Riv. East Res. *Funds are subject to the City Controller's determination of availability; if funds are unavailable, as solely determined by the City Controller, then the authorization of the expenditure of such funds shall be void and of no effect. PURPOSE OF REQUEST: Reimbursement to the River West TIF for $2.6M from the PSCDA for costs for full design documents SPECIFICS: As part of the expansion and renovation of Four Winds Field, the Redevelopment Commission approved $2.6M from the River West Development Area funds to pay for the full design services toward the bidding and construction of the expansion of Coveleski Stadium. Afterwards, the City issued a bond utilizing the Professional Sports and Convention Development Area (PSCDA) fund to pay for full construction. The PSCDA captures funds directly from sales tax and other revenues generated by Four Winds Field this ensures that these funds remain local. Construction of the expansion and the renovation are largely completed. The design funds originally appropriated were in addition to the bond funding from the PSCDA and were intended to be reimbursed to the River West TIF when the PSCDA would be able to do so. The PSCDA funding has now reached the point where the $2.6M can be refunded to the River West TIF. Acceptance of this budget request will reimburse the River West TIF the funding amount. Staff recommends approval. ______________ ___________Pres/V-Pres ATTEST: __________ _______ _ Date: _____________ _______ APPROVED Not Approved SOUTH BEND REDEVELOPMENT COMMISSION August 27, 2026 ✓